Top-rated deck or porch build or replacers.

Get matched with top deck or porch build or replacers in your area

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Deck or porch build or replacers in Richmond

Avatar for S B Restoration Services, Inc.
S B Restoration Services, Inc.
533 Julep Road
4.67(
2
)
Approved Pro
S B Restoration Services, Inc.
533 Julep Road
4.67(
2
)
Approved Pro
Customers say: Quick response
Recommended by 100% of Angi customers
Recommended by 100% of HomeAdvisor customers
38 years of experience

SB Restoration Services Inc. is committed to providing our clients with the absolute top of line restoration and remodeling services. From the first phone call to the final handshake we are with you every step of the way. For 17 years we have been providing Remodeling, New Construction, Windows, Roofing and Siding, Light Commercial, and Fire and Water Damage Repair Services. We have maintained our solid reputation through honesty, communication and good old fashioned hard work. To back that up, we provide every client with a 5 year workmanship warranty because we stand behind what we do. We are located in Waite Park, MN with a service radius of 60 miles.

"John was great to work with. He kept in contact so I knew what they were doing each day. He provided a calendar of the work at the beginning of the project and they stayed on schedule. Keith was great on site as well."

Kim K on April 2011

SB Restoration Services Inc. is committed to providing our clients with the absolute top of line restoration and remodeling services. From the first phone call to the final handshake we are with you every step of the way. For 17 years we have been providing Remodeling, New Construction, Windows, Roofing and Siding, Light Commercial, and Fire and Water Damage Repair Services. We have maintained our solid reputation through honesty, communication and good old fashioned hard work. To back that up, we provide every client with a 5 year workmanship warranty because we stand behind what we do. We are located in Waite Park, MN with a service radius of 60 miles.

"John was great to work with. He kept in contact so I knew what they were doing each day. He provided a calendar of the work at the beginning of the project and they stayed on schedule. Keith was great on site as well."

Kim K on April 2011


Avatar for Decks Unlimited
Decks Unlimited
590 3rd St E
4.85(
52
)
Approved Pro
Decks Unlimited
590 3rd St E
4.85(
52
)
Approved Pro
Customers say: Quality work
Recommended by 94% of Angi customers
Recommended by 94% of HomeAdvisor customers
730 local quotes requested

Specializing in decks, porches and gazebos in the Minneapolis and St. Paul area. Utilizing only the highest quality craftsman and building materials for all our projects – so every job runs smoothly and fast! Quality Decks, Porches and Gazebos Built Since 1984. Family owned and operated.

"We LOVE our decks. We had a big complicated project and it was no problem for Decks Unlimited. Beautiful mahogony Azek deck, Westbury aluminum railings & deck lighting. Randy & his crew are great. We have already recommended to others and would definitely hire again."

Julie O on August 2019

Specializing in decks, porches and gazebos in the Minneapolis and St. Paul area. Utilizing only the highest quality craftsman and building materials for all our projects – so every job runs smoothly and fast! Quality Decks, Porches and Gazebos Built Since 1984. Family owned and operated.

"We LOVE our decks. We had a big complicated project and it was no problem for Decks Unlimited. Beautiful mahogony Azek deck, Westbury aluminum railings & deck lighting. Randy & his crew are great. We have already recommended to others and would definitely hire again."

Julie O on August 2019


Shimota Project Management
5.00(
1
)
Shimota Project Management
5.00(
1
)
Customers say: Quick response
Recommended by 100% of Angi customers
Recommended by 100% of HomeAdvisor customers

We are a general contractor that will take on any project of construction.

We are a general contractor that will take on any project of construction.


