
Serving Poland, IN and surrounding areas
In business since 2009
Free estimates
Credit card accepted
"Flooring looks great and they had a quick turnaround time to get the job done. Would definitely hire again for flooring and carpet!"





+64


Serving Poland, IN and surrounding areas
In business since 2009
Free estimates
Credit card accepted
"Flooring looks great and they had a quick turnaround time to get the job done. Would definitely hire again for flooring and carpet!"





+64

Serving Poland, IN and surrounding areas
In business since 2020
Free estimates
Credit card accepted
"Sam did a fabulous job on my kitchen floor. The floor was stripped of stain, buffed and then coated with clear poly and it is gorgeous. They even stripped the wood registers to match the floor. Courteous, timely, professional and friendly, job very well done."

Serving Poland, IN and surrounding areas
In business since 2005
Free estimates
Emergency services offered
"They did a great job patching all of the holes we had. They were seamless and we were able to paint over them without any issues."





+133

Serving Poland, IN and surrounding areas
In business since 2010
Free estimates
Warranties offered
"They guys that redid our floors were great workers and friendly. I believe they went above and beyond to get our old 1956 hardwood floors looking like new. We were very happy with the whole project."

Serving Poland, IN and surrounding areas
Free estimates
Emergency services offered
Credit card accepted
"After receiving a few other estimates on a sunroom addition plus a screened in porch, we decided to go with Legacy Windows. Mark’s estimate was in the middle of the other estimates and he offered much more flexibility than the other companies we spoke to in terms of customization. He is a great salesman with previous marketing experience. We signed our contract on April 10th. We were told that Mark and his crew were finishing a room and would be able to start in 2-3 weeks with a timeframe of 6-8 weeks for completion of our room addition project. The budget and timeframe worked well for us, so we decided to add replacement windows for the rest of our house (11 windows total). Several weeks went by and our project had not yet started so we followed up with Mark. We were told that there were issues with his current project (did not pass inspection) and it would push our start date back due to the workmanship repairs. During this time period before any work began on our project we would communicate often with Mark to check on the status of our project. The really frustrating thing about working with Mark is his inability to fulfill commitments he would make to us in regards to project timing and when things would be done. Our primary communication with him was via text messages and time after time he would tell us, “we should be starting next week” or “we are going to be making up for lost time quickly” and time would pass and it just wouldn’t happen. Work on our project began when our existing windows were replaced in early June. The foundation for the expansion was finally started in late June and framing started in early July (roughly 3 months after signing the contract). The first crew completed the framing, hired the shingles out, installed some of the cedar siding, and installed one wall of windows. We were seeing decent progress after having such a long wait in the beginning, all the while the commitment issue just kept popping up. We would get a text saying something like, “going to be at the house tomorrow with some stone samples” and he wouldn’t show up. It was annoying, but progress was being made and we were happy with how the expansion was taking shape so we were willing to overlook it. Sometime toward the beginning of August (roughly 4 months after signing the contract), work just stopped. Again, when we would reach out to Mark asking about the status of our project we would be told, “I’ll have an action plan later this afternoon” or “we want to get everything we done we can this week” or “the crew will be there tomorrow and we will be working all week on your project trying to finish”. In the meantime, nothing would be done and we would repeat the process. This went on for over 3 weeks, during this time there was absolutely no work done. Large piles of construction trash and building materials sat in our yard during this time. A great deal of the usable wood began to warp and I am sure that ultimately materials had to be tossed from being left in the elements for so long. After a couple weeks I finally moved a significant portion of the usable wood up onto the deck so it would at least be partially protected. We found out that there was an issue with the electrical and Mark had decided to let Crew #1 go as they were not meeting his expectations, but it was not communicated to us until the end of the over 3 week period. A second crew then arrived who Mark said usually only did work for him on the south side of Indy (we live in Lebanon), but he wanted to get our project back on track. There seemed to be little to no communication between the crew and Mark on what they were supposed to work on so we had to explain to them what was in the contract to be completed. Crew #2 also started making good progress, they finished the cedar siding, got the rest of the windows installed in the sunroom as well as installing the sunroom ceiling. About this time, which was at the beginning of September we had a separate crew come out to do the drywall. Mark recommended them very highly. As it turned out, the drywall was not properly installed or insulated (in some walls there was no insulation), and ultimately it had to be taken down and redone by Crew #2. Crew #2 seemed to be doing a really good job and we were quite pleased with their progress and the quality of work they were doing for us. They were replaced by Crew #3 sometime in mid-September. We were never told why they were replaced, but Crew #3 was much closer to where we lived so I assume that had something to do with it. Much like when Crew #2 started, there seemed to be little communication between Crew #3 and Mark on what they were supposed to work on. So we again had to explain what was in the contract to be completed. All through the process, the commitment issues mentioned previously continued. We were not as happy with the quality of the work done by Crew #3 as we had been by Crew #2 (or even Crew #1), but they did finally complete for the project for us and after (3) failed attempts we finally received a pass from the building inspector on his final inspection. When Crew #3 decided they were finished they never came back, we communicated multiple times with Mark about the remaining punch list items to no avail and ultimately decided to finish most of the small punch list items ourselves instead of waiting any longer for them to finish (clean up, sanding / finishing drywall, etc.). We love the way the sunroom and covered porch area turned out. From contract signing until the end it took a little over six months, but in Mark’s defense he did agree to let us add a brand new window in the dining room of our house to tie everything together at no cost to us as appreciation for our patience. There are things that we liked about Mark’s company and things we didn’t, I have tried to summarize each category as follows: Positives • Price seemed reasonable • It is truly a custom build, no problem with changes we had at any point • Love the way it turned out, looks amazing • Mark seemed to genuinely care about the quality of the product he was delivering to us (he replaced the cedar shakes that had been installed by Crew #1 because he wasn’t happy with the quality Negatives • Our project seldom felt like it was a priority, part of the reason it took so long was because they were over committed on other projects • Commitment Issues (addressed previously) • Construction Trash left in our yard for months • We cleaned up inside more than they did, I understand drywall work is messy. They never swept up any of the dust and they didn’t clean up any of the clumps of dried drywall mud all over the floor. • We finished some of the minor punch list items, just to be done."





