
Serving Alpine, AL and surrounding areas
Approved
In business since 2006
Free estimates
Credit card accepted
"Nathan musto, Donovan lomax, Jonathan Allen, James scogin, Kevin Logan. Worked long completed my shower install and made it beautiful."





+4


Serving Alpine, AL and surrounding areas
Approved
In business since 2006
Free estimates
Credit card accepted
"Nathan musto, Donovan lomax, Jonathan Allen, James scogin, Kevin Logan. Worked long completed my shower install and made it beautiful."





+4

Serving Alpine, AL and surrounding areas
Approved
Super Service Award Winner
In business since 2025
Emergency services offered
Warranties offered
"They wete the only Plumbing company that called me nack the same day. Everyone else it was going to take a day or two. They were efficient and professional."





+2

Serving Alpine, AL and surrounding areas
Approved
In business since 2025
Emergency services offered
Small jobs welcome
We pride our company on reliability, great communication, integrity, and quality work. Our top priority is customer satisfaction and will go the extra mile. We are experts in our trade and will work with you from conception to competition. We strive in making all clients, repeat clients. \n\nCall us today you will be relieved you did. Thank you





+26

Serving Alpine, AL and surrounding areas
Approved
Free estimates
Warranties offered
Credit card accepted
Five Star Bath Solutions of Central Alabama is the top-of-the-line bathroom remodeling company. We've earned this title by using advanced technology, custom products, and attention to customer service. Using innovative software, Five Star Bath Solutions professionals will deliver a detailed estimate for your bathroom renovation project at an affordable price. We believe in setting standards for how projects are estimated, installed, and completed and passing that value on to you.





+2

Serving Alpine, AL and surrounding areas
In business since 1992
Free estimates
"Great. I had this work done just over a year ago (should have submitted review sooner).
Estimate. Charlie examined bathroom, had plenty of samples of options to review, and provided firm fixed quote. There were some material issues that I'll note below. At no time did the final cost change.
Timeline. Installation began about a month or so after I accepted the quote and paid half down for material. I think Charile was ready in about 2 weeks, but I had business travel. Working together to find a common acceptable period for installation was easy.
Installation. The first day Charlie showed up with a crew of 4 to take care of the electrical work (did have another ceiling fan installed) and demolition. Following that, there were 2 full time workers on site. They worked long hours, well over 8 hour days. Normall, the job would have taken about a week. I'll give more detail on the one issue below that drew the task out longer. The guys were good about taking care not to impact the rest of the house (carpet, etc.). After install, they did a good job cleaning up.
During the install, there were a few minor options ... how to frame the door, orientation of tile, the color of the tile, etc. The crew provided options and good advice (I'm no kind of interior decorator). The part of the service was excellent.
Quality. I have done basic carpentry and electrical work. I believe the quality of the work to be good to excellent, both what you see and what was done "behind the dry wall." The work that you can see is excellent.
Material. I was a little worried about the material used for the walls as opposed to tile. I'm pleased to say I'm more than happy with the "acrylic" (I think that's correct) walls as well as base and door.
Only issue. The base received was not the correct one. The second base received had a quality issue. They guys pointed this out to me. I'm sure it cost them money out of their pocket / profit to spend the extra time on site. My take away from this was the guys were MY quality advocates and did what was necessary to ensure the highest quality product was used and the job was done right the first time! Things happen. The question is how well does your contractor support you. While I wasn't crazy about the delay (about 3 days, not major for me). I was thrilled the issue was immediately brought to my attention and resolved even though it took extra effort on their part.
Overall job outcome. I feel what was quoted was provided. Very satisfied.
1 year review ... I remain satisfied. I have had zero issues. Other than the glass doors (which are famous for requiring cleaning when used for bath doors - this was noted before installation). Is the biggest maintenance job. Caring for the bath itself has required average to minimal effort.
Give Dream Bath / Charlie a call before you have your bathroom remodeled!
"





+15
Serving Alpine, AL and surrounding areas
In business since 1995
Free estimates
"We recently bought a house and have hired a few companies to work on different projects. What we learned from the process is good handyman is hard to come by. That is why we feel very fortunate to find Complete Home Repair. Al and his sons are truly excellent. They worked on our house for 6 days on various things. They were always on time, polite, and thoughtful. We felt comfortable to leave them in the house, but we met every morning to discuss the work on previous day. They did a fabulous job. On the top of that, for whatever concern we had, they also went the extra mile to address it.
I want to share a small detail that I think shows Al's true color. One of the projects is Al installing a screen door for us. We agreed that if it takes more than 1 hour, he will charge more. On the next day, when I asked him how long it took him to finish the installation, Al told me exactly one hour. He could have told me longer and charged me more, but he didn't.
This is the second time we hired Al. We are sure that it will not be the last time. He not only earns our business, but also wins our heart. Highly recommended!!
"



Serving Alpine, AL and surrounding areas
In business since 1994
Emergency services offered
Credit card accepted
"After he figured out where the leak was coming from, he found that the whole faucet needed to be replaced. Had to travel 15 minutes away just to get a new one. Cleveland is a very little town. I had an appointment so I had to leave him by his self to complete job. When I got back home everything was done and it looked good and no longer leaks. Thank you so much.
"





+6

Serving Alpine, AL and surrounding areas
In business since 2025
Free estimates
Emergency services offered
"Cody is a great guy & a highly experienced plumber and is not afraid to get his hands dirty! Highly recommend!"
Serving Alpine, AL and surrounding areas
In business since 1989
Free estimates
Emergency services offered
"These gentlemen were very professional, informative, and very cooperative. When they discovered more damage to my roof, they inquired me before proceeding. They are still my go to contractors for my homes in MS while living out of state.
"





+1

Serving Alpine, AL and surrounding areas
In business since 2006
Credit card accepted
"It went well. After viewing both properties content, i was sent a couple of room plans.
"



From average costs to expert advice, get all the answers you need to get your job done.

Understand what goes into installing a sewer line, including materials, labor, permits, and potential landscaping considerations, to ensure a smooth and compliant connection to your local sewer system.

Discover the cost of slab leak repair, taking into account factors such as repair type, inspection fees, and local labor rates.

Budget for bathtub replacement costs based on factors such as bathtub type, material, removal, hardware, labor, plumbing work, and more.

Budget for main sewer line clog repair costs based on factors such as cleaning method, sewer age, project complexity, permits, labor, and more.

Need to clean your drain? Here’s how much it costs, what factors affect cost, and what to expect.

Use this guide to budget for toilet repair costs based on factors such as problem type, replacement part prices, labor, and more.