Allstar Construction
5145 Industrial St
4.22(
45
)
Allstar Construction
5145 Industrial St
4.22(
45
)
Customers say: Terrific value
47 years of experience

Allstar Construction is your area expert for roofing, siding, windows, gutters, stone and masonry work, and other exterior construction services. We work with homeowners, builders and architects, housing associations and commercial building owners. Allstar is certified as a Slate Crafter Specialist, GAF Master Elite Contractor and Owens Corning Preferred Contractor. The company is also a member of the Better Business Bureau, National Association of Home Builders, and Twin Cities Building Association. Some of the brands we work with include: • James Hardie Siding • Alside Vinyl • GAF Timberline Shingles • Anderson Windows and Doors • Duration Shingles • Eagle Windows • Mastic by PlyGem Siding • Marvin Windows and Doors • DaVinci Roofscapes • EZ Breeze Deck Enclosures • InsideOut Underdecking

"Preamble: I purchased my home from a party who had a new roof installed by All Star in October 2013. The home was purchased in August of 2014, and was specifically advertised as having a brand new roof among a few other things. The following account is factual and objective. I am trying to check my feelings toward All Star and focus on the full consumer experience. December 2014: Had the scuttle attic completely re-insulated (blown and spray foam) -- including the area by the chimney. All work inspected by my municipality. June 2015 (less than 2 years after install of the new roof): During a remodel in our home, we witnessed some new and historic water staining to the drywall being installed near the hearth of our home. Some of this staining was new from a rainstorm we had the day before, and other was more historic -- from previous roof issues relating to water. I pulled permitting records and found All Star did the roof back in 2013. I contacted them to come out and inspect the roof for leaks. All Star came and stated that they believed the chimney to be the culprit -- recommending that it be sealed in mortar cracking. Sealing was completed shortly thereafter. June 2016 (less than 3 years after the new roof was installed): I was having 2 different plywood pieces of soffit replaced, and noticed quite a large area of dry rot under the soffit once it was removed (this dry rot was directly below the historic drywall staining I mentioned earlier). A couple joists were rotten and not structurally sound, and some of the decking was rotten as well. There was some restorative work done to the decking, but the rest of material should have been repaired BEFORE a new roof was installed since the area was easily accessed. I called All Star and the agent stated that they would look into why that wasn't done (this gentleman was "new" to All Star and that the work predated him). This agent also stated that this "didn't look like All Star quality work". I was then told that the records they had on file showed that the former homeowner had passed away during the install. The agent suspected this was why they didn't address the bad material -- presumably because they wanted more money to address the rotten timber (this is my personal speculation). Since the area was dry and I didn't see any signs of new moisture, I elected to have the person repairing the soffit sister up a couple new 2x4s to strengthen the area and reseal it. Summer 2017: I had the chimney redone by a master mason. All tuck pointing was done above the roof deck. March 2018: I witnessed a small amount of water slowly weeping from the soffit where the dry rot was found in 2016 (under the fascia -- coming from within the roof). It wasn't a great deal of water, but because I knew the area had been of concern in the past, I wanted to have All Star look at it. They came out promptly and took a look at the affected area. They also crawled around in the scuttle attic to see what was evident in that area. After looking for 10-15 minutes, they stated that they thought the attic insulation needed more work done by the fireplace, and that the area may be producing trace amounts of moisture from warmer air escaping into the cold attic in the winter -- in turn causing frost that turns into the small amount of water during melting. They also said it could be as a result of heaving of ice from melt and thaw on the roof itself. The conclusion of that visit was that they would come back and look at the roof once the snow melted (within a week or two), and pull together numbers for what they proposed for insulation work in the event that was the culprit. April 2018: I receive an email quote from All Star with projected costs for tearing off the roof by the chimney, adding in new insulation and rebuilding the roof in the affected area. $4,500 worth of work for a roof that wasn't even 5 years old -- and with a track record of documented historical issues. I point out to All Star my frustration that they're asking for a substantial amount of money without actually confirming the root cause of the problem -- or even visually inspecting the roof free of snow. At this time, I also questioned why the material under the new roof wasn't properly addressed (the historic drywall staining, or the couple rotten 2x4s). This was a clear indication that the area was problematic when the roof was replaced in 2013. AND, if they had the roof off in 2013 when they repaired it and saw this damage, why would they not have addressed this insulation concern then as well?... Even if the consumer decided they didn't want to pay more for the fix, I would think it was a necessary enhancement to avoid a potentially chronic problem. Their response was neither helpful or solution-oriented. They cited that the roof is out of the statutory 2 year warranty mandated by the state, and that the contract was executed with the former owner -- not me. Essentially, they claimed that they owed me nothing as someone who was not party to the original contract (the contract they just argued was already satisfied, since 2 years had elapsed). I stated that this wasn't a satisfactory conclusion, and that I wasn't asking for free work to be done -- just that we (All Star, and the consumer) work together to find an affordable solution where both parties can rest knowing the issue had been addressed properly. After receiving another email shirking responsibility of any kind but stating that they'd be happy to do the proposed work, I stated that I would simply leave my comments with the BBB and other word of mouth. I then received another email from the All Star offices (Jamie) stating that they would no longer even visit the property to talk about solutions. I placed a call to Jamie (and left a voicemail) in hopes that we could still civilly discuss options that don't involve me halfway re-roofing my home 5 years into the "new roof". I received no return call. My experience with All Star was unfortunately not a good one. Even with supporting evidence (dating back to within the 2 year warranty period), and backed by common sense (you don't build on bad materials when you know of an issue -- especially when you have the opportunity to resolve it with a couple pieces of timber and some spray foam), All Star elected to frustrate a consumer instead of helping them find a respectful solution."

Joshua A on April 2018

Allstar Construction is your area expert for roofing, siding, windows, gutters, stone and masonry work, and other exterior construction services. We work with homeowners, builders and architects, housing associations and commercial building owners. Allstar is certified as a Slate Crafter Specialist, GAF Master Elite Contractor and Owens Corning Preferred Contractor. The company is also a member of the Better Business Bureau, National Association of Home Builders, and Twin Cities Building Association. Some of the brands we work with include: • James Hardie Siding • Alside Vinyl • GAF Timberline Shingles • Anderson Windows and Doors • Duration Shingles • Eagle Windows • Mastic by PlyGem Siding • Marvin Windows and Doors • DaVinci Roofscapes • EZ Breeze Deck Enclosures • InsideOut Underdecking

"Preamble: I purchased my home from a party who had a new roof installed by All Star in October 2013. The home was purchased in August of 2014, and was specifically advertised as having a brand new roof among a few other things. The following account is factual and objective. I am trying to check my feelings toward All Star and focus on the full consumer experience. December 2014: Had the scuttle attic completely re-insulated (blown and spray foam) -- including the area by the chimney. All work inspected by my municipality. June 2015 (less than 2 years after install of the new roof): During a remodel in our home, we witnessed some new and historic water staining to the drywall being installed near the hearth of our home. Some of this staining was new from a rainstorm we had the day before, and other was more historic -- from previous roof issues relating to water. I pulled permitting records and found All Star did the roof back in 2013. I contacted them to come out and inspect the roof for leaks. All Star came and stated that they believed the chimney to be the culprit -- recommending that it be sealed in mortar cracking. Sealing was completed shortly thereafter. June 2016 (less than 3 years after the new roof was installed): I was having 2 different plywood pieces of soffit replaced, and noticed quite a large area of dry rot under the soffit once it was removed (this dry rot was directly below the historic drywall staining I mentioned earlier). A couple joists were rotten and not structurally sound, and some of the decking was rotten as well. There was some restorative work done to the decking, but the rest of material should have been repaired BEFORE a new roof was installed since the area was easily accessed. I called All Star and the agent stated that they would look into why that wasn't done (this gentleman was "new" to All Star and that the work predated him). This agent also stated that this "didn't look like All Star quality work". I was then told that the records they had on file showed that the former homeowner had passed away during the install. The agent suspected this was why they didn't address the bad material -- presumably because they wanted more money to address the rotten timber (this is my personal speculation). Since the area was dry and I didn't see any signs of new moisture, I elected to have the person repairing the soffit sister up a couple new 2x4s to strengthen the area and reseal it. Summer 2017: I had the chimney redone by a master mason. All tuck pointing was done above the roof deck. March 2018: I witnessed a small amount of water slowly weeping from the soffit where the dry rot was found in 2016 (under the fascia -- coming from within the roof). It wasn't a great deal of water, but because I knew the area had been of concern in the past, I wanted to have All Star look at it. They came out promptly and took a look at the affected area. They also crawled around in the scuttle attic to see what was evident in that area. After looking for 10-15 minutes, they stated that they thought the attic insulation needed more work done by the fireplace, and that the area may be producing trace amounts of moisture from warmer air escaping into the cold attic in the winter -- in turn causing frost that turns into the small amount of water during melting. They also said it could be as a result of heaving of ice from melt and thaw on the roof itself. The conclusion of that visit was that they would come back and look at the roof once the snow melted (within a week or two), and pull together numbers for what they proposed for insulation work in the event that was the culprit. April 2018: I receive an email quote from All Star with projected costs for tearing off the roof by the chimney, adding in new insulation and rebuilding the roof in the affected area. $4,500 worth of work for a roof that wasn't even 5 years old -- and with a track record of documented historical issues. I point out to All Star my frustration that they're asking for a substantial amount of money without actually confirming the root cause of the problem -- or even visually inspecting the roof free of snow. At this time, I also questioned why the material under the new roof wasn't properly addressed (the historic drywall staining, or the couple rotten 2x4s). This was a clear indication that the area was problematic when the roof was replaced in 2013. AND, if they had the roof off in 2013 when they repaired it and saw this damage, why would they not have addressed this insulation concern then as well?... Even if the consumer decided they didn't want to pay more for the fix, I would think it was a necessary enhancement to avoid a potentially chronic problem. Their response was neither helpful or solution-oriented. They cited that the roof is out of the statutory 2 year warranty mandated by the state, and that the contract was executed with the former owner -- not me. Essentially, they claimed that they owed me nothing as someone who was not party to the original contract (the contract they just argued was already satisfied, since 2 years had elapsed). I stated that this wasn't a satisfactory conclusion, and that I wasn't asking for free work to be done -- just that we (All Star, and the consumer) work together to find an affordable solution where both parties can rest knowing the issue had been addressed properly. After receiving another email shirking responsibility of any kind but stating that they'd be happy to do the proposed work, I stated that I would simply leave my comments with the BBB and other word of mouth. I then received another email from the All Star offices (Jamie) stating that they would no longer even visit the property to talk about solutions. I placed a call to Jamie (and left a voicemail) in hopes that we could still civilly discuss options that don't involve me halfway re-roofing my home 5 years into the "new roof". I received no return call. My experience with All Star was unfortunately not a good one. Even with supporting evidence (dating back to within the 2 year warranty period), and backed by common sense (you don't build on bad materials when you know of an issue -- especially when you have the opportunity to resolve it with a couple pieces of timber and some spray foam), All Star elected to frustrate a consumer instead of helping them find a respectful solution."

Joshua A on April 2018


Jerry Bothun Construction
10430 First Timberlane Dr
No reviews
Jerry Bothun Construction
10430 First Timberlane Dr
No reviews

Luger Construction
6146 145th Street N
No reviews
Luger Construction
6146 145th Street N
No reviews
12 years of experience

Luger Construction specializes in interior and exterior home design. We provide quality craftsmanship, excellent customer service, at an affordable price. The goal is to take your vision and make it a reality. In addition, our goal is to make the payment process as easy and transparent as possible. Following the agreed upon bid for any given job, an agreement form is issued to the customer in order to ensure everyone is clear on the agreement as the project progresses. Lastly, customers will be responsible for 30% of the total cost up front.

Luger Construction specializes in interior and exterior home design. We provide quality craftsmanship, excellent customer service, at an affordable price. The goal is to take your vision and make it a reality. In addition, our goal is to make the payment process as easy and transparent as possible. Following the agreed upon bid for any given job, an agreement form is issued to the customer in order to ensure everyone is clear on the agreement as the project progresses. Lastly, customers will be responsible for 30% of the total cost up front.


UB Hardwoods LLC
3431 US-169 N
4.28(
43
)
UB Hardwoods LLC
3431 US-169 N
4.28(
43
)
Customers say: Quality work
24 years of experience

UB Hardwoods is a complete flooring company established in 2001. Based in Golden Valley and Plymouth, Minnesota we work throughout the Minneapolis/St. Paul Metro and surrounding areas, including Minneapolis, Milwaukee, and Chicago using our special dustless equipment that doesn’t pollute your home. We have built an excellent reputation and have many references from customers that have experienced the quality of our work and our dustless system. We work 7 days a week to accommodate your schedule. Additional DBA - UB Hardwoods Installation.

