Serving Ellerslie, MD and surrounding areas
In business since 1999
Free estimates
Credit card accepted
"After a super sales job by Dana on Oct 5, 2020, we expected the job to be started in approx 8 weeks (it was on Nov 23, 2020) and that the crew would stick with it until complete. The crew was very good and polite. They kept to themselves upstairs in the master bath (due to COVID and they wore masks) and worked hard to demo our old bath and prepare for the new install. The Kohler shower with a rolling glass door was completed without issues. We only received one of the 2 vanities we had ordered and received the wrong light fixtures for above the vanities. They did install the waterproof LV floor, which is very nice and what we selected. We waited for the second vanity (decided to go with the style of the first one installed, for expediency sake) and the correct light fixtures to arrive and then get the crew back here to Radford, VA. The foreman Memphis did make several local trips to get the wall paint, the ceiling vent/light, and the towel/robe hooks we would order originally but were not included in materials brought. Four weeks from start to (not quite) finish. The bathroom looked great and we were happy and paid the balance of the cost of the bathroom upon completion, on Dec. 18, 2020. Approx 2 months later we had a leak in the under-vanity plumbing which damaged our living room ceiling. Evidently, the nuts under the vanity were not installed tightly enough and it dripped until the under sink slide-out drawer was full and leaked out of the back of the vanity down the wall to stain the living room ceiling. We shut off the water source to the vanity until the crew came again to inspect and by then I had discovered a fine crack in the back corner of my vanity, which had to have either arrived that way or happened during install. That has to be replaced. Memphis looked at the leak and asked if we had any Primer. We did, and he painted the spots (L-shaped discoloration). The stains are still there as the primer did not cover the stain Waiting on the new vanity AND the entire living room ceiling to be repainted. Jim Plecker came on April 1 to view the damage and see the crack in the vanity top. He said that the new vanity would be ordered and he would have the crew back to install the same and repaint the ceiling. It is May 9 today and I have not heard back. I am waiting and will add an addendum to this review when the job is truly Finished."





























