Top-rated acoustic ceiling tiles install pros.

Get matched with top acoustic ceiling tiles install pros in Cannelburg, IN

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Acoustic ceiling tiles install pros in Cannelburg

Avatar for White River Handyman
White River Handyman
5.0(
8
)

Serving Cannelburg, IN and surrounding areas

Approved

In business since 2023

Free estimates

Warranties offered

"From start to finish excellent work! Very professional and great communication. I will be hiring them again for all my up coming projects!"
Additional Photos
Additional Photos
Additional Photos
Response time2 days
4 neighbors recently requested a quote
Recommended by87%of homeowners
Avatar for Max's Drywall & Painting LLC
Max's Drywall & Painting LLC
New to Angi

Serving Cannelburg, IN and surrounding areas

Approved

In business since 2021

Free estimates

Credit card accepted

We have over 20 years of experience. We are committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade, combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.

drywall
interior paint
interior paint
drywall
Avatar for Loloprodz
Loloprodz
New to Angi

Serving Cannelburg, IN and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

We are a professional cleaning service dedicated to providing top-quality residential and commercial cleaning. We offer deep cleaning, regular maintenance, and move-in/move-out services. Our team is reliable, detail-oriented, and committed to making every space clean, fresh, and welcoming. Customer satisfaction is our priority.\nLooking for a trustworthy cleaning service? We specialize in residential and commercial cleaning, delivering spotless results every time. We focus on quality, reliability, and customer satisfaction. Let us handle the cleaning so you can enjoy a fresh and stress-free space.\n

1 neighbors recently requested a quote
Avatar for DWC Restoration Inc
DWC Restoration Inc
4.4(
83
)

Serving Cannelburg, IN and surrounding areas

In business since 2007

Free estimates

Emergency services offered

"They did an excellent job with all the work. It was timely, professional and they cleaned-up debris very thoroughly. I did have a water leak in one section in my kitchen. They came out and inspected it and then repaired the leak, the stains on the ceiling and then completely repainted my kitchen - even though the stains were only in a small area."
Recommended by83%of homeowners
Avatar for Legacy Window & Door LLC
Legacy Window & Door LLC
4.1(
151
)

Serving Cannelburg, IN and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"After receiving a few other estimates on a sunroom addition plus a screened in porch, we decided to go with Legacy Windows. Mark’s estimate was in the middle of the other estimates and he offered much more flexibility than the other companies we spoke to in terms of customization. He is a great salesman with previous marketing experience. We signed our contract on April 10th. We were told that Mark and his crew were finishing a room and would be able to start in 2-3 weeks with a timeframe of 6-8 weeks for completion of our room addition project. The budget and timeframe worked well for us, so we decided to add replacement windows for the rest of our house (11 windows total). Several weeks went by and our project had not yet started so we followed up with Mark. We were told that there were issues with his current project (did not pass inspection) and it would push our start date back due to the workmanship repairs. During this time period before any work began on our project we would communicate often with Mark to check on the status of our project. The really frustrating thing about working with Mark is his inability to fulfill commitments he would make to us in regards to project timing and when things would be done. Our primary communication with him was via text messages and time after time he would tell us, “we should be starting next week” or “we are going to be making up for lost time quickly” and time would pass and it just wouldn’t happen. Work on our project began when our existing windows were replaced in early June. The foundation for the expansion was finally started in late June and framing started in early July (roughly 3 months after signing the contract). The first crew completed the framing, hired the shingles out, installed some of the cedar siding, and installed one wall of windows. We were seeing decent progress after having such a long wait in the beginning, all the while the commitment issue just kept popping up. We would get a text saying something like, “going to be at the house tomorrow with some stone samples” and he wouldn’t show up. It was annoying, but progress was being made and we were happy with how the expansion was taking shape so we were willing to overlook it. Sometime toward the beginning of August (roughly 4 months after signing the contract), work just stopped. Again, when we would reach out to Mark asking about the status of our project we would be told, “I’ll have an action plan later this afternoon” or “we want to get everything we done we can this week” or “the crew will be there tomorrow and we will be working all week on your project trying to finish”. In the meantime, nothing would be done and we would repeat the process. This went on for over 3 weeks, during this time there was absolutely no work done. Large piles of construction trash and building materials sat in our yard during this time. A great deal of the usable wood began to warp and I am sure that ultimately materials had to be tossed from being left in the elements for so long. After a couple weeks I finally moved a significant portion of the usable wood up onto the deck so it would at least be partially protected. We found out that there was an issue with the electrical and Mark had decided to let Crew #1 go as they were not meeting his expectations, but it was not communicated to us until the end of the over 3 week period. A second crew then arrived who Mark said usually only did work for him on the south side of Indy (we live in Lebanon), but he wanted to get our project back on track. There seemed to be little to no communication between the crew and Mark on what they were supposed to work on so we had to explain to them what was in the contract to be completed. Crew #2 also started making good progress, they finished the cedar siding, got the rest of the windows installed in the sunroom as well as installing the sunroom ceiling. About this time, which was at the beginning of September we had a separate crew come out to do the drywall. Mark recommended them very highly. As it turned out, the drywall was not properly installed or insulated (in some walls there was no insulation), and ultimately it had to be taken down and redone by Crew #2. Crew #2 seemed to be doing a really good job and we were quite pleased with their progress and the quality of work they were doing for us. They were replaced by Crew #3 sometime in mid-September. We were never told why they were replaced, but Crew #3 was much closer to where we lived so I assume that had something to do with it. Much like when Crew #2 started, there seemed to be little communication between Crew #3 and Mark on what they were supposed to work on. So we again had to explain what was in the contract to be completed. All through the process, the commitment issues mentioned previously continued. We were not as happy with the quality of the work done by Crew #3 as we had been by Crew #2 (or even Crew #1), but they did finally complete for the project for us and after (3) failed attempts we finally received a pass from the building inspector on his final inspection. When Crew #3 decided they were finished they never came back, we communicated multiple times with Mark about the remaining punch list items to no avail and ultimately decided to finish most of the small punch list items ourselves instead of waiting any longer for them to finish (clean up, sanding / finishing drywall, etc.). We love the way the sunroom and covered porch area turned out. From contract signing until the end it took a little over six months, but in Mark’s defense he did agree to let us add a brand new window in the dining room of our house to tie everything together at no cost to us as appreciation for our patience. There are things that we liked about Mark’s company and things we didn’t, I have tried to summarize each category as follows: Positives • Price seemed reasonable • It is truly a custom build, no problem with changes we had at any point • Love the way it turned out, looks amazing • Mark seemed to genuinely care about the quality of the product he was delivering to us (he replaced the cedar shakes that had been installed by Crew #1 because he wasn’t happy with the quality Negatives • Our project seldom felt like it was a priority, part of the reason it took so long was because they were over committed on other projects • Commitment Issues (addressed previously) • Construction Trash left in our yard for months • We cleaned up inside more than they did, I understand drywall work is messy. They never swept up any of the dust and they didn’t clean up any of the clumps of dried drywall mud all over the floor. • We finished some of the minor punch list items, just to be done."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+70