"It has been 1 year 5 months and 9 days since we officially started working with UB Hardwood and have now finished replacing floors in our kitchen, dining room, and entryway. This “one-day” project lasted much-much longer than the one-day which was quoted. This is one of several reasons to write this review. We chose UB Hardwood for two reasons: 1) UB Hardwood was recommended by the company that remodeled our kitchen and did phenomenal, fantastic, amazing job; 2) we were hoping to have an equally satisfying experience with this recommended installer. After we signed the agreement and payed 60% of invoice the “fun” has begun. The installation was scheduled about a month into the future. We were told it would take 1 day to install Adura Flex with grout. We heard nothing from UB the week leading up to the installation. So the day before the scheduled install date, we called them to see if things were still on-track. We were, at that time, the install would start at noon on the day-of. At 12:45 p.m. the day of installation we were still waiting (no communication from UB Hardwood). At 1:15 p.m. the installers finally showed up. They decided to install the new floor without removing the old one. They didn’t remove the trim (which we paid for), but rather cut it and did it very poorly. Then the glue was poured and installation begun. At 7:30 p.m. they were still working – clearly rushing – and still insisted they would be finished. At 8:00 p.m. they said they were done for the day and would be back tomorrow. As a result they didn’t clean the grout, off the floor surface, which on the package said to clean immediately. The next day they finished the installation, but the mess they left was enormous. After washing the floor 5 times to remove the dried grout (on hands and knees, with old mop, with a new mop), we gave up and called UB Hardwood. They ordered a cleaning solution (it took a week for it to arrive), which helped to clean the grout quite a bit, but not completely. Then the glue started to pop-up through the grout. The glue seeping through the tile seams was a continuous issue for the short life of the floor. Instead of installing a tile-matching stair nose, for which we were charged $78, a cheap metal one was installed. It was cut crookedly, with rough edges, attached with both re-used old and new screws. This was fixed eventually. And we thought we were done. But in about 6 months the grout started to crack. This was attributed to the defective floor and our bad luck. A claim was entered. Mannington satisfied the claim and we started everything allover again. We selected a different product because we couldn’t deal with the grout and glue again. Initially, even the 2nd floor was supposed to be a one-day installation. In early May, we scheduled our installation and at that time, they finally admitted it would be two days - July 6 and 7. On June 30th, 13 out of 16 boxes of flooring were delivered to our house. The other 3 boxes and stair nose didn’t make it. On July 6 around 1:00 p.m. we were still waiting for UB Hardwood and there was no communication. So we called. We were told that our installation was rescheduled to July 7-8 and they forgot to tell us. Nobody even asked us if were able to accommodate these changes. The second round of installation begun. We were getting different messages about the floor removal – if defective Adura was going to be removed or both old floors, or both old floors and plywood. How this was not articulated and clearly decided upon in advance, is unknown. , Ultimately both the defective Adura, previous old floor, and plywood were removed. Day 1 ended with our kitchen, dining room, and entry way in ruins with the removal of both floors and staples all over subfloor. Day 2 this was taken care of and installation of the new floor began. Again, due to poor communication and mixed messages from UB Hardwood, we expected a new plywood to go under the new floor. Sorting this out took several hours, meanwhile the installers just left and we were left with unusable kitchen/dining room for the entire weekend. On Monday the installers showed up again, with the missing stair nose and last 3 boxes of tiles. The stair nose was wooden, not vinyl as agreed upon and we got on the phone again. The floor was finished (without a new layer of plywood). Two weeks later, the proper stair-nose arrived and was installed. We were left with the aftermath of damaged trim, poorly installed shoes around our kitchen cabinets, and damage to the $30,000 cabinets from previous kitchen renovation . We chose to repair the woodwork ourselves as we couldn’t stand the idea of working with UB Hardwood any longer."

Justin D on September 2022

UB Hardwoods is a complete flooring company established in 2001. Based in Golden Valley and Plymouth, Minnesota we work throughout the Minneapolis/St. Paul Metro and surrounding areas, including Minneapolis, Milwaukee, and Chicago using our special dustless equipment that doesn’t pollute your home. We have built an excellent reputation and have many references from customers that have experienced the quality of our work and our dustless system. We work 7 days a week to accommodate your schedule. Additional DBA - UB Hardwoods Installation.

