Compare Quotes from up to 3 Pros

Addition & Remodeling Contractors in Round Lake, IL

Where do you need Addition & Remodeling Contractors?


Deals Tag = Deals
Compare quotes with a single request

Let our ProFinder technology instantly match you to the perfect pros for your project.

(815) 321-7882
24066 West Route 60 Grayslake, IL 60030
Serving Round Lake
We are a locally owned and operated company that values honesty and integrity and treats your home ...
See More
(708) 459-9427
509 Colonial Court Algonquin, IL 60102
Serving Round Lake
Last Call Construction is committed to excellence in every aspect of our business. We uphold a ...
See More
(815) 321-7749
P.O. Box 745 Wauconda, IL 60084
Serving Round Lake
At Stepanek Landscaping, Inc., we are focused on providing the finest quality products with the ...
See More
Find the Right Pro. Right Away.

Let our ProFinder technology instantly match you to the perfect pros for your project.

Showing 1-25 of 40
< Prev | 1 | 2 | Next >

Recent Job Requests for Additions & Remodeling Contractors in Round Lake, IL


New Lead
Project: Add a Sunroom or Patio Enclosure
Location: Round Lake, IL
Date: 08/11/2018
Project Description: Build a new sunroom or enclosed patio or porch
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Property Owner: Yes
Comment: I would like to get an estimate for building a sunroom.

Project: Remodel a Basement
Location: Round Lake, IL
Date: 08/09/2018
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence

Project: Remodel a Bathroom
Location: Round Lake Beach, IL
Date: 08/08/2018
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: Remove the tub to just a shower. New vanity, new floor. Remove bathroom door, add a barn door.

Project: Remodel a Kitchen
Location: Volo, IL
Date: 08/06/2018
Floorplan: I plan to maintain existing kitchen floorplan
Cabinets: No - I do not plan to move or update the cabinets
Appliances: No - I do not plan to move or update the appliances
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Lighting: No - I do not plan to update the lighting
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes
Comment: I have purchased all of the materials to put a backsplash around my entire kitchen. I need to hire a contractor to complete the installation.

Project: Renovate or Repair a Home
Location: Round Lake, IL
Date: 08/05/2018
Project Description: Several repair projects of varying nature
Comment: Replace large livingroom window, replace or repair sliding door, replace or repair ceiling fan - not working either via, remote, pull string or wall switch.

Project: Remodel a Bathroom
Location: Round Lake, IL
Date: 08/05/2018
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Comment: new floor, new toilet ,new shower with tile new walls

Project: Remodel a Bathroom
Location: Round Lake Beach, IL
Date: 08/02/2018
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: Complete remodel of two bathrooms.

Project: Remodel a Basement
Location: Round Lake, IL
Date: 08/02/2018
Basement Features: Kitchen
Design Preparation: Sketches of basic idea of project
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Comment: I want my basement to look and feel live able

Project: Renovate or Repair a Home
Location: round lake, IL
Date: 08/01/2018
Project Description: Major renovation
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Property Owner: Yes
Comment: I have a 3 story (includes basement) townhouse and would like to plan a remodel project to replace all existing flooring/carpeting, and remodel all bathrooms/kitchen (including cabinets). The purpose of the project is to update the appeal of the interior with the intention of selling the home. Floor Plan can be found here (1637 sq/ft): https://www.homesbymarco.com/models/4315/charleston_in_the_fairfield_lakes_subdivision_in__il

Project: Remodel a Bathroom
Location: Round Lake, IL
Date: 07/2018
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible