Compare Quotes from up to 3 Pros

Addition & Remodeling Contractors in Huntington Beach, CA

Where do you need Addition & Remodeling Contractors?


Deals Tag = Deals
Compare quotes with a single request

Let our ProFinder technology instantly match you to the perfect pros for your project.

References Available
(951) 215-3805
8262 Peters Ave Midway City, CA 92655
Serving Huntington Beach
With over 10 years of experience in the contracting, we are the experts you need to take care of ...
See More
(949) 930-1156
9471 Irvine Center Drive Irvine, CA 92618
Serving Huntington Beach
Opulent Design Build - Preliminary Architecture to Construction Completion. One point of contact ...
See More
(805) 765-9597
9272 Jeronimo Road, Suite 102 Irvine, CA 92618
Serving Huntington Beach
CMD Construction, Inc., is proud to have served the Southern California region for nearly four ...
See More
Find the Right Pro. Right Away.

Let our ProFinder technology instantly match you to the perfect pros for your project.

Showing 1-25 of 96
< Prev | 1 | 2 | 3 | 4 | Next >

Recent Job Requests for Additions & Remodeling Contractors in Huntington Beach, CA


New Lead
Project: Remodel a Bathroom
Location: Huntington Beach, CA
Date: 05/22/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Comment: Must have mobile home experience. Replacing soaker fiberglass tub with oversized shower. Some demo and drywall of existing stall shower. Flip our countertop vanity and double sinks; over-sink electrical and scoop lights in new shower. Want painting when completed. Creativity and budget a real plus.

New Lead
Project: Remodel a Kitchen
Location: huntington beach, CA
Date: 05/22/2019
Floorplan: I am considering changes to kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: Yes - I plan to move or update some or all appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: Yes - I plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes

New Lead
Project: Remodel a Bathroom
Location: Huntington Beach, CA
Date: 05/22/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
Comment: Gut & install & finish. Walk-in shower tile all etc

New Lead
Project: Renovate or Repair a Home
Location: Huntington Beach, CA
Date: 05/21/2019
Project Description: Major home repair project
Project Type: Exterior
Work included: Framing, Carpentry-finish, Deck, Porch or Patio
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: Need a balcony repair. The job was done a few days ago incorrectly and needs to be repaired.

New Lead
Project: Remodel a Bathroom
Location: Huntington Beach, CA
Date: 05/20/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: Remodel 2 bathrooms possibly extend shower stall.

New Lead
Project: Remodel a Bathroom
Location: Huntington Beach, CA
Date: 05/20/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months

New Lead
Project: Remodel a Kitchen
Location: Huntington Beach, CA
Date: 05/19/2019
Floorplan: I plan to maintain existing kitchen floorplan
Cabinets: No - I do not plan to move or update the cabinets
Appliances: No - I do not plan to move or update the appliances
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Lighting: No - I do not plan to update the lighting
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes

New Lead
Project: Renovate or Repair a Home
Location: Huntington Beach, CA
Date: 05/18/2019
Project Description: Several repair projects of varying nature
Project Type: Interior
Work included: Drywall, Doors and windows, Painting, Carpentry-finish
Comment: a window we had installed a long time ago has leaked throughout the years - there is now some significant damage to the interior wall and some on the exterior - we need to get this inspected and repaired we also have a door frame that has some termite damage that we need replaced we also have a strip of ceiling molding in the kitchen that needs to be ever so slightly trimmed and reattached due to the fact that it was cut just a little longer than necessary it tends to pop out from the corner we also need to get some kitchen cabinter veneers attached several years after the installation

New Lead
Project: Remodel a Bathroom
Location: Huntington Beach, CA
Date: 05/18/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Comment: Want to move master bath to the adjacent side, still in master bedroom. Then, the master bath that has been moved & I want a 1/2 bath installed in that place, all plumbing is in there. There is plumbing in the adjacent side as well. The existing door that has been closed off by pervious owners in the hall that once led to the existing bath that they made into their master bath. Obviously I want that to be returned for access to the new 1/2 bath.The next bathroom job would be closing off the hall door and then two pocket doors added to have a cess to the two bedrooms ie.jack n jill style, after the remodel of this bath, of course. I have pictures as my neighbors with the same model of our house did exactly what I'm after. 3 new ceiling fans and duct work.

New Lead
Project: Remodel a Kitchen
Location: Huntington Beach, CA
Date: 05/18/2019
Floorplan: I am considering changes to kitchen floorplan
Cabinets: No - I do not plan to move or update the cabinets
Appliances: No - I do not plan to move or update the appliances
Countertops: Yes - I plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Lighting: No - I do not plan to update the lighting
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence