Top-rated shower installers and replacers.

Get matched with top shower installers and replacers in Geneva, GA

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Shower installers and replacers in Geneva

Avatar for Watkins Home Improvement
Watkins Home Improvement
4.6(
36
)

Serving Geneva, GA and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

"Ronnie and his team did an excellent job of completing my projects. They installed a new metal roof and rebuilt a porch including demmolition and replacing the porch roof. He and his team were courteous and efficient completing all the requested work in one day. Ronnie completed my projects on time and below the originally quoted price. The quality of materials and workmanship were high. He arrived on time at the time promised and completed everything I asked plus a few extras at no additional charge. Thanks for a job well done Ronnie and team!"
Remodeling - General Project
General Remodeling Project
Luxurious pressure washing and painting
Same day installation
Kitchen renovation

+181

Response time2 days
9 neighbors recently requested a quote
Recommended by88%of homeowners
Avatar for Handyman Unlimited
Handyman Unlimited
4.3(
19
)

Serving Geneva, GA and surrounding areas

Approved

In business since 1989

Free estimates

Warranties offered

"I'm extremely happy with the work that Handyman Unlimited did. They were careful with my furnishings and cleaned up after their work. I would definitely hire them again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+23

Response time8 hrs
Response rate93%
18 neighbors recently requested a quote
Avatar for Dream Baths Of Alabama
Dream Baths Of Alabama
4.1(
74
)

Serving Geneva, GA and surrounding areas

In business since 1992

Free estimates

"Great.  I had this work done just over a year ago (should have submitted review sooner).
Estimate.  Charlie examined bathroom, had plenty of samples of options to review, and provided firm fixed quote.  There were some material issues that I'll note below.  At no time did the final cost change.
Timeline.  Installation began about a month or so after I accepted the quote and paid half down for material.  I think Charile was ready in about 2 weeks, but I had business travel.  Working together to find a common acceptable period for installation was easy.
Installation.  The first day Charlie showed up with a crew of 4 to take care of the electrical work (did have another ceiling fan installed) and demolition.  Following that, there were 2 full time workers on site.  They worked long hours, well over 8 hour days.  Normall, the job would have taken about a week.  I'll give more detail on the one issue below that drew the task out longer.  The guys were good about taking care not to impact the rest of the house (carpet, etc.).  After install, they did a good job cleaning up.
During the install, there were a few minor options ... how to frame the door, orientation of tile, the color of the tile, etc.  The crew provided options and good advice (I'm no kind of interior decorator).  The part of the service was excellent.
Quality.  I have done basic carpentry and electrical work.  I believe the quality of the work to be good to excellent, both what you see and what was done "behind the dry wall."  The work that you can see is excellent.
Material.  I was a little worried about the material used for the walls as opposed to tile.  I'm pleased to say I'm more than happy with the "acrylic" (I think that's correct) walls as well as base and door.
Only issue.  The base received was not the correct one.  The second base received had a quality issue.  They guys pointed this out to me.  I'm sure it cost them money out of their pocket / profit to spend the extra time on site.  My take away from this was the guys were MY quality advocates and did what was necessary to ensure the highest quality product was used and the job was done right the first time!  Things happen.  The question is how well does your contractor support you.  While I wasn't crazy about the delay (about 3 days, not major for me).  I was thrilled the issue was immediately brought to my attention and resolved even though it took extra effort on their part.
Overall job outcome.  I feel what was quoted was provided.  Very satisfied.
1 year review ... I remain satisfied.  I have had zero issues.  Other than the glass doors (which are famous for requiring cleaning when used for bath doors - this was noted before installation).  Is the biggest maintenance job.  Caring for the bath itself has required average to minimal effort.
Give Dream Bath / Charlie a call before you have your bathroom remodeled!
"
Dream Baths

+15

Recommended by82%of homeowners
Avatar for Affordable Handyman Service
Affordable Handyman Service
4.5(
143
)

Serving Geneva, GA and surrounding areas

In business since 2007

Free estimates

Emergency services offered

"Overall it  went well and the job was completed.  I had been scheduled for September and was then was told it would be in October.
After that job was finished I also ask for an estimate to tile a small bathroom and was given a estimate.  Jason told me he would have his office person call and they would schedule the job. I never got the call so I had someone else do the work. I know this was a small job but I was told that he would take the job and after paying him around $3500 for the first job never got a call back on the $300.00 smaller job.
"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+9

Recommended by93%of homeowners
Avatar for Revamp, LLC
Revamp, LLC
4.7(
172
)

