Compare Quotes from up to 3 Pros

Addition & Remodeling Contractors in Cherry Hill, NJ

Where do you need Addition & Remodeling Contractors?


Deals Tag = Deals
Compare quotes with a single request

Let our ProFinder technology instantly match you to the perfect pros for your project.

(866) 909-1475
74 Oakhurst Lane Mount Laurel, NJ 08054
Serving Cherry Hill
Shi Full Services specializes in all types of residential home improvements. We are dedicated to ...
See More
(267) 573-6680
219 W. Broad Street Palmyra, NJ 08065
Serving Cherry Hill
Welcome to Victory Contracting Services, LLC! We are excited to exceed your expectations. As ...
See More
(267) 573-5589
124 Pfeiffer St Camden, NJ 08105
Serving Cherry Hill
We pride our company on reliability, great communication, integrity, and quality work. We are ...
See More
Find the Right Pro. Right Away.

Let our ProFinder technology instantly match you to the perfect pros for your project.

Showing 1-25 of 62
< Prev | 1 | 2 | 3 | Next >

Recent Job Requests for Additions & Remodeling Contractors in Cherry Hill, NJ


New Lead
Project: Remodel a Bathroom
Location: Cherry Hill, NJ
Date: 08/19/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No

New Lead
Project: Remodel a Basement
Location: Cherry Hill, NJ
Date: 08/18/2019
Basement Features: Bathroom(s), Storage
Design Preparation: Sketches or basic idea of project
Basement Area Description: Partially Finished
Square Footage: 400 - 800 (medium)
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Property Owner: Yes
Historical Work: No
Covered by Insurance: No
Comment: I would like to get an estimate for finishing a basement. It is framed and lights are up. I also have a master bath to complete, and a small area on the second floor (loft area).

New Lead
Project: Remodel or Renovate One or More Rooms
Location: Cherry Hill, NJ
Date: 08/18/2019
Nature of project: Remodel / update a few rooms
Rooms to be Remodeled: Bathroom(s), Basement, Other
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence

New Lead
Project: Remodel a Bathroom
Location: Cherry Hill, NJ
Date: 08/18/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Comment: I need someone to commit to remodeling my bathroom, finishing the basement, and finishing an attic room. I have had contractor nightmares!

New Lead
Project: Renovate or Repair a Home
Location: Cherry Hill, NJ
Date: 08/17/2019
Project Description: Major renovation
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence

New Lead
Project: Remodel a Basement
Location: Cherry Hill, NJ
Date: 08/17/2019
Basement Features: Exercise Area
Design Preparation: Sketches of basic idea of project
Basement Area Description: Unfinished
Square Footage: More than 800 (large)
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Property Owner: Yes
Historical Work: No
Covered by Insurance: No

New Lead
Project: Remodel a Bathroom
Location: Cherry Hill, NJ
Date: 08/17/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months

New Lead
Project: Renovate or Repair a Home
Location: Cherry Hill, NJ
Date: 08/16/2019
Project Description: Other
Project Type: Interior
Work included: Other
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: - selling property & buyer is asking for 3 part epoxy applied to two vertical wall cracks in basement; need a fire resistant caulk in another smaller crack - basement is as dry as bone, never any water, townhome 10 years old

New Lead
Project: Remodel a Bathroom
Location: Cherry Hill, NJ
Date: 08/16/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No

New Lead
Project: Build an Addition
Location: Cherry Hill, NJ
Date: 08/16/2019
Project Description: Design and build
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Comment: We would like to get an estimate on bumping out a ground floor room to expand to a master suite (it currently is a room next to a half bath).