Top-rated major renovation multiple room pros.

Get matched with top major renovation multiple room pros in Willow Spring, NC

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Major renovation multiple room pros in Willow Spring

Avatar for Triangle Classic Homes Inc
Triangle Classic Homes Inc
5.0(
81
)

Serving Willow Spring, NC and surrounding areas

Approved

In business since 1998

Free estimates

Emergency services offered

"It went great and we enjoyed working with Carl and Ralph. The project went smoothly and we are very happy with the results. Our house looks great and we have a more functional house. We've also received several unsolicited comments from those in our neighborhood that our house looks great. We have more plans down the road for renovations and we are looking forward to calling on Triangle Classic Homes again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+12

6 neighbors recently requested a quote
Recommended by97%of homeowners
Luxury Renovations INC.
5.0(
6
)

Serving Willow Spring, NC and surrounding areas

Approved

In business since 2021

Free estimates

Emergency services offered

"What a great experience! Edwin was pleasant to work with and was skilled in so many different areas. He was able to take on and accomplish all of my renovation needs from flooring to plumbing, painting and the list goes on, he also gave me ideas that ended up Saving me lots of money. I would highly recommend."
New sub floor
Bathrooms
Nursery
Kitchens
 Siding repair

+90

Response time8 hrs
2 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Leon Home Repairs
Leon Home Repairs
4.4(
635
)

Serving Willow Spring, NC and surrounding areas

Approved

Super Service Award Winner

In business since 2001

Free estimates

Emergency services offered

"These guys are top notch! So many positive things to say. We have hired Leon for multiple renovation projects in our 1960's midcentury modern home. We hired him after having a negative experience with another contractor who we had to fire in the middle of a remodeling project. We have said many times we wish we found Leon sooner. Chris Leon the owner is very responsive and gives reasonable prices for top quality work. These guys do it all- painting, flooring, electrical, plumbing, drywall and details, details, details. Chris is very trustworthy and even suggested ways for us to save money, instead of just encouraging us to spend as much as possible like many other contractors do. Even after being paid for all the work he came out to our house to make slight modifications at our request. His contractors are all very polite and hard-working. We felt very comfortable having the team around in our house with our family. People who see our house want to know where we had such great work done!"
Bathroom remodel
Bathroom remodel
Bathroom remodel
Bathroom remodel
Response time2 days
5 neighbors recently requested a quote
Recommended by88%of homeowners
Avatar for Woodwright and Millwork, LLC
Woodwright and Millwork, LLC
4.9(
27
)

Serving Willow Spring, NC and surrounding areas

Approved

In business since 2019

Free estimates

Warranties offered

"It is so much more beautiful than we imagined this project could be. Andrew is a perfectionist and his work is gorgeous because of it. Thanks Andrew we really appreciate your hard work!!"
Finished Carpentry and Woodworking Project
Remodeling - Kitchen & Bathroom Project
Finished Carpentry and Woodworking Project
Remodeling - Kitchen & Bathroom Project
Finished Carpentry and Woodworking Project

+20

Response time7 hrs
4 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Cransten
Cransten
4.4(
172
)

Serving Willow Spring, NC and surrounding areas

Approved

Super Service Award Winner

In business since 2016

Free estimates

Emergency services offered

"We hired Steve at Cransten to assemble and install new cabinets for our kitchen and the results were amazing! His attention to detail, quality workmanship and professionalism greatly exceeded our expectations. We were so happy with Steve’s work that we immediately booked him to install additional cabinets in our dining room."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+18

Response time1 day
Response rate98%
3 neighbors recently requested a quote
GRC Corporation
New to Angi

Serving Willow Spring, NC and surrounding areas

Approved

In business since 2021

Free estimates

Emergency services offered

We invite you to experience a tradition of customer satisfaction that will exceed your greatest expectations. Our professionalism and quality workmanship will accurately reflect your taste and lifestyle. From conception to completion, we work with you until the job is done. We are ethical, honest, and easy to communicate with. \nCall us today you'll be pleased you did. Thank you