"It has been 1 year 5 months and 9 days since we officially started working with UB Hardwood and have now finished replacing floors in our kitchen, dining room, and entryway. This “one-day” project lasted much-much longer than the one-day which was quoted. This is one of several reasons to write this review. We chose UB Hardwood for two reasons: 1) UB Hardwood was recommended by the company that remodeled our kitchen and did phenomenal, fantastic, amazing job; 2) we were hoping to have an equally satisfying experience with this recommended installer. After we signed the agreement and payed 60% of invoice the “fun” has begun. The installation was scheduled about a month into the future. We were told it would take 1 day to install Adura Flex with grout. We heard nothing from UB the week leading up to the installation. So the day before the scheduled install date, we called them to see if things were still on-track. We were, at that time, the install would start at noon on the day-of. At 12:45 p.m. the day of installation we were still waiting (no communication from UB Hardwood). At 1:15 p.m. the installers finally showed up. They decided to install the new floor without removing the old one. They didn’t remove the trim (which we paid for), but rather cut it and did it very poorly. Then the glue was poured and installation begun. At 7:30 p.m. they were still working – clearly rushing – and still insisted they would be finished. At 8:00 p.m. they said they were done for the day and would be back tomorrow. As a result they didn’t clean the grout, off the floor surface, which on the package said to clean immediately. The next day they finished the installation, but the mess they left was enormous. After washing the floor 5 times to remove the dried grout (on hands and knees, with old mop, with a new mop), we gave up and called UB Hardwood. They ordered a cleaning solution (it took a week for it to arrive), which helped to clean the grout quite a bit, but not completely. Then the glue started to pop-up through the grout. The glue seeping through the tile seams was a continuous issue for the short life of the floor. Instead of installing a tile-matching stair nose, for which we were charged $78, a cheap metal one was installed. It was cut crookedly, with rough edges, attached with both re-used old and new screws. This was fixed eventually. And we thought we were done. But in about 6 months the grout started to crack. This was attributed to the defective floor and our bad luck. A claim was entered. Mannington satisfied the claim and we started everything allover again. We selected a different product because we couldn’t deal with the grout and glue again. Initially, even the 2nd floor was supposed to be a one-day installation. In early May, we scheduled our installation and at that time, they finally admitted it would be two days - July 6 and 7. On June 30th, 13 out of 16 boxes of flooring were delivered to our house. The other 3 boxes and stair nose didn’t make it. On July 6 around 1:00 p.m. we were still waiting for UB Hardwood and there was no communication. So we called. We were told that our installation was rescheduled to July 7-8 and they forgot to tell us. Nobody even asked us if were able to accommodate these changes. The second round of installation begun. We were getting different messages about the floor removal – if defective Adura was going to be removed or both old floors, or both old floors and plywood. How this was not articulated and clearly decided upon in advance, is unknown. , Ultimately both the defective Adura, previous old floor, and plywood were removed. Day 1 ended with our kitchen, dining room, and entry way in ruins with the removal of both floors and staples all over subfloor. Day 2 this was taken care of and installation of the new floor began. Again, due to poor communication and mixed messages from UB Hardwood, we expected a new plywood to go under the new floor. Sorting this out took several hours, meanwhile the installers just left and we were left with unusable kitchen/dining room for the entire weekend. On Monday the installers showed up again, with the missing stair nose and last 3 boxes of tiles. The stair nose was wooden, not vinyl as agreed upon and we got on the phone again. The floor was finished (without a new layer of plywood). Two weeks later, the proper stair-nose arrived and was installed. We were left with the aftermath of damaged trim, poorly installed shoes around our kitchen cabinets, and damage to the $30,000 cabinets from previous kitchen renovation . We chose to repair the woodwork ourselves as we couldn’t stand the idea of working with UB Hardwood any longer."

Justin D on September 2022


Pietch Builders Inc
10633 165th St. W
No reviews
Pietch Builders Inc
10633 165th St. W
No reviews

Additional DBA - Pietsch Construction Co. Financing available.

Additional DBA - Pietsch Construction Co. Financing available.


