Top-rated basement remodelers.

Get matched with top basement remodelers in Linton, IN

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Basement remodelers in Linton

Daniel Wallace
New to Angi

Serving Linton, IN and surrounding areas

Approved

I’m a hardworking person who doesn’t like to leave projects half finished or looking sloppy, I can be a bit of a perfectionist. I’ve always fixed and built almost everything I needed myself and I take pride in being self sufficient. I’ve been an electrician for a year and half now and before that I was fabricating aerators for private residences. I have a wife and two children, so I can handle the chaos of a whole house remodel even if you decide to alter any details halfway through.

Nunez General Construction Llc
New to Angi

Serving Linton, IN and surrounding areas

Approved

Free estimates

Credit card accepted

Offers commercial services

With three years of hands-on experience in framing, remodeling, and home additions, We provide reliable and detail-oriented work throughout all Indiana and Ohio. We have experience with residential & commercial framing, renovations, and structural improvements.\n\nI believe in doing things the right way — solid structure, clean finishes, and clear communication. My goal is to deliver quality results that homeowners can trust.

1 neighbors recently requested a quote
Avatar for Built by YOU
Built by YOU
4.8(
31
)

Serving Linton, IN and surrounding areas

In business since 2008

Free estimates

Emergency services offered

"Our remodel went extremely well with excellent results. We highly recommend Aaron Prange and Built by YOU to anyone considering a remodel or building their own home. <br /> <br /> Aaron lined up his contractors who arrived on time and completed the work quickly and with beautiful results. Sub-contractors were scheduled concurrently or back-to-back such that our time without the conveniences of a kitchen were at a bare minimum. Additionally, the quality of the completed work was outstanding and performed by people I welcomed into my home and around my family. <br /> <br /> Aaron put me at ease with my own budgetary constraints and often found ways to come in under budget without sacrificing quality or our overall goals. Aaron always made me feel that my remodel was just as important as other larger home building projects he may have had at the time. <br /> <br /> Aaron was always accessible! He was usually on-site on a daily basis expediting the work being done or handling any issues that arose. If not on-site, Aaron called to check on the work done that day or to inform us of who and what to expect the next day, including work to be done and what time to expect workers to arrive. <br /> <br /> In short, his people arrived on time, did exactly the work I expected, were courteous and cleaned up after themselves and like Aaron, followed through to ensure our satisfaction. He did a beautiful job with our remodel!!"
Recommended by90%of homeowners
Avatar for Legacy Window & Door LLC
Legacy Window & Door LLC
4.5(
116
)

Serving Linton, IN and surrounding areas

Free estimates

Emergency services offered

Warranties offered

"After receiving a few other estimates on a sunroom addition plus a screened in porch, we decided to go with Legacy Windows. Mark’s estimate was in the middle of the other estimates and he offered much more flexibility than the other companies we spoke to in terms of customization. He is a great salesman with previous marketing experience. We signed our contract on April 10th. We were told that Mark and his crew were finishing a room and would be able to start in 2-3 weeks with a timeframe of 6-8 weeks for completion of our room addition project. The budget and timeframe worked well for us, so we decided to add replacement windows for the rest of our house (11 windows total). Several weeks went by and our project had not yet started so we followed up with Mark. We were told that there were issues with his current project (did not pass inspection) and it would push our start date back due to the workmanship repairs. During this time period before any work began on our project we would communicate often with Mark to check on the status of our project. The really frustrating thing about working with Mark is his inability to fulfill commitments he would make to us in regards to project timing and when things would be done. Our primary communication with him was via text messages and time after time he would tell us, “we should be starting next week” or “we are going to be making up for lost time quickly” and time would pass and it just wouldn’t happen. Work on our project began when our existing windows were replaced in early June. The foundation for the expansion was finally started in late June and framing started in early July (roughly 3 months after signing the contract). The first crew completed the framing, hired the shingles out, installed some of the cedar siding, and installed one wall of windows. We were seeing decent progress after having such a long wait in the beginning, all the while the commitment issue just kept popping up. We would get a text saying something like, “going to be at the house tomorrow with some stone samples” and he wouldn’t show up. It was annoying, but progress was being made and we were happy with how the expansion was taking shape so we were willing to overlook it. Sometime toward the beginning of August (roughly 4 months after signing the contract), work just stopped. Again, when we would reach out to Mark asking about the status of our project we would be told, “I’ll have an action plan later this afternoon” or “we want to get everything we done we can this week” or “the crew will be there tomorrow and we will be working all week on your project trying to finish”. In the meantime, nothing would be done and we would repeat the process. This went on for over 3 weeks, during this time there was absolutely no work done. Large piles of construction trash and building materials sat in our yard during this time. A great deal of the usable wood began to warp and I am sure that ultimately materials had to be tossed from being left in the elements for so long. After a couple weeks I finally moved a significant portion of the usable wood up onto the deck so it would at least be partially protected. We found out that there was an issue with the electrical and Mark had decided to let Crew #1 go as they were not meeting his expectations, but it was not communicated to us until the end of the over 3 week period. A second crew then arrived who Mark said usually only did work for him on the south side of Indy (we live in Lebanon), but he wanted to get our project back on track. There seemed to be little to no communication between the crew and Mark on what they were supposed to work on so we had to explain to them what was in the contract to be completed. Crew #2 also started making good progress, they finished the cedar siding, got the rest of the windows installed in the sunroom as well as installing the sunroom ceiling. About this time, which was at the beginning of September we had a separate crew come out to do the drywall. Mark recommended them very highly. As it turned out, the drywall was not properly installed or insulated (in some walls there was no insulation), and ultimately it had to be taken down and redone by Crew #2. Crew #2 seemed to be doing a really good job and we were quite pleased with their progress and the quality of work they were doing for us. They were replaced by Crew #3 sometime in mid-September. We were never told why they were replaced, but Crew #3 was much closer to where we lived so I assume that had something to do with it. Much like when Crew #2 started, there seemed to be little communication between Crew #3 and Mark on what they were supposed to work on. So we again had to explain what was in the contract to be completed. All through the process, the commitment issues mentioned previously continued. We were not as happy with the quality of the work done by Crew #3 as we had been by Crew #2 (or even Crew #1), but they did finally complete for the project for us and after (3) failed attempts we finally received a pass from the building inspector on his final inspection. When Crew #3 decided they were finished they never came back, we communicated multiple times with Mark about the remaining punch list items to no avail and ultimately decided to finish most of the small punch list items ourselves instead of waiting any longer for them to finish (clean up, sanding / finishing drywall, etc.). We love the way the sunroom and covered porch area turned out. From contract signing until the end it took a little over six months, but in Mark’s defense he did agree to let us add a brand new window in the dining room of our house to tie everything together at no cost to us as appreciation for our patience. There are things that we liked about Mark’s company and things we didn’t, I have tried to summarize each category as follows: Positives • Price seemed reasonable • It is truly a custom build, no problem with changes we had at any point • Love the way it turned out, looks amazing • Mark seemed to genuinely care about the quality of the product he was delivering to us (he replaced the cedar shakes that had been installed by Crew #1 because he wasn’t happy with the quality Negatives • Our project seldom felt like it was a priority, part of the reason it took so long was because they were over committed on other projects • Commitment Issues (addressed previously) • Construction Trash left in our yard for months • We cleaned up inside more than they did, I understand drywall work is messy. They never swept up any of the dust and they didn’t clean up any of the clumps of dried drywall mud all over the floor. • We finished some of the minor punch list items, just to be done."
Recommended by84%of homeowners
Avatar for Building Associates, Inc.
Building Associates, Inc.
5.0(
6
)

