Top-rated excavation pros.

Get matched with top excavation pros in Pierson, MI

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Top-Rated Excavation pros in Pierson - Updated Nov 2026

Avatar for NRE Excavating
NRE Excavating
4.9(
17
)
Building Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping - For Business

Serving Pierson, MI and surrounding areas

Approved

In business since 2017

Free estimates

Offers commercial services

"Had a huge maple stump in the front yard, from the time I got the estimate till the job was done was about 4 days. They came out and got started on it right away, worked straight through until it was finished. Leveled it out and cleaned the yard and driveway that my wife didn’t even notice the stump was gone. I’m going to pick up some seeds tomorrow to fill in the grass, I’m not including a finished photo because it’s absolutely pouring outside right now. But the job that was done above my expectations. Thank you very much and it was nice to meet you guys."
Home Demolition
Home Demolition
11 neighbors recently requested a quote
Recommended by56%of homeowners
Earthworm Dozing and Excavating, Inc.
4.7(
35
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+1 more

Serving Pierson, MI and surrounding areas

In business since 1996

Free estimates

Emergency services offered

"They were scheduled to come on Friday, but forgot. I had to call the office to find out what happened. They rescheduled the job on Saturday. Two people showed up and they really worked hard. The job was completed in no time and they cleaned up all the branches. I would have them again."
1728153
Large block retaining walls
1728154
 Awaiting final landscaping
1728155

+9

Recommended by96%of homeowners
Avatar for Krajniak LLC
Krajniak LLC
4.9(
14
)
Building Site - Preparation and Clearing - For Business

Serving Pierson, MI and surrounding areas

In business since 2024

Free estimates

Emergency services offered

"I contacted this company at 8am for a demolished mailbox. I was told they would be there at noon. They showed up right on time. They dug out the old post..through the snow…purchased a new post and mailbox, plus cement to stabilize it. I had a new mailbox by 2pm. It was a very professional job. I would highly recommend them for your projects."
Response time4 hrs
Response rate99%
Avatar for RM Groundworks
RM Groundworks
5.0(
6
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+3 more

Serving Pierson, MI and surrounding areas

In business since 2021

Free estimates

"RM Groundworks was reliable and on time. With multiple apparatuses RM groundworks can take care of all your back 40 needs. From rototilling to brush hogging, grappling and even stump grinding Rm groundworks makes foot plot prep a breeze. Year after year success is why I will continue to use RM groundworks."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+4

Recommended by100%of homeowners
Showing 1-10 of 43

FAQs for excavation projects in Pierson, MI

Depth depends on the type of installation and the regulations in your area. Water supply lines typically require 24 inches, while drainage pipes are often installed 36 inches below grade. For most general projects, a depth of 12 to 24 inches and a width of about eight inches is sufficient. Sticking to these specs keeps your utilities safe, code-compliant, and easier to maintain later.

When you need to run utilities underground, you’ve got two main options: boring or trenching. Boring employs directional drilling to install utilities without exposing a continuous channel, while trenching requires excavating an open channel to place utilities securely. Directional drilling preserves landscape integrity, whereas trenching provides direct access for installation, albeit with greater surface disruption. This clear comparison helps you select the method best suited to your project.

Plan on 12 hours to dig 100 linear feet when the soil is cooperative and you can work continuously. This timeframe applies when work is performed consistently and methodically. Factors such as rocky soil, tree roots, obstructions, and frozen ground increase the overall duration, demanding extra planning and effort. Comprehensive operational planning ensures that every challenge is managed efficiently and the project is completed on schedule.

If you want your yard to look untouched, laying fresh sod over the trench is the quickest fix. New sod needs 30 to 45 days to root and blend with the rest of your lawn. A local sod pro can provide you with a firm timeline and tips to ensure the grass takes hold and maintains your curb appeal.

The Pierson, MI homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.