Serving Geneva, GA and surrounding areas

In business since 2017

Free estimates

Emergency services offered

"I had a bathroom transformation from Revamp, LLC. They arrived on time on the first day and ready to go to work. A walk in tub was removed and replaced with a tub, drywall, walls and beautiful shower. An old vanity was replaced with a new one. Everything was done in 2 days. I am very pleased with my new bathroom and would certainly recommend them to anyone."
Response time4 hrs
Recommended by94%of homeowners
Avatar for Shawn Dodson Remodeling
Shawn Dodson Remodeling
5.0(
9
)

Serving Geneva, GA and surrounding areas

Free estimates

Emergency services offered

"Honesty and Integrity is what holds us together."We specialize in most all aspects of home remodels from wood restoration to adding new windows to your home and much more. Check out our website at: www.shawndodsonremodeling.info Most of our business has been concentrated mainly on our great customer referrals and the quality and professional work we do.We are currently expanding and adding new valued agents in our network of seasoned professional's.Shawn Dodson generally runs operations for past year and a half on his own and only accepted customers through referrals.With such a high demand for services in this area we have decided to stretch out and offer services not only to those referred through our loyal customers we currently service.but as of November we decided to venture out and invite others to reap the great benefits through our services. Don';t wait!!!! Step forward with your remodel ideas and let us turn it into the reality you've waited for. Don't let your neighbor have the most beautiful deck in the neighborhood..Pick up the phone and call us today.We generally respond to calls and emails at all hours of the night and generally will be at your location with four to six hours same day estimate has been requested. .

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+12

Recommended by100%of homeowners
Avatar for Jenkins Construction Inc.
Jenkins Construction Inc.
4.6(
11
)

Serving Geneva, GA and surrounding areas

In business since 2019

Free estimates

Emergency services offered

"Would definitely use again. Very polite and knowledgeable. Would not leave until he made sure we were completely satisfied with the work. Went above and beyond on alot of small things requested."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+29

Recommended by100%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)

Serving Geneva, GA and surrounding areas

In business since 2006

Credit card accepted

"Jill was very pleasant to work with, taking care to assure that specifications were clear & and our preferences were respected.
She provided two complete design layouts as options to choose from before further design work was done. After one was selected, she provided great ideas for furnishings (with distinct measurements,)
appropriate for the setting , accessories, and even paint colors, and samples to work with.
It was a great help to have her assist me, giving me confidence to move forward with furnishing our new home.
I would never have anticipated that one could be so effective with design via email!
Very pleased with results!
"
Recommended by55%of homeowners
Showing 1-10 of 19
FAQs for shower installation and replacement projects in Geneva, GA

Replacing your tub with a shower can modernize your bathroom and improve accessibility, often providing a high return on investment. However, if it's the only bathtub in your home, removing it may decrease resale value, as many buyers look for at least one bathtub. Consider your long-term plans and consult a real estate professional if resale value is a concern.

While showers cost slightly more to install than tubs, the overall expense depends on various factors such as materials, size, and features. A tub installation costs $2,400 to $8,800 on average, whereas showers average $2,000 to $9,400. Custom designs, luxury fixtures, or extensive plumbing work can increase costs for both options. It's important to assess your specific needs and budget when deciding between installing a shower or a tub.

Converting a tub to a shower generally takes between one and three days. The timeline depends on the complexity of the project, materials chosen, and whether plumbing modifications are necessary. Installing a standard prefabricated shower can be completed quickly, while custom tile work or extensive plumbing changes may extend the project's duration. Planning accordingly can help minimize disruptions during the conversion.

Converting a tub to a shower offers several benefits, including saving space and making your bathroom feel more open and modern. Showers improve accessibility, especially for those with mobility challenges, by eliminating the need to step over a high tub wall. Additionally, updating to a stylish shower can enhance your bathroom's aesthetic appeal and may increase your home's resale value if another tub is available elsewhere in the house.

Choosing between a shower stall and a custom shower depends on your budget and preferences. Prefabricated stalls are less expensive and faster to install but offer limited styles. Custom showers allow personalization of size, materials, and features but cost more and require professional installation. Evaluate your needs and budget to select the best option for your space.

If you’re converting a tub to a shower, you may want to consider remodeling your whole bathroom. The ROI on bathroom remodels is high (over 70%), so you can enjoy an upgraded bathroom while you live in your home and get your money back if you decide to sell later. The average cost to remodel a bathroom is around $6,600 to $16,600, so factor in this price range when you’re budgeting for your project.

Converting a tub to a shower alone isn't easy to DIY, so look for a bathroom remodeler near you if you decide to take on a larger bathroom remodel to ensure it's done correctly.

The Geneva, GA homeowners’ guide to shower installations and replacements

From average costs to expert advice, get all the answers you need to get your job done.