Compare Quotes from up to 3 Pros

Addition & Remodeling Contractors in Cuyahoga Falls, OH

Where do you need Addition & Remodeling Contractors?


Deals Tag = Deals
Compare quotes with a single request

Let our ProFinder technology instantly match you to the perfect pros for your project.

(440) 799-6370
P.O. Box 201823 Shaker Heights, OH 44120
Serving Cuyahoga Falls
Welcome to Scape-Master, formally Masterscapes of Cleveland. Same great service as always. We are a ...
See More
(216) 430-0447
1188 Meadow Spur Akron, OH 44333
Serving Cuyahoga Falls
J.P. Grabenstetter Construction has been in business since 1997. However, John, the owner, has more ...
See More
(330) 615-8340
1690 East Waterloo Road Akron, OH 44306
Serving Cuyahoga Falls
American Patio Rooms will build a beautiful extension to your living environment, giving you the ...
See More
Find the Right Pro. Right Away.

Let our ProFinder technology instantly match you to the perfect pros for your project.

Showing 1-25 of 41
< Prev | 1 | 2 | Next >

Recent Job Requests for Additions & Remodeling Contractors in Cuyahoga Falls, OH


New Lead
Project: Add a Sunroom or Patio Enclosure
Location: Cuyahoga Falls, OH
Date: 05/22/2019
Project Description: Enclose existing patio or porch with roof, walls or windows
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Property Owner: Yes

New Lead
Project: Remodel a Bathroom
Location: Cuyahoga Falls, OH
Date: 05/22/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible

New Lead
Project: Build an Addition
Location: Cuyahoga Falls, OH
Date: 05/22/2019
Project Description: Design and build
Type of Addition: Ground level addition
Rooms Included:: Bathroom, Bedroom(s), Garage/Workshop, Deck/Porch
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Request for Commercial Location: No
Comment: I do have existing plans for an addition but I am not sure on the cost of that, so they will most likely need revised. I have a basement wall in the back of the house that needs replaced. I am also looking to add a 2 car attached garage, bedroom, bathroom, patio/pool deck and 1st floor flooring and siding.

New Lead
Project: Remodel a Bathroom
Location: Cuyahoga falls, OH
Date: 05/22/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Comment: a bathroom and installing separate shower and soaking tub

New Lead
Project: Remodel a Kitchen
Location: Cuyahoga Falls, OH
Date: 05/22/2019
Floorplan: I plan to maintain existing kitchen floorplan
Cabinets: No - I do not plan to move or update the cabinets
Appliances: No - I do not plan to move or update the appliances
Countertops: Yes - I plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: No - I do not plan to update the lighting
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes
Comment: I would like to get an estimate for like to remove the island between my kitchen and dining room.

New Lead
Project: Remodel a Bathroom
Location: cuyahoga falls, OH
Date: 05/20/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Comment: need installation of vanity/sink, splash border, new surround and tub, flooring, and maybe possible wall repair

New Lead
Project: Remodel or Renovate One or More Rooms
Location: Cuyahoga Falls, OH
Date: 05/20/2019
Nature of project: Other
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Comment: reframe entry door, install brick molding, modify threshold, install storm door

New Lead
Project: Remodel a Bathroom
Location: Cuyahoga Falls, OH
Date: 05/20/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Comment: Knocking wall out and enlarging bathroom

New Lead
Project: Remodel or Renovate One or More Rooms
Location: CUYAHOGA FALLS, OH
Date: 05/17/2019
Nature of project: Reconfigure the current floor plan
Design Preparation: None
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
What kind of location is this?: Home/Residence

New Lead
Project: Remodel a Bathroom
Location: cuyahoga falls oh, OH
Date: 05/17/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months