Compare Quotes from up to 3 Pros

Addition & Remodeling Contractors in Elk Grove Village, IL

Where do you need Addition & Remodeling Contractors?


Deals Tag = Deals
Compare quotes with a single request

Let our ProFinder technology instantly match you to the perfect pros for your project.

(636) 492-4258
1373 Ivy Lane Naperwood, IL 60563
Serving Elk Grove Village
At Elite Contractors, we pride our company on reliability, great communication, integrity, and ...
See More
References Available
(312) 288-2154
1321 North Larrabee Street Chicago, IL 60610
Serving Elk Grove Village
Welcome to Construction Systems, Inc. We take great pride in our quality and professional work , ...
See More
(866) 908-9659
575 South Arthur Avenue Arlington Heights, IL 60005
Serving Elk Grove Village
Welcome to Envy Home Services, Chicagoland’s trusted designer and installer of All Season Sunrooms, ...
See More
Find the Right Pro. Right Away.

Let our ProFinder technology instantly match you to the perfect pros for your project.

Showing 1-25 of 54
< Prev | 1 | 2 | 3 | Next >

Recent Job Requests for Additions & Remodeling Contractors in Elk Grove Village, IL


New Lead
Project: Remodel a Kitchen
Location: ELK GROVE VLG, IL
Date: 05/20/2019
Floorplan: I am considering changes to kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: No - I do not plan to move or update the appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: Yes - I plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes
Comment: new kitchen entirely

New Lead
Project: Remodel a Bathroom
Location: Elk Grove Village, IL
Date: 05/20/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: We have a second floor bathroom that needs gutting and redecorating. We purchased a Toto toilet in February and will be keeping that. Everything else will undoubtedly be replaced. We had this bathroom completely redone in 2008 and Taurus Construction in Lombard did a lousy job. Tiles are cracked, mismatched, grout is cracked and letting ants in, and we wish to make the second floor a shower only rather than a bathtub with shower on the wall. Bathtub to be taken out. Tiles are picked, ready to order shower door and bathroom itself to be gutted again but no change in floor plan expected.

New Lead
Project: Remodel a Bathroom
Location: Elk Grove Village, IL
Date: 05/19/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Comment: We have a small, outdated bathroom that we would like completely redone. We currently have a bathtub and are thinking of changing that to a shower stall. Looking for new walls, floors, toilet, vanity, etc.

New Lead
Project: Remodel a Kitchen
Location: Elk Grove Village, IL
Date: 05/19/2019
Floorplan: I plan to maintain existing kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: No - I do not plan to move or update the appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: No - I do not plan to update the lighting
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Comment: I want new countertops, reface cabinets, new flooring , backsplash and paint

New Lead
Project: Remodel a Bathroom
Location: Elk Grove Village, IL
Date: 05/19/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No

New Lead
Project: Remodel a Bathroom
Location: Elk Grove Village, IL
Date: 05/17/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Comment: I would like to remodel my bathroom and kitchen but keep the Existent floor plan.

New Lead
Project: Add a Sunroom or Patio Enclosure
Location: Elk Grove Village, IL
Date: 05/17/2019
Project Description: Build a new sunroom or enclosed patio or porch
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Property Owner: Yes
Comment: I would like to get an estimate for Add a sunroom to ranch house

New Lead
Project: Remodel a Bathroom
Location: Elk Grove Village, IL
Date: 05/17/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: We are in need of a complete bathroom remodel on a small bathroom that may be a total square footage, on the floor of possibly 100 square feet. Unsure the real measurement of square footage. We want the bathtub replaced with a walk in shower. We want floor to ceiling (slanted) tile for shower, we just bought a new Toto toilet stool, although the company who installed it did not put in the height I needed, we also want the color scheme changed from browns (yuk) to greys. We had the bathroom redone in 2008 and Taurus Construction did a lousy job and had a high school drop out do the work. We contracted with the owner and never saw him until I caught the worker sweeping sawdust and blocks of wood down the hole in the floor that the sink water drains through. We couldn't sell the house in 08 and we just moved back into it. That upstairs bath is a mess and has cracked tiles, tiles that do not match, cabinets that were damaged, etc. We need that bathroom up and running as quickly a

New Lead
Project: Add a Sunroom or Patio Enclosure
Location: Elk Grove Village, IL
Date: 05/16/2019
Project Description: Build a new sunroom or enclosed patio or porch
Request Stage: Planning & Budgeting
Desired Completion Date: Within 1 week
What kind of location is this?: Home/Residence
Property Owner: Yes
Comment: New sunroom

New Lead
Project: Remodel or Renovate One or More Rooms
Location: Elk Grove Village, IL
Date: 05/16/2019
Nature of project: Reconfigure the current floor plan
Rooms to be Remodeled: Other
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Business