Compare Quotes from up to 3 Pros

Addition & Remodeling Contractors in Colorado Springs, CO

Where do you need Addition & Remodeling Contractors?


Deals Tag = Deals
Compare quotes with a single request

Let our ProFinder technology instantly match you to the perfect pros for your project.

(720) 506-7126
7710 Wranglers Way Black Forest, CO 80908
Serving Colorado Springs
Creative Home Improvement's takes great pride in it's 20+ years in the Home Remodeling industry. ...
See More
(719) 445-2920
20 Mount View Lane, Suite F Colorado Springs, CO 80907
With over 25 years of experience serving the Colorado Springs and surrounding area, High West ...
See More
References Available
(719) 445-2762
304 S 8th St., Unit 104 Colorado Springs, CO 80905
Welcome to Designer Kitchens, Inc. We take pride in the quality of work and customer satisfaction ...
See More
Find the Right Pro. Right Away.

Let our ProFinder technology instantly match you to the perfect pros for your project.

Showing 1-25 of 83
< Prev | 1 | 2 | 3 | 4 | Next >

Recent Job Requests for Additions & Remodeling Contractors in Colorado Springs, CO


New Lead
Project: Remodel a Bathroom
Location: Colorado Springs, CO
Date: 10/21/2018
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible

New Lead
Project: Remodel a Kitchen
Location: COLORADO SPRINGS, CO
Date: 10/20/2018
Floorplan: I am considering changes to kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: No - I do not plan to move or update the appliances
Countertops: Yes - I plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: Yes - I plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes
Comment: kitchen remodel 0

New Lead
Project: Renovate or Repair a Home
Location: Colorado Springs, CO
Date: 10/20/2018
Project Description: Several repair projects of varying nature
Project Type: Both
Work included: Doors and windows, Electrical, Plumbing, Siding, Landscaping, Heating and cooling
Comment: I need multiple projects looked at and given accurate quotes. For example, hardware repaired/replaced on windows and doors. Fireplace cleaned and serviced. Chimney cricket repaired. bathroom sinks drainage repaired. Exterior siding and trim repaired to prevent water intrusion. gutter repaired and extended away from the house. GFCI/AFCI receptacles replaced. water heater pressure valve replaced. main water shut off valve replaced with proper connection from pvc to cast iron pipe replaced. carbon monoxide detectors installed. brick façade re pointing done.

New Lead
Project: Remodel a Basement
Location: Colorado Springs, CO
Date: 10/20/2018
Basement Features: Bathroom(s), Game Room
Design Preparation: Sketches of basic idea of project
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Comment: We have an unfinished basement, we would like a bathroom put in, the plumbing is already there. We also would like a large room finished, we plan to have an inhome daycare in the big room.

New Lead
Project: Remodel a Bathroom
Location: Colorado Springs, CO
Date: 10/20/2018
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible

New Lead
Project: Remodel a Kitchen
Location: Colorado springs , CO
Date: 10/20/2018
Floorplan: I am considering changes to kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: Yes - I plan to move or update some or all appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: Yes - I plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
What kind of location is this?: Home/Residence

New Lead
Project: Remodel a Bathroom
Location: Colorado springs , CO
Date: 10/20/2018
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months

New Lead
Project: Remodel a Kitchen
Location: Colorado Springs, CO
Date: 10/20/2018
Floorplan: I plan to maintain existing kitchen floorplan
Cabinets: No - I do not plan to move or update the cabinets
Appliances: Yes - I plan to move or update some or all appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Lighting: No - I do not plan to update the lighting
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Comment: Looking for someone to take down a bar height counter to align it with the already existing counter that is counter height. Also, electrical outlets would need to be relocated.

New Lead
Project: Build an Addition
Location: Colorado Springs, CO
Date: 10/20/2018
Project Description: Design and build
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
Comment: Adding a bathroom and extending the dining area

New Lead
Project: Remodel a Bathroom
Location: Colorado Springs, CO
Date: 10/19/2018
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: We are looking to update our master bathroom. New shower, toilet, countertops, floor. May be interested in cabinet refacing.