Top-rated shower installers and replacers.

Get matched with top shower installers and replacers in Laurel, MD

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Shower installers and replacers in Laurel

Avatar for Five Star Bath Solutions of Annapolis
Five Star Bath Solutions of Annapolis
5.0(
17
)

Serving Laurel, MD and surrounding areas

Approved

In business since 1996

Free estimates

Emergency services offered

"I highly recommend Five Star Bath Solutions. They are first class, outstanding company that did wonderful job for me. The quality of their work was excellent, and their price was excellent. I did a major master bathroom upgrade (completely new shower, new soaking tub, new Wayne's coating). I got quotes from several competitors and Five Star Baths had by far the best design solution, the best materials (their Sentrel product had a far better look and feel than their competitor's acrylic), and a surprisingly lower cost. I was the most impressed with the quality of people I worked with from the sales person (Patrick), to the owner (Rob), to the designer/installer (Bo), to the office manager (Brittni). They were all very skilled, very experienced professionals, and wonderful to work with. I had tough schedule, and they went out of their way to accommodate me and get the work done on time. They are a great company with lots of depth. They exceeded my expectations in every area."
Walk-in tub
Remodel
Bathtub
Shower
Shower

+16

Response time12 hrs
297 neighbors recently requested a quote
Avatar for West Shore Home Baltimore
West Shore Home Baltimore
4.9(
412
)

Serving Laurel, MD and surrounding areas

Approved

In business since 2006

Free estimates

Credit card accepted

"We are absolutely in love with our new shower. We hired West Shore Homes to remove our existing tub/shower combo and replace it with a new shower. The installers Jordan and Tim were very customer oriented and technically skilled. They arrived per the schedule and completed the installation in a very reasonable amount of time. All while being courteous enough to answer all of our questions. The installation was very high quality, and included replacement of the existing drywall behind the shower with plywood sheets. This provided a rock solid backing for the acrylic material that we selected. Additionally, all of the components used were of stellar quality. As I indicated, we absolutely love the finished product and have no qualms about recommending West Shore Homes for this type of work."
After
Before
After
Before
After

+4

1278 neighbors recently requested a quote
Recommended by97%of homeowners
Avatar for Mad City Windows & Baths
Mad City Windows & Baths
4.4(
830
)

Serving Laurel, MD and surrounding areas

Approved

Super Service Award Winner

In business since 2001

Free estimates

Warranties offered

"Replaced a walk-in shower. Removal of the old and installation of the new took approximately 8 hours. We are pleased with the product and the installation"
windows
siding
siding
siding
windows

+20

Response time10 mins
5418 neighbors recently requested a quote
Recommended by90%of homeowners
Avatar for Third Generation Ceramic Tile & Plumbing
Third Generation Ceramic Tile & Plumbing
4.7(
67
)

Serving Laurel, MD and surrounding areas

Approved

In business since 1952

Free estimates

Emergency services offered

"Wonderful. Honorable. My toilet was leaking and I needed the flange repaired/replaced. I was quoted a price that was lower than a another company but still high, I thought. When the techs fixed the toilet, they realized it wasn't as bad as they thought. The original quote was based on a worse case scenario kind of thing. They could have held me to the quote but actually only charged a little over 1/2 the original quote. I was really pleased. As a woman it is hard to find contractors you can trust. The fact that this company and his men did an honorable act has won me over and they are now my go to plumbers. Yes. They fixed the issue very well. Oh and get this... They showed up on time. Winning....."
Kitchen Refrigerator
Kitchen Counter
Kitchen Sink
Shower After
Vanity After

+3

Response time1 day
9 neighbors recently requested a quote
Recommended by87%of homeowners
Avatar for Laurel Plumbing Inc
Laurel Plumbing Inc
4.8(
85
)

