Top-rated shed, barn or playhouse builders.

Get matched with top shed, barn or playhouse builders in Durham, NC

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Shed, barn or playhouse builders in Durham

Avatar for Antonio Remodeling & Renovations
Antonio Remodeling & Renovations
4.5(
42
)
Shed, Barn or Playhouse - Build

Serving Durham, NC and surrounding areas

Approved

In business since 1997

Free estimates

Customers say: True professional

"We couldn't be happier with the finished project of our screened in porch and new deck!! It came out even more beautiful than we imagined. The wide screen system gives us unobstructed views of our property and the new deck is perfect. What we noticed immediately about Sergio and his crew was their attention to detail. Triple measuring to ensure accuracy, always consulting with us along the way and willing to make changes when we wanted to alter the plans. Sergio is so patient, as we changed our plans several times before we decided on the screen room. We can't say enough about the professionalism and talent of Sergio and his crew. Their work ethic is admirable. They are kind and respectful. At the end of the day the area was always cleaned and debris picked up. Our new deck and screen room is so solid and sturdy. And it looks like it's been here since the day we built our house 14 years ago. It doesn't look like it was just added on. That's how well it blends in. Everyone that comes over says the same thing! Also the county inspector said said it was rare that such a big project only had a couple minor things that needed to be tweaked. You will not be sorry if you hire these guys. We are planning to hire them again for some indoor projects. We won't use anyone else! You will not be sorry you hired Antonio's Remodeling! And we are already planning to use them again for some indoor projects!"
Kitchen and Bath Remodeling Project
Remodeling - Kitchen & Bathroom Project
Remodeling - Kitchen & Bathroom Project
Remodeling - General Project
Remodeling - General Project

+110

1 neighbors recently requested a quote
Recommended by80%of homeowners
Avatar for J&P Builders, LLC
J&P Builders, LLC
4.0(
54
)
Shed, Barn or Playhouse - Build

Serving Durham, NC and surrounding areas

Approved

In business since 2017

Free estimates

Emergency services offered

"I hired Jorge and his team to tear down an existing old deck and build a screened in porch. They did this job beautifully in a matter of a couple months. The woodwork, service, attention to detail was unmatched! Will hire them again for more projects in my home!!!"
Front Exterior Before
Finished
Exterior Front
Front Exterior After
In Progress

+37

Response time1 day
16 neighbors recently requested a quote
Recommended by90%of homeowners
Avatar for Yellow House Builders
Yellow House Builders
3.0(
2
)
Shed, Barn or Playhouse - Build

Serving Durham, NC and surrounding areas

Approved

In business since 2019

Free estimates

Small jobs welcome

Welcome to Yellow House Builders, proudly servicing Raleigh and the surrounding areas. Our goal is to complete your project to perfection. We look forward to building long lasting relationships with the customers that we serve. We look forward to serving you. Call us today! You will not be disappointed.\n

Response time4 days
Recommended by100%of homeowners
Avatar for Arcane Grain
Arcane Grain
5.0(
8
)
Shed, Barn or Playhouse - Build

Serving Durham, NC and surrounding areas

In business since 2020

Free estimates

Emergency services offered

"Rich did a great job adding custom shelving to two closets in my home. He was very professional and arrived at the time that we agreed to. No messes were left behind when the work was done. My closets look great now and have so much more storage space!"
Furniture - Custom Made Project
Remodeling - General Project
Furniture - Custom Made Project
Carpentry - Woodworking Project
Finished Carpentry and Woodworking Project

+28

Recommended by100%of homeowners
Avatar for S&B Storage Buildings
S&B Storage Buildings
4.3(
6
)
Shed, Barn or Playhouse - Build

Serving Durham, NC and surrounding areas

Free estimates

Credit card accepted

"Scott was upfront, honest & and answered all my questions. He was able to get my shed built within a week and a half of my first contact with him. He did everything including ground prep. All we had to do was pay him! My husband is very impressed with the construction & feels it is solid & well worth the money spent. Hands down Scott was the best price around & able to build much faster than any that sell pre-fab buildings. We really appreciate his integrity & good work. Hard to find these days. Contact him for all your shed & storage building needs!"
Storage Facilities Project
Storage Facilities Project
Storage Facilities Project
Storage Facilities Project
Storage Facilities Project

+56

Recommended by83%of homeowners
Avatar for R Harward Construction
R Harward Construction
4.4(
863
)
Shed, Barn or Playhouse - Build

Serving Durham, NC and surrounding areas

In business since 2006

Free estimates

Credit card accepted

"Well, until they left. Randy was to return to 1) replace a cast iron shower pan that cracked during installation 3) fix the buckled vinyl flooring his crew put in one bathroom and the pantry and 3) mount a chimney cap. Never did. But the worst is that Randy took a 200 year old slab of old-growth pine (approximately 30" wide by 42" long by 2.5" thick) salvaged from my great-great-grandparents' home and promise me a coffee table. TWO YEARS LATER I CAN'T EVEN GET THE SLAB BACK."
Fireplace/ Bookcases
Bathroom Remodel
Fireplace/ Bookcases
Bathroom Remodel
Recommended by86%of homeowners
Avatar for Divine Design & Remodeling
Divine Design & Remodeling
4.7(
18
)
Shed, Barn or Playhouse - Build

Serving Durham, NC and surrounding areas

In business since 2001

Free estimates

Credit card accepted

"Things we liked: 1. Detailed contracting and pre-work planning, with detailed materials and labor estimates. 2. Provided evidence of license and insurance. 3. Excellent design, excellent materials, and precise construction of high-quality custom cabinetry and other wood work, including under-cabinet LED lighting, and fireplace mantle. 4. Negotiated with vendor to get good price and extended warranties included in the cost of all new kitchen appliances. 5. Nice installation of tile floors in kitchen, bathroom, and laundry room. 6. Excellent installation of stacked limestone panels floor to ceiling on a high angled wall around the fireplace, plus very attractive custom-made wood mantle, and new tiles on the hearth. 7. Worked effectively with vendor on design, purchase, and installation of premium granite countertops and trim, and kitchen and bathroom sinks. 8. Installation of premium plumbing fixtures in bathrooms and kitchen, no leaks apparent. 9. Well-done side job of installing two new steps, small landing, and wood screen door with dog flap on the deck. 10. Very cooperative about several minor design and installation changes along the way, with acceptable cost changes. 11. Contractor was on-site nearly every weekday and on many weekends. 12. Contractor is friendly, polite, considerate, and very aware he is working in someone’s home. Things that disappointed us: 1. No advance communication on one-week delay in starting the job. 2. Time estimates. We were told at least 3 weeks in a row that he would be done “next week.” Job actually took twice as long (about 15 weeks) as the original time estimate (6-8 weeks). We can allow one extra week for the changes and add-ons we asked for, but not double for the entire job. 3. Erratic attendance of assistants on the job appeared to contribute to significant delays. 4. Delegated cabinet finishing (staining and water-repellent top coats) to assistant, whose work had to be re-done in multiple places and still detracts from otherwise beautiful wood work. 5. Trim work is absent where cabinet panels meet hardwood floor, leaves what we consider a very unattractive gap. 6. Installation of wall tiles. The tile vendor did not tell us the tiles we picked for floors and shower walls were not for walls; the contractor had a hard time making them stay on the walls. I suggested changing wall tiles but contractor assured us that he could cut and install to get the look we wanted; tiles had to be cut, installed, torn off, and re-installed; were held onto concrete backer board with nails until cement dried, putting holes in the backer board behind the grout lines; tiles cut at angle for exposed corners were ragged and retained grout unevenly, and there was no accommodation for corners, so after the job was done we ordered and installed plastic corner guards with silicone (total cost of materials and shipping approx. $125) to cover unattractive and sharp tile edges. I estimate that installation of shower wall tiles alone took 2 weeks, maybe more. For the kitchen backsplash, smaller tiles were used and installed well, but there was no accommodation for where backsplash would transition to drywall, so tiles at drywall had edges exposed; we ordered edge pieces off-contract from a home improvement store, contractor installed them. It appeared to us that the contractor did not plan for tile corners and transitions. 8. Drywall and paint work. Drywall around arch that widened a doorway was not taped, and contraction of the mud has created a crack around the arch. Drywall work where lights and ceiling fans were moved and/or installed is lumpy and visible; one place on the ceiling was not finished and the supporting mesh is obvious right on the surface. Paint where the ceiling paint meets the shower wall tile grout is on the grout and cannot be scrubbed off and in our opinion will need to be covered by crown molding to make appearance acceptable to us, something we did not plan. Other places where wall tile meets drywall show evidence of damage to the drywall surface (e.g., surface paper torn off) that was not repaired, so it is uneven and lumpy. Bathroom was to be repainted, but not all trim was repainted, including a window that was caulked with colored caulk on white paint. The wall with the arch and the kitchen walls involved in wall cabinet installation were only partially repainted with the same color but different roller texture can be seen; the whole walls must be re-painted for uniform appearance. 9. Organization and worksite management. Our homeowner association informed us that neighbors grew impatient with the construction trailer and trash in the driveway, which were present from mid-November to early March. In general, we were unhappy with protection of the work site. Garage floor and wood steps have sizeable spots of paint and stain. Hardwood floors in the highest-traffic area were protected with cardboard only after we insisted on it, and then there were still paint cans and tools stored directly on the dining room hardwood floor. Stain cans were routinely left uncovered overnight. New tile floors and granite countertops were not protected from subsequent cabinet staining, so we did a lot of post-construction removal of paint, stain, glue, etc., from tiles and expensive granite that could have been protected, even with newspaper and masking tape. Grout haze was left on new tile for at least a week and then was incompletely removed; we spent several days scrubbing it off with white vinegar. Two manuals for new appliances were lost. Job proceeded in a sequence that was hard for us to understand or predict, perhaps depending on when assistants were available (a guess?), so there was little completed and usable across three rooms for more than three months. 10. Contract oversight/business management. Extended warranties for kitchen appliances (refrigerator, gas range, microwave oven, dishwasher) were supposed to be part of the package cost but the invoice the contractor presented to us did not include extended warranties on two of the four; I contacted the vendor, purchased the two warranties by credit card, and backed this cost out of the contract. Contractor deviated from the contract’s payment schedule, asking for unscheduled early payments to cover labor costs. Contract called for all invoices for materials to be presented; most were not. We presented an extensive punch list toward the end of the job, which we added to as we found things that needed to be corrected. We found at least one or two items that he crossed off but were not done. 11. Complete lack of follow up. This is a serious problem to us, given our financial and time investment. Before and during the job, we communicated well by text message and email. Since he finished on March 2, I have contacted him 5 times to request a time we could meet and talk about issues described here; he responded quickly to the first two messages saying he would get back to me, but didn’t, and he has not responded at all to the last three attempts to contact him since April 8. The contract has an arbitration requirement, but the contractor used his home address as his business address but moved during the job, and we do not have a mailing address for him, so we are unsure how to invoke arbitration. I contacted a handyman service on Angie’s List to get an estimate to correct several items described above; this estimate is $1,350 on top of the cost of the renovations in general. This review will stand until the contractor contacts me and corrects what we consider to be deficiencies. I will consider an update if he does. Overall grade: C. I would not use again."
Decks
Baths
Trim
Additional Photos
Additional Photos

+2

Recommended by84%of homeowners
...
Showing 1-10 of 107
FAQs for shed, barn or playhouse building service projects in Durham, NC

Barndominiums cost $50 to $200 per square foot (or $65 to $160 per square foot for finished living areas). You’ll pay even more for a larger barn house. This project costs more than the typical barn construction because you’ll need elements like a kitchen, bathroom, and finished living spaces. Building a barn house is comparable to building an actual home.

A high-quality barn lasts 40 to 60 years when built with robust materials and maintained with dedicated care. Quality construction practices and a strict maintenance schedule ensure that key structural components, such as support posts and roofing, remain effective for more than 60 years. This long lifespan offers homeowners sustained functionality and reliability over time.

The project type determines the construction timeline for a barn. A standard pole barn finishes in six weeks, a traditionally framed or steel-framed barn concludes in four months or more, and a barndominium takes six months or longer due to the extensive design, electrical, plumbing, and finishing details. This schedule ensures each phase is completed efficiently by qualified professionals.

When planning to construct your barn, it's important to review local building codes and zoning regulations. These regulations may include guidelines on building height, property boundaries (setbacks), lot coverage, and easements. Understanding and complying with these requirements helps ensure your barn is built safely and legally and avoids any permitting delays.

The Durham, NC homeowners’ guide to shed, barn or playhouse building services

From average costs to expert advice, get all the answers you need to get your job done.