9 neighbors recently requested a quote
Avatar for King of Clean-KOC
King of Clean-KOC
4.8(
257
)

Serving Willow Spring, NC and surrounding areas

"Hector and team did a great job cleaning the stains off my roof. In the process, he alerted my just prior to starting cleaning that my gutters were clogged. I had them cleaned shortly prior, but he texted me multiple pictures from the roof that clearly showed the need to clean them again (love the use of technology real time!). We quickly agreed a gutter cleaning cost and he proceeded to do both in a very professional manner. Also cleaned up thoroughly afterwards. Would use again - he takes pride in his work."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+24

Recommended by96%of homeowners
Avatar for Granite Transformations of Raleigh-Durham
Granite Transformations of Raleigh-Durham
4.6(
106
)

Serving Willow Spring, NC and surrounding areas

In business since 2005

Free estimates

Credit card accepted

"We unfortunately experienced a number of problems and communications issues throughout the process with Granite Transformations, and as a result the job experienced several delays.  It seemed like a situation where if something could go wrong, it did in more cases than not.   However in the end, it means a lot that the owners of GT recognized the issues, stood behind their business, and worked hard to earn our satisfaction. GT requests payments at time of signing the contract, and then at points during the process (e.g. cabinets installed, templates drawn, etc).  All who we spoke with at GT on the phone and those who performed work in our home were professional. The end result is a quality product, but the journey to get there was not expected.
Here is a chronology of events:
- Fri August 16th: a GT salesman came to our home with vanity cabinet and surface samples, outlined how the process worked, and we signed a contract to replace Master Bath Vanity Cabinet and Double-sink Top, and reface Half Bath Vanity Cabinet front as well as replace its Single-sink Top. Three new faucets were also included. GT to handle all plumbing hookups.  GT gave us access to an electrical contractor. The saleman explained that work would not begin until all materials were ready to go. At that point GT would install the new Master Bath cabinet, reface the Half Bath cabinet front, and do a template for both tops.  2-3 days after that, the tops and sinks would be installed, then the faucets hooked up.
- Fri October 4th: GT had called end of Sept to let us know all materials were in.  Upon the installers arriving at our house, GT let us know there was a mixup and the Master Bath cabinet had not yet come in.  So GT refaced the Half Bath cabinet.  However upon completion it was resurfaced in a White color rather than the Cherry color we had selected.
- Mon October 21st: GT removed the existing Master Bath cabinet, capped the plumbing, and installed the new cabinet. The Half-bath cabinet was refaced with the correct Cherry color.  Templates were drawn up to make the tops.
- Fri October 25th: GT was to install the Vanity Tops in both baths, however called the evening of Thurs Oct 24th to inform us that workers had dropped and broke the Master Bath top so it would need to be remade.  The composite used for the top was out of stock locally, so would have to be ordered.  With the Master Bath vanity out of commission since the plumbing was capped, we decided to leave the half-bath as is and have GT install the top in the half-bath when the Master Bath top was ready.
- Mon October 28th: The Electrical contractor completed the electrical work scheduled for the Master Bath.  His work was excellent, and price was very reasonable.
- Fri November 8th:  GT installed the Master Bath Vanity Top, Sinks, and Faucets.  This was about Three Weeks after GT had installed the new cabinet there and capped the plumbing.  GT installed the Half Bath Vanity Top, Sink, and Faucet. GT requested full remaining payment at this point, however since both of us were not available to inspect the work, we asked to pay the next day at their store which GT said was acceptable.
- Sat November 9th:  Upon waking up, we were greeted with water on the Master Bath floor, leaking from one of the sinks. Also, upon comparing both Master and Half Bath vanity tops to the samples we had in our possession, we discovered neither top matched its respective sample.  We had travel plans for the weekend, however due to the leak one of us stayed home. we called the plumber (Mr Water Heater, who we found out is owned by the local GT company) and learned they only work Mon-Fri 8-5ish and do not have emergency service.  Upon calling the GT store after it opened, I was told I may need to wait until Monday to have the plumbing issue looked at.  Given the various issues experienced, and the new leak, I asked to have the GT owner call me to discuss the issues.  Jonathan Lamb, GT co-owner called me, and as a result agreed to have a plumber resolve the leak over the weekend (which was done), and then work with us the following week on the other issues.
- Fri November 15th:  Mel Lamb, GT co-owner, came out to our house to inspect the sink top matches to the samples, and the overall experience we had.  He agreed they did not match what we were shown when we signed the contract. We decided to leave the Master Bath alone at this point since the colors worked fine, but Mel offered to replace the Vanity top in the Half Bath at no cost to us, and we accepted as the combination in there did not look right.  We also discussed the other issues.  Mel was not aware of the leak in the Master Bath the previous Saturday, but reassured us that he was aware things on this project did not go right, and that he was there to make things right. Mel made a trip back to the store to get new samples, and we selected from those for the new half bath top. He also offered a final discount on our remaining payment.
- Mon November 25th: Half bath top and sink were reinstalled, and faucet hooked up.  Final payment made in full.
So in summary, the jobs were completed about 15 weeks after the contract was signed, and about 7 weeks after work was started. During the course of our work, we dealt with about a dozen different people including office staff, installers, plumbers, salesman, co-owners, etc. and generally had to bridge communications among them... in our view it would have helped had a single project focal point been assigned.  We were surprised that after signing the contract with our salesman, that we never heard from him again during the project or as part of completing the project.  We also experienced that on several occasions work was not completed correctly on the first attempt which led to reschedules, delays, canceled plans, adhock needs, etc which was inefficient to both GT and the customer.  The local GT seems to be growing, and perhaps these are growing pains as a result of expanding their business.  Hopefully our experience will help bring some changes to the GT process and communications that will help other customers, and help us, should we do business again with GT further down the road.
"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+7