Serving Laurel, MD and surrounding areas

Approved

In business since 1987

Warranties offered

Credit card accepted

"I called and asked for an estimate to replace an existing sump pump. The price quoted was very reasonable and $175.00 less than another company. The work was promptly scheduled. They arrived on time and the new sump pump was installed very quickly. We have not had any rain since it was installed but, I am confident there will not by any issues. Great, friendly service!"
Recommended by97%of homeowners
Avatar for DreamMaker Bath & Kitchen
DreamMaker Bath & Kitchen
4.9(
32
)

Serving Laurel, MD and surrounding areas

Approved

In business since 1983

Warranties offered

Credit card accepted

"Love it! There was no question that we wanted Steve Everett of Dream Maker Bath and Kitchen to remodel our bathroom, as he had remodeled our kitchen 2 years ago and we were very familiar with his integrity, professionalism, skill and dedication. It took about 5 weeks to complete the job, and that is about what we expected. Steve hires only top notch professionals to work with him, so they were all very skilled, hard working, prompt, pleasant and made every effort to coordinate their schedule and to minimize disruption to our household. They removed part of a wall, which enlarged our bath to accommodate an extra set of storage cabinets, and made a porcelain tiled shelf on the window box behind the free standing tub. We joked that it would be a great place to set a wine glass! Our old shower was enlarged and replaced with a glass enclosed, tiled shower. The dual sinks were replaced along with the cabinets and counter top. Flooring was replaced with porcelain tile. We love our "new" master bath and kitchen! Every day feels like we are on vacation and staying in a luxury condo! If you have an idea for your kitchen and/or bath, Steve Everett can make it come to life! We highly recommend him!"
Additional Photos
Additional Photos
Additional Photos
Before
After

+18

Response time2 days
Response rate89%
Recommended by100%of homeowners
Avatar for DMV Kitchen & Bath Inc
DMV Kitchen & Bath Inc
4.8(
322
)