Recommended by84%of homeowners
Avatar for Maximus General Contracting LLC
Maximus General Contracting LLC
4.4(
135
)

Serving Cannelburg, IN and surrounding areas

In business since 2000

Free estimates

Emergency services offered

"It went great. Eric was present when the insurance adjuster came to check it out and he worked with her to get us as much money as possible. Insurance only paid for the ceiling water stain removal and attic work, but not for roof replacement because roof problem was not from wind or hail, etc.
The work needed 3 contractors - Roof guys, mold remediator and Painter. We got quotes form 2 other companies, but decided to go with Eric due to several reasons - local business, he himself is the owner; the price, which was better than the other 2 companies; his ability to get the whole job done in 2.5 days during the snowy month of Jan-Feb. The roof guys worked in coordination with the Mold remediator and they finished that part in 1.5 days. The painter came another day and finished the interior work in that day. With the other companies, they were only able to do 1 or 2 of the things and we had to get the painter by ourselves.
The whole team did a great job. They cleaned up the yard completely.
We are still waiting on the paperwork - final receipts, the certificates for insurance purposes, though."
Recommended by92%of homeowners
Showing 1-10 of 43

FAQs for acoustic ceiling tiles install projects in Cannelburg, IN

Ask the following questions to make sure you know what’s involved and that you’ve hired a good team:

  • Is your company licensed, bonded, and insured?

  • What is the best tile size for my project?

  • What fire rating do my ceiling tiles need?

  • How long will it take to install the drop ceiling?

  • What is the height of the finished drop ceiling?

Most residential building codes require a minimum ceiling height of 7.5 feet from the floor to the finished drop ceiling, ensuring adequate headroom and safety compliance. Since requirements can vary by location, consult your local code enforcement office or a professional installer to confirm the specific clearance needed for your project.

Installing a drop ceiling results in a loss of ceiling height ranging from 3 inches to 8 inches. The exact amount depends on factors like the size of the fixtures above, such as ductwork or lighting, and the manufacturer's recommendations for installation. Local building codes also dictate minimum ceiling heights, so it's important to consult with a professional installer to determine the optimal drop distance for your specific space.

Installing drywall costs between $1.50 and $3 per square foot for materials, labor, and finishing—significantly less than the $9 to $13 per square foot average for a drop ceiling. While drop ceilings come with a higher initial cost, they offer greater design flexibility, easy access to utility lines, and are simpler and less expensive to repair. To minimize expenses, consider budget-friendly fiberboard panels, though their appearance may be less appealing to some homeowners.

Drop ceilings offer several advantages and disadvantages.

Pros:

  • Easy to install and repair

  • Conceal stains, ductwork, and other unsightly elements

  • Provide quick access to ducts and wiring for maintenance

  • Available in various styles to suit your design preferences

Cons:

  • Reduce ceiling height

  • Tiles may require replacement after a few years

  • Less sturdy than traditional ceilings

  • Installation can be more time-consuming than drywall

Removing a drop ceiling costs between $2 and $7 per square foot, which includes disassembling the rail system and removing tiles. Factors such as ceiling size, accessibility, and disposal fees affect the total cost. If you're removing a drywall ceiling, expect costs of $2 to $4 per square foot. Hiring a professional ensures safe removal and proper disposal, preventing damage to underlying structures.

The Cannelburg, IN homeowners’ guide to acoustic ceiling tiles installs

From average costs to expert advice, get all the answers you need to get your job done.