Recommended by93%of homeowners
...
Showing 1-10 of 258
FAQs for major renovation multiple room service projects in Willow Spring, NC

Gutting a house involves completely removing outdated elements, including drywall, insulation, and fixtures, to reveal the underlying structure. This process is not only ideal for a complete remodel but is also critical in emergency situations such as flood damage where compromised materials must be replaced immediately. Contractors follow OSHA-approved safety measures throughout the demolition to ensure a secure work environment. This method provides a fresh, safe canvas for any future renovation.

Gutting a house is a cost-efficient choice. Home renovations cost between $20,000 and $88,000 compared to the cost to build a new house of $122,500 to $411,500. The reduced cost stems from retaining the existing structural framework while updating the interior. Factors such as house size, material quality, and labor directly influence the total expenses, making a gut renovation a financially smart decision.

The cost of demoing an interior is worthwhile because gutting a house creates a completely safe and refreshed environment by removing toxic or damaged materials like asbestos, mold, and deteriorated components. Professional supervision ensures all hazards are properly managed and health and safety standards are met. This process revitalizes the home's interior and can increase its structural integrity and overall value.

Remodeling a bathroom costs between $6,640 and $17,600, with high-end remodels exceeding $30,000. The final price is directly influenced by the quality of fixtures and design features—modern tiling, advanced plumbing, and custom details all add to the definitive expense. By selecting superior materials and design elements, homeowners ensure both functionality and a remarkable aesthetic upgrade.

Kitchen renovations range from $14,500 to $41,500 when the original layout is maintained. However, changing the layout by removing load-bearing walls or upgrading to premium appliances directly escalates costs, often adding over $1,000 per modification. These precise enhancements reflect the high-quality standards and result in a transformative and efficient upgrade.

A full gut renovation typically spans between four months and a year and a half. This period accounts for the permitting process, material procurement, and the overall scale of the project. Every phase—from demolition through rebuilding—involves careful planning and execution to meet deadlines while ensuring the work adheres to safety and quality standards.

The Willow Spring, NC homeowners’ guide to major renovation multiple room services

From average costs to expert advice, get all the answers you need to get your job done.