Serving Laurel, MD and surrounding areas

Approved

Super Service Award Winner

In business since 2010

Free estimates

Warranties offered

"We selected DMV based on our previous experience with the company starting with Rolando who successfully remodeled our kitchen and 3 baths back in 2015 and with Javier in remodeling of 1 bathroom, construction of an outdoor shed, and finally remodeling of our 1st and 2nd floors. For details on this more recent 2022 project consult my review elsewhere on Anji. . The construction area consisted of two sides of the basement--the “finished” side for an office *** guest room plus a small hallway; the other, a larger “unfinished” side for storage. The project began by moving everything in the small hallway to other parts of the house. Then they cleared what would be the “finished” side of the basement moving the sofa bed, several desks, 3 bookcases, a couple office chairs, a table, several bookcases, 7 file cabinets, clothes and other items from the closet, and numerous boxes of books plus files removed from file cabinets to the other side of the basement or, when necessary, to other parts of the house, outdoor shed, and garage while they worked on the “finished” side. Some of the items in the “unfinished” side had to be moved out of the basement to another part of the house to make room for heavier items that could not be lugged upstairs without breaking someone’s back. Two more file cabinets that I had not yet emptied they moved on a dolly to the other side of the basement. I regretted having emptied the 7 other file cabinets so that even more boxes with file contents had to be carefully labelled and moved to the other side. That was my fault! It was a complex undertaking since we were adding to what was already stored on the “unfinished” side, but the men were creative, cooperative, and experienced in meeting the challenge with us. The work began on the “finished” side and small hallway with demolition of the existing ceiling and lighting. Once the men cleaned up that mess they installed electrical cabling, wood, and drywall for the ceiling. They repaired the 2 feet of drywall around the bottom perimeter of the wall. Once the basic structure was in place they applied 2 coats of plaster to the walls and ceiling, and then sanded them. They taped the corners and joints. Following our selection of paint, they applied primer on the walls and ceiling, sanded, and then applied 2 coats of off-white paint to the walls and ceiling. What a beautiful transformation of the walls! To prepare for the installation of the luxury vinyl tile floor planks on the “finished” side and hallway they evened out the existing concrete with additional concrete. They lay the beautiful, brownish-gray floor planks on the concrete floor. Javier convinced us that the brownish-gray would be a good selection and he was right. Then the men installed baseboards and shoe molding around walls of the finished side and hallway. At some point they installed 8 recessed lights. What amazing acoustics in that room while it was still empty! In the latter phase of the “finished” side Alvaro repaired, sanded, and painted the stairway and lay the luxury vinyl tile floor planks to the stairs. To match the stairway, he sanded and stained the stair railing to match the stairs. He also repaired, sanded, and painted the walls off-white on either side of the stairway and the ceiling. Finally he painted the door separating the basement and kitchen. What a major transformation of that stairway! We were so pleased with the results! In the next phase of the project we transferred our attention to the “unfinished” side. After covering all the furniture, boxes, etc. with plastic they installed electrical cabling, wood, and dry wall on the ceiling. Then they applied plaster to the ceiling, sanded it, primed and painted it with 2 coats of paint. Then they installed 11 recessed lights to what previously was a deep, dark dungeon. When that major work was completed and the plastic removed, they vacuumed the area as best they could and moved the furniture and some of the boxes and bins back to the “finished” side. After a gap in construction Alvaro installed four heavy-duty, industrial-welded, steel storage units with adjustable shelves along the walls of the “unfinished” side of the basement so we didn’t have to worry about flimsy shelves collapsing with the weight of heavy boxes and plastic bins. Gradually we filled the shelves and file cabinets, moving some items temporarily stored in other parts of the house back to the basement. Alvaro (?) also installed a steel storage unit at one end of the garage to hold our daughters’ heavy boxes, some of which had been moved out of the basement and were collapsing with the weight of far too many boxes stacked on each other. Thanks to Javier for that creative solution to the problem! The DMV workmen did some additional jobs not directly related to repairing and painting walls and ceilings, installing hardwood/vinyl floors and lighting in the basement. Once the major work was done in the basement they went upstairs and moved some of the remaining displaced items to other parts of the house, garage, and shed. They installed a smoke detector and carbon monoxide detector, secured 2 bookcases to the wall, installed 3 transition pieces on the floors beneath the doorways, and installed 3 dimmers for the lights. After completing most of the work in the basement they performed extra tasks not listed in the contract upstairs, tasks like tightening the screws in a door that would not close, installing a toilet seat, repairing a knob on one of our utility closets, and moving an office chair in the family room to the garage for goodwill. Fabio installed 4 internet connections: 2 in the basement, 1 in the family room on the ground floor, and 1 in the den on the second floor. Finally my husband and I could use our computers! Then when all was said and done the men installed dimmers swept and cleaned the two sides of the basement and hallway one last time. Muchas gracias to Alex and Wilmer for doing most of the moving, cleaning, and trash collection, to Alvaro and Cesar for doing the construction including installation of the shelving units, to Fabio for installing the 4 internet connections, and to Orlando and Jose for wrapping things up at the end. Bon trabajo! The quality of materials and workmanship on the basement remodeling was exceptional as we have come to expect of this company. And because we are an elderly couple we really appreciated the extra help in moving things around in the basement and around the house. The workmen were reliable, polite, honest, skilled, hardworking, and flexible in adjusting to additions and changes from time to time. They always took extra care to clean up at the end of the day and to pick up trash as it was collected. The price seems reasonable given the extra work not previously budgeted. Javier was great at planning, communicating, and allowing for extra time when we needed it to make decisions on where to put things or to do some of the moving ourselves, but he could certainly have benefited from having a right-hand man to assist him when he was not immediately available. We would highly recommend DMV for home remodeling projects. We selected DMV based on our previous experience with the company starting with Rolando who successfully remodeled our kitchen and 3 baths back in 2015 and with Javier in remodeling of 1 bathroom, construction of an outdoor shed, and finally remodeling of our 1st and 2nd floors. For details on this more recent 2022 project consult my review elsewhere on Anji. . The construction area consisted of two sides of the basement--the “finished” side for an office *** guest room plus a small hallway; the other, a larger “unfinished” side for storage. The project began by moving everything in the small hallway to other parts of the house. Then they cleared what would be the “finished” side of the basement moving the sofa bed, several desks, 3 bookcases, a couple office chairs, a table, several bookcases, 7 file cabinets, clothes and other items from the closet, and numerous boxes of books plus files removed from file cabinets to the other side of the basemen"
Kitchen Remodeling-Medallion Cabinets
contemporary microwave installed on the kitchen island
Vienna -VA Kitchen
Bathroom Brookeville-MD
Kitchen Remodeling-Medallion Cabinets