+70

Serving Poland, IN and surrounding areas

Serving Poland, IN and surrounding areas
In business since 2005
Free estimates
"Flawless Floors far exceeded my expectations on not only the quality of their work but also their price. Francis Blair and his team did drywall work for me as well as tile work in my bathroom and laundry room. He was very timely, organized, and had the necessary tools to do a flawless job. This company puts their customers first. For example, they worked late hours and went out of their way to help us get re-situated into our home. I am extremely thankful that I hired this company to do my work and will definitely be using them in the future.
"





+26

Serving Poland, IN and surrounding areas
In business since 2016
"It went very well. The paint job looks great. I let them choose the color. There were no paint drips on the sidewalks or the house, they cleaned up when they were finished. We had quotes for much higher. They are very nice and easy to work with."





+8

Serving Poland, IN and surrounding areas
In business since 2007
Free estimates
Emergency services offered
"1. They are very good people to work with
2. They listen to the requirements, suggestions , and suggest improvements .
3 They are very familiar with the latest methods and tools of their profession
4 They discuss the pros and cons of the materials that can be used
5 They seem to have a network of workers they can draw upon when they need additional help
6 They do not just finish the job but they like to do it right
7. Once they schedule a job they show up and start the work
"





+39

Serving Poland, IN and surrounding areas
In business since 2023
Free estimates
Emergency services offered
"This review and cost is for 2 laminated flooring installation projects completed at 1 week intervals. The job site was 1.5 hrs driving distance one way. I provided the materials. Rojos Flooring was on schedule, kept the interior clean, helped with disassembling and reassembling a bed frame and hanging doors to work on furnished rooms, did not cut corners on installation (one room needed a 2 days process to level the sub-flooring), returned to finish the 2 day job on a Saturday, offered competitive pricing."





+14
From average costs to expert advice, get all the answers you need to get your job done.

Use this guide to budget for vinyl flooring installation, exploring how factors such as the space size, flooring type, and labor rates affect your total bill.

Budget for the cost to refinish hardwood floors based on factors such as square footage, wood type, labor, refinishing method, prep, task type, and more.

Sagging floor repair costs vary based on materials and severity of damage. Learn to budget for subfloor repairs and water damage restoration.

Laminate flooring installation costs depend on plank style, finish, thickness, and room size. Explore all the cost factors before starting this project.

This guide breaks down the cost to repair laminate flooring. Major cost factors include material quality, surface area, and the type of damage.

Wondering who installs vinyl flooring? Learn whether to hire flooring companies or contractors, what to expect, and costs per square foot