
Serving Bushkill, PA and surrounding areas
Approved (Corporate)
In business since 1929
Free estimates
Credit card accepted
"The installation of the walk-in shower was done in a very timely and professional manner."





+1


Serving Bushkill, PA and surrounding areas
Approved (Corporate)
In business since 1929
Free estimates
Credit card accepted
"The installation of the walk-in shower was done in a very timely and professional manner."





+1

Serving Bushkill, PA and surrounding areas
Approved
Free estimates
Credit card accepted
"Mattia was great! I had him come by next week and install a new sink and cup washer in my kitchen, I would 100% recommend him and will be calling him in the future."

Serving Bushkill, PA and surrounding areas
Approved
In business since 1994
Free estimates
Emergency services offered
"They were excellent. It took quite a while. They had their own people. Their contractors didn't waste any time. They came in the morning and worked through and left when they had to leave. They were all professional, organized and experienced. I had no problems. I would definitely use them again."





+57

Serving Bushkill, PA and surrounding areas
In business since 1998
Free estimates
Emergency services offered
"Tom from Safety Bath Solutions is an extremely good contractor. He pays amazing attention to detail, is thorough, courteous, clean, innovative, and creative. He respects your home and worked very well with this customer. We have already spoken to him about another project we would like to have him do. We highly recommend this hard working, caring company to anyone."



Serving Bushkill, PA and surrounding areas
In business since 2008
Free estimates
Warranties offered
"The install was impeccable. The product is well engineered and I love the workmanship. The two installers worked very hard and finished in two days. Iâ ll have them come back for my siding."





+174

Serving Bushkill, PA and surrounding areas
In business since 2019
Free estimates
Credit card accepted
"Outstanding. We had two stair lifts installed. One was going to be difficult because the door frame wasn't centered on the stairs. Other vendors refused to install the stairlift whereas Will (owner/installer) was willing to give it a try and would give us our money back if it didn't work. The chair couldn't swing round without hitting the door jam but with some slight modifications , he got it to work for us. Excellent work. A few days after the install we started hearing creaking and squeaking as things settled in and Will went out of his way to come back and make some adjustments to fix it."

Serving Bushkill, PA and surrounding areas
In business since 1982
Free estimates
Emergency services offered
"We went with American Home Remodeling after receiving an in-home estimate from Jim. We hadn’t really been actively looking into re-doing our roof, but someone had come door-to-door to see if we’d be interested in an estimate and we decided to go for it. We were told during the estimate that we had some mold, that was found in the attic while doing the estimate. This was only part of why we decided to have the roof redone. We had bought our house about 2 years ago and we knew when we bought it that the roof would need replacing pretty quickly as it was very old and we did have some issues with leaks during a heavy snow. We were told that we’d most likely get a call toward the end of September to start the work, of course this would depend on the weather and may be October if we had a lot of rain. I got a call on Wednesday afternoon asking if we’d be ok to have the guys come to start the next day. A little last minute, but luckily it worked for our schedule. I was told the guys would be there between 8-8:30 and the dumpster would be there around 10; Robert asked if we’d be ok with them putting the dumpster in the driveway, which we agreed to. I asked how long the project was expected to take since we were told during the estimate usually 3 days. I was told it might bleed into Saturday a bit, but majority would be done Thursday and Friday. The next day the materials were delivered around 7:30, the dumpster showed up around 8:30, however no one showed up to start working until about 10:40. They had only removed the shingles from the front side of the house before leaving for the day and left the worksite a mess with broken shingles laying everywhere. The next day I decided to work from home in case they had any questions or needed to get into the house for any reason. The guys showed up around 9 and I spoke with the foreman, Josh, who apologized for the way the site was left, apparently he had not been there the day before. Josh came in to check out our bathroom fan that was supposed to be fixed during this project as well, and while he was in the house we checked with him to make sure they would be replacing the plywood on the roof, as that’s what we were told since there was mold. We showed him in the attic where we had been told the mold was and he assured us that there wasn’t actually any mold there and they would not be replacing the plywood unless it was rotted. Not sure why Jim told us during the estimate that we had mold if we didn’t, but now we weren’t getting new plywood, which we were told that we would. Another reason we had decided to go with them, since we thought so much was being included in the repair. I went out to check on the progress around 12:30 on Friday since I was expecting most of the work to be done by the end of the day and saw that they only had about 2 rows of shingles on the house. I didn’t pay close enough attention to the shingles themselves since I was mainly worried about how much was being done, and I suppose that I should have. The guys left around 3:30 and mentioned they’d be back the next day to get some more done. When I went out to see what progress had been made (only about ¾ of the front side, nothing done to the back yet), I realized that they were installing the wrong shingles. We had ordered the ‘slatestone grey’ and looking at the name on the single packages still left they were installing a ‘colonial slate’. I immediately called the office and talked to a receptionist who informed me she was the only one left for the day and unfortunately the guy who could help me, Robert, would not be in again til Monday. She forwarded me to his voicemail even though she mentioned he probably wouldn’t hear it until Monday. I left a message explaining the situation and requested that he give me a call back as soon as possible. I waited around all day Saturday so that I could make sure the guys knew not to install any more shingles, as they were the wrong ones, and no one ever came. No call, no notice, just didn’t show up. First thing Monday morning I received a call from Robert who asked what was going on and then asked what I thought about the “colonial slate” shingles on the house. I told him truthfully that I really wished that I liked them because the guys had already finished ¾ of the front side, but I really didn’t like the look of them and it wasn’t what we had ordered or expected. He promised to take care of everything and agreed that the color of the shingles is one of the most important parts of a roofing job and it really should have been written down on our agreement. I really appreciated Robert taking care of the situation like he did. When I got home from work that day they had already taken off all the old shingles and had started putting the right ones on. By Wednesday they had completed the front side of the roof, and it looked so much better with the correct shingles! Took much longer than expected to complete everything, but the end result is beautiful and we’re hoping all the work that was put in pays off through these winter months! My biggest concern with the company was just the lack of communication and seeming disorganization during the process. The contract wasn't super clear on what exactly had been discussed during our estimate and what all was going to be included since Jim made us believe we'd be getting all new plywood, the shingle color wasn't even written down on our agreement, which caused much more work and a longer time to complete, and I wasn't given a heads up when the guys decided not to show up on Saturday. We also did a full-finance with them and I really didn't like that none of the terms were available or outlined to me before signing the agreement. Jim lead us to believe that we'd have 0% interest financing and turns out we're getting 7.99%; quite a big difference. All in all, I understand that it was a pretty hot week and since the weather was supposed to be good they weren't pushing too hard to get everything completed asap, but it seemed like they were really just taking their time with everything and not really hustling to get things done in a timely manner. I'm just hoping that everything was done right and that we won't have any issues with leaks or anything like that moving forward!"