Serving Linton, IN and surrounding areas

In business since 1983

Free estimates

Warranties offered

"They did a great job. We have a historic home and it was a challenging project. They took pictures before so he could show us what he would be doing. They are very knowledgable about the products they use, very professional, and if we have had any problems they are timely in sending someone out. The job was in a emergency situation and they were very good at coordinating with other construction workers to get the job done in a timely manner."
Recommended by100%of homeowners
Avatar for Pritchett Bros Inc
Pritchett Bros Inc
4.7(
9
)

Serving Linton, IN and surrounding areas

In business since 1963

Free estimates

Emergency services offered

"We had a basement bathroom with the toilet located near the center of the room. Previous owner had finished the basement himself and had placed walls without taking into account location of drains. All plumbing fixtures were loose and incorrectly installed. Dry wall was poor. Switches were located on wrong wall and door had been installed backward. Prichett Bros not only repaired and replaced literally the entire bathroom, including massive concete work, they helped us to design a very modern and up-to-date space using the latest products available at a very good price. They were professional and timely at all appointments. They contacted us regularly regarding the progress of the work. The workmen they selected for the project were extremely talented and all of the work very well done The entire project was finished on time. I would definietly recommend them for any major renovation project."
Recommended by88%of homeowners
...
Showing 1-10 of 72
FAQs for basement remodeling projects in Linton, IN

Finishing a basement turns unused square footage into livable space and returns up to 70% of what you spend when you sell your home. Beyond that resale boost, you gain a playroom, home office, or guest suite you can start enjoying right away. That mix of daily comfort and solid return on investment (ROI) makes basement finishing one of the smartest upgrades you can tackle.

In some parts of the country—especially lots on swamps, high water tables, or other wetlands—local codes prohibit basements. Saturated soil puts constant pressure on foundation walls and lets water seep in faster than any sump pump can handle. 

If your property sits on waterlogged ground, building on a slab or crawl space is often safer, more affordable, and code-compliant.

Most basements wrap up in four to eight weeks. Framing takes three to five days, with electrical and plumbing rough-ins following over the next week. Add five days for drywall, two to three for flooring, and another week for paint, trim, and punch-list items. 

Delays can happen if materials run late or your contractor’s calendar is packed, so build in a little cushion when you plan.

Whether a finished basement counts toward your home’s official square footage depends on local rules. Many areas only include below-grade space if it has code-approved egress, fully finished walls, ceilings, and floors, plus consistent heating. 

Check with your local assessor or building department before you start; meeting those standards can affect taxes, appraisals, and resale value.

Building codes require a checklist: dedicated heat and electrical service, a code-approved stairway, and at least one egress window or exterior door. Walls, ceilings, and floors must be fully finished and meet insulation, ventilation, and fire-separation standards. If you add a bedroom, you’ll also need a closet, proper clearances, and safe exits. If you change the layout later, be ready to update the space so every new room still meets today’s code.

The Linton, IN homeowners’ guide to basement remodelings

From average costs to expert advice, get all the answers you need to get your job done.