CLOSURE CONSTRUCTION INC
15387 AQUILA AVE S
4.50(
6
)
CLOSURE CONSTRUCTION INC
15387 AQUILA AVE S
4.50(
6
)
Customers say: Terrific value
24 years of experience

CLOSURE CONSTRUCTION, INC. IS A GENERAL CONTRACTING FIRM THAT TAYLORS TO CUSTOMER SERVICE AND COMPETITIVE PRICING. CALL US FOR A FREE ESTIMATE TODAY! LICENSE #20308779.

CLOSURE CONSTRUCTION, INC. IS A GENERAL CONTRACTING FIRM THAT TAYLORS TO CUSTOMER SERVICE AND COMPETITIVE PRICING. CALL US FOR A FREE ESTIMATE TODAY! LICENSE #20308779.


M-1 maintenance
8039 Harkness Rd S
No reviews
M-1 maintenance
8039 Harkness Rd S
No reviews
13 years of experience

A small company that provides handyman service for home and business you can pay with cash or check

A small company that provides handyman service for home and business you can pay with cash or check

...
Showing 1-10 of 518

Deck or porch build or replaces FAQs

A well-designed wraparound porch can significantly enhance your property's market appeal by improving curb appeal and expanding usable living space. The value increase varies based on your neighborhood, regional preferences, and how well the porch complements your home's architectural style. While you may not recoup the entire construction cost when selling, the enhanced marketability and distinctive character often make your property more attractive to potential buyers than similar homes without this feature.

While not mandatory, adding a roof to your wraparound porch provides substantial benefits, including protection from precipitation, shade during hot weather, and preservation of flooring materials. A covered porch creates a more versatile outdoor living space in various weather conditions. Though roofed structures initially cost more, they deliver greater functionality and potentially higher property value enhancement than uncovered alternatives.

Construction timelines for wraparound porches span several weeks to a few months, depending on project scope. The process begins with design and permitting phases, followed by foundation work, framing, flooring installation, and finishing details. Weather conditions, material availability, contractor scheduling, and design complexity influence the timeline. Larger porches with custom features naturally require more time than simpler, smaller projects.

Building permits are required for wraparound porch construction in most jurisdictions. These permits ensure your structure meets local building codes for structural integrity, proper attachment methods, appropriate railing heights, and other safety standards. Constructing without required permits risks potential fines, complications during future home sales, and possible removal orders. Requirements vary by location, so consulting your local building department before starting construction is essential.

The ideal flooring material depends on your specific priorities regarding appearance, maintenance requirements, durability, and budget. Traditional wood provides classic beauty but requires regular maintenance. Composite materials offer lower maintenance needs but at a higher initial cost. Concrete provides exceptional durability and minimal upkeep, but with a less traditional appearance. Your local climate conditions, expected foot traffic, and aesthetic preferences should guide your selection process rather than assuming one universal "best" option exists.

The homeowners guide to deck or porch build or replaces
From average costs to expert advice, get all the answers you need to get your job done.
Person measuring to repair a deck
Apr 30, 2025
Apr 30, 2025
Budget for deck replacement costs based on factors such as deck size, materials, extent and type of damage, demolition, labor, and more.
new deck on upper level of house overlooking trees
Apr 25, 2025
Apr 25, 2025
Planning to add a deck to your home? Explore how materials, project size, and labor impact the overall price, and get tips to maximize your investment.
A white composite fencing
Apr 14, 2025
Apr 14, 2025
Composite fencing costs range depending on the fence height and length, materials, and location. Difficult terrain can increase fencing costs as well as additional features like gates.
new deck built of trex decking material
Apr 14, 2025
Apr 14, 2025
Trex decking can create the beautiful yard you’ve been dreaming of. This guide breaks down all the costs and the most important factors, including labor, type, and permits.
deck built of vinyl material on back of house
Apr 14, 2025
Apr 14, 2025
Budget for composite decking costs based on factors such as deck size, materials, labor, site prep, demolition, additional features, and more.
sealing a wooden deck with a paintbrush
Apr 9, 2025
Apr 9, 2025
Learn how much it costs to seal a deck, exploring factors like its size, materials, sealant type, prep work required, and local labor rates.
Share project details to get started.