
Angi Approved
Super Service Award Winner
In business since 2019
Free estimates
Emergency services offered
"It was carefully thought out and had to be completely taken down to the original pipes and plumbing in a bathroom 65 years old. The bathroom did not meet requirements or even the parts required now, so everything had to be measured and fitted with updated materials. Added to that, the house was not grounded electrically. All new breakers had to be installed with GFI connections. A window in the shower wall was removed, and the wall and vinyl siding removed and replaced. Insulation was installed in the attic, with new light fixtures, fan, and heater in the ceiling of the shower/tub. All of the very old ceramic tile had to be removed from very old flooring, and old crumbling wall tiles throughout the bathroom. The bathroom was originally 2 small rooms with 2 sinks and 2 toilets. It’s now a whole nice-size bathroom, with one toilet, a double sink, a linen closet, and storage space. The walls between had to be removed, and 4 doors removed. This was a huge time-consuming job, and Mr McGilliad did every step, communicating with me to ensure that I approved of changes made. My new bathroom is beautiful. I would love to have him back when I need anything done with care and experience and kindness again!"