+50

Response time11 hrs
41 neighbors recently requested a quote
Recommended by96%of homeowners
Avatar for Renuity
Renuity
4.4(
35
)

Serving Laurel, MD and surrounding areas

Approved (Corporate)

In business since 2000

Free estimates

Warranties offered

"Replaced a bow window and a patio slider. They accomplished it all in one day. They were clean, covered everything up when they were working so there was minimal dust. Vacuumed when they finished. Pleasant and professional. I highly recommend Rite Window."
Entry Door
Doors
Doors
Doors
During Installation

+55

Response time6 hrs
1339 neighbors recently requested a quote
Recommended by69%of homeowners
Avatar for VKB Kitchen & Bath
VKB Kitchen & Bath
4.7(
335
)

Serving Laurel, MD and surrounding areas

Approved

In business since 2002

Free estimates

Emergency services offered

"The project manager of the remodel, Jason, was always in contact with me about when workers would be at the house and to see how everything was going. He also stopped by the house to check on the work. Ismar, the head employee of the job, was very good. He put down tarps to cover the floors and put plastic about the furniture and cabinet in bathroom. He also put up plastic between the bathroom and the bedroom to minimize the dust. The workers were very professional. The tile work in the shower was great. They also had to hang some drywall to fix a closet and paint it. It looks like that was always how the closet was. The shower come out beautiful. I would highly recommend the company and would differently use them again."
Kitchen Remodeling in Severn, MD white countertop, cabinets & wooden floors
Kitchen Remodeling in Silver Spring, MD with wooden flooring & quartz countertop
Home Remodel with New Kitchen, Bathroom, Basement & Decking
Complete Home Makeover of Kitchen, Bath & Basement in Laurel, MD
Kitchen Remodel in Laurel, MD with quartz countertop & wooden flooring

+1053

Response time1 day
4 neighbors recently requested a quote
Recommended by91%of homeowners
...
Showing 1-10 of 673
FAQs for shower installation and replacement projects in Laurel, MD

You should regrout tile every 10 to 15 years, provided it is well-maintained with regular cleaning and sealing. Over time, grout can deteriorate due to exposure to moisture, foot traffic, and the use of cleaning agents. If you start to see cracks, discoloration, crumbling grout, or loose tiles, it’s a sign that regrouting is needed sooner.

The most effective way to clean grout involves a combination of powerful cleaning agents and the right tools. Using a dedicated grout brush intensifies the cleaning process, ensuring a deep clean. Create a powerful homemade solution by mixing baking soda, hydrogen peroxide, and dish soap to break down deeply embedded dirt. After cleaning, reseal the grout to lock in protection and maintain its appearance.

You can't regrout tile without removing the existing grout and expect good, long-lasting results. You must replace the old grout when it begins to crumble and fail. New grout cannot properly adhere to existing grout, meaning moisture will still reach the damaged layer and cause additional water damage, which will be more costly to deal with in the long run.

Visible indicators, such as cracks, stains, chipping, and mold growth, signal that your grout is compromised and no longer maintains its bonding strength. If you notice these issues, cleaning alone won't restore the grout's integrity. In such cases, consider complete or partial regrouting to preserve your surfaces and prevent further damage.

The Laurel, MD homeowners’ guide to shower installations and replacements

From average costs to expert advice, get all the answers you need to get your job done.