+8

Serving Bushkill, PA and surrounding areas
In business since 2010
Free estimates
Emergency services offered
"They weren't cheap. They came as scheduled and did what they said they were going to do and it looked fine so we were happy with it. When you look at the cost and the amount of time that they were here it was pretty expensive, but they did what they said they were going to do and so that was what we were looking for. They were prompt. They came out and looked at the job, scheduled it and came back when they said they would come, it was great."





+24

Serving Bushkill, PA and surrounding areas
In business since 1978
Free estimates
Emergency services offered
"They did a terrific job from start to finish! The service "All Phases Contracting" performed was impeccable! Again from start to finish! Tom and his son came to my home to go over all the details of the project. They were there for an hour, explaining in detail all aspects of the project as well as answering all of my questions. I felt confident in moving forward with "All Phases Contracting" leading the way!
Tom even met me one weekday evening at Lowes to help me in purchasing specific items for the project. I have never tackled a home improvement project of this magnatude before. Tom, as well as his son, were a big help in guiding me in the right direction!
The project started as promised on time. Now, I must tell you, this is my one and ONLY bathroom!! Tom and his crew did a terrific job in keeping me going....literally, through out this project! On the first day,after the bathroom was gutted down to the studs, they put the old toilet back on! Completley functional! They continued to do this until the new toilet was installed! Tom had the entire crew there so I wouldn't have too much down time and so they could complete the main part of the project in the 4 day time window that Tom origianally promised. All told, the project took 8 days.
Bottom line, this bathroom of mine is beautiful! I can't believe my old 1955 bathroom is now transformed, thanks to "All Phases Contracting", into an amazing 21st Century bathroom!!
Tom and his crew were at the house when promised and always put down protective, heavy duty drop clothes to protect my wood flooring. At the end of the day, they vacumed up whatever was left behind, as well as taking away any trash.
I would, without a doubt use "All Phases Contracting" again in a heart beat! Thank you Tom and Crew!
"

Serving Bushkill, PA and surrounding areas
Free estimates
"The projects went very well! J&K are very pleasant to work with and completed all projects in a timely manner. One prized strength is their creativity and problem-solving. I recommend without reservations."





+210
From average costs to expert advice, get all the answers you need to get your job done.

Budget for bathtub replacement costs based on factors such as bathtub type, material, removal, hardware, labor, plumbing work, and more.

Use this guide to estimate the cost to regrout a shower based on the type of grout, tile size, and more.

Budget for the cost to replace a hose bib based on factors such as faucet type, location, plumbing line installation, permits, labor, and more.

Budget for sewer ejector pump costs based on factors such as pump capacity, pump material, maintenance, professional labor, and more.

Budget for gas line installation costs based on factors such as gas line type, pipe material, project type, permits, potential repairs, labor, and more.

Budget for main sewer line clog repair costs based on factors such as cleaning method, sewer age, project complexity, permits, labor, and more.