Top-rated window repair pros.

Get matched with top window repair pros in Midland, IN

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Window repair pros in Midland

Avatar for JD Hostetter & Associates
JD Hostetter & Associates
4.7(
580
)
New Windows - 3-5New Windows - 6 +New Window - Single+9 more

Serving Midland, IN and surrounding areas

Approved

In business since 2004

Free estimates

Warranties offered

"Excellent service. Paint crew worked tirelessly for two days power washing, scraping, caulking, and then finally painting. They met and exceeded my expectations. Gutter crew installed covers and rehung two gutters that were flowing the wrong way (a problem that a previous company failed to correct). So far (<1 month), the covers and the repair seem to be working. Pricing and scheduling were very reasonable. I would not hesitate to use JD Hostetter & Associates again."
Additional Photos
Exterior Painting
Exterior Painting
Additional Photos
Before

+14

10 neighbors recently requested a quote
Recommended by94%of homeowners
Avatar for Renewal by Andersen
Renewal by Andersen
3.9(
127
)
New Windows - 6 +New Windows - 3-5New Windows - 2

Serving Midland, IN and surrounding areas

Approved (Corporate)

Super Service Award Winner

In business since 2007

Free estimates

Warranties offered

"The installers were great. The salesperson made promises that he did not keep and he missed a window. When the person came to measure he also didn’t catch that I was having all my windows done except one. The windows look great. The response when I notified the co that one window was missed was very fast but added to my cost."
Brighten up your office space!
City Apartments
Create an oasis in the primary bedroom
Create a nice beach view
Floor to ceiling sunlight

+2

Response time10 mins
5421 neighbors recently requested a quote
Recommended by65%of homeowners
Avatar for Field Service Network LLC
Field Service Network LLC
4.2(
11
)
New Window - SingleNew Windows - 2New Windows - 3-5+1 more

Serving Midland, IN and surrounding areas

Approved

In business since 2011

Free estimates

Emergency services offered

"After being told by another company that it may be a few months before they could fix our problem, I received a call from Jon that evening and he was out to inspect our issue the next day! We now have our doors and water damage fixed and it only took a matter of days! Would highly recommend to anyone needing a housing matter resolved."
Roof
Tear off
Removel
After
Before

+6

Response time1 day
3 neighbors recently requested a quote
Recommended by40%of homeowners
Daniel Wallace
New to Angi
Door or Window Screens - Install or RepairEgress Window - InstallHardware, Latches & Tracks (Window) - Repair or Replace+5 more

Serving Midland, IN and surrounding areas

Approved

I’m a hardworking person who doesn’t like to leave projects half finished or looking sloppy, I can be a bit of a perfectionist. I’ve always fixed and built almost everything I needed myself and I take pride in being self sufficient. I’ve been an electrician for a year and half now and before that I was fabricating aerators for private residences. I have a wife and two children, so I can handle the chaos of a whole house remodel even if you decide to alter any details halfway through.

Firm Foundation Creating Spaces
New to Angi
Door or Window Screens - Install or RepairEgress Window - InstallHardware, Latches & Tracks (Window) - Repair or Replace+5 more

Serving Midland, IN and surrounding areas

Approved

Free estimates

Small jobs welcome

My wife and I with the help of a few friends designed and built our log home. We have since, remodeled a house built in 1895 back to original as much as possible. We also pastor a church in our town. We are all about the restoration process. I love taken a space and creating something new, fresh, and with purpose and life. To take a space and make it useable once again. We love working with clients that want to see transformation. The clients vision and input is so important and we will implement every possible detail they desire.

Avatar for Barrier Windows
Barrier Windows
4.8(
58
)
Hardware, Latches & Tracks (Window) - Repair or ReplaceNew Window - SingleNew Window - Single - For Business+11 more

Serving Midland, IN and surrounding areas

In business since 1996

Free estimates

Emergency services offered

"Excellent service. What is especially important for others to know is I purchased the windows 16 years ago. Twice I had issues with a window and the service was quick and I was not charged for the repair/replacement because of the lifetime warranty. Best investment I have made as a homeowner! Easy to maintain/clean and they look beautiful. Using locally-owned businesses is important to me and N. Masten has earned my trust and respect tenfold."
Remodeling - General Project
Remodeling - General Project
Remodeling - General Project
Remodeling - General Project
Remodeling - General Project

+37

Recommended by100%of homeowners
Avatar for Legacy Window & Door LLC
Legacy Window & Door LLC
4.1(
151
)
Door or Window Screens - Install or RepairEgress Window - InstallNew Window - Single+12 more

Serving Midland, IN and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"After receiving a few other estimates on a sunroom addition plus a screened in porch, we decided to go with Legacy Windows. Mark’s estimate was in the middle of the other estimates and he offered much more flexibility than the other companies we spoke to in terms of customization. He is a great salesman with previous marketing experience. We signed our contract on April 10th. We were told that Mark and his crew were finishing a room and would be able to start in 2-3 weeks with a timeframe of 6-8 weeks for completion of our room addition project. The budget and timeframe worked well for us, so we decided to add replacement windows for the rest of our house (11 windows total). Several weeks went by and our project had not yet started so we followed up with Mark. We were told that there were issues with his current project (did not pass inspection) and it would push our start date back due to the workmanship repairs. During this time period before any work began on our project we would communicate often with Mark to check on the status of our project. The really frustrating thing about working with Mark is his inability to fulfill commitments he would make to us in regards to project timing and when things would be done. Our primary communication with him was via text messages and time after time he would tell us, “we should be starting next week” or “we are going to be making up for lost time quickly” and time would pass and it just wouldn’t happen. Work on our project began when our existing windows were replaced in early June. The foundation for the expansion was finally started in late June and framing started in early July (roughly 3 months after signing the contract). The first crew completed the framing, hired the shingles out, installed some of the cedar siding, and installed one wall of windows. We were seeing decent progress after having such a long wait in the beginning, all the while the commitment issue just kept popping up. We would get a text saying something like, “going to be at the house tomorrow with some stone samples” and he wouldn’t show up. It was annoying, but progress was being made and we were happy with how the expansion was taking shape so we were willing to overlook it. Sometime toward the beginning of August (roughly 4 months after signing the contract), work just stopped. Again, when we would reach out to Mark asking about the status of our project we would be told, “I’ll have an action plan later this afternoon” or “we want to get everything we done we can this week” or “the crew will be there tomorrow and we will be working all week on your project trying to finish”. In the meantime, nothing would be done and we would repeat the process. This went on for over 3 weeks, during this time there was absolutely no work done. Large piles of construction trash and building materials sat in our yard during this time. A great deal of the usable wood began to warp and I am sure that ultimately materials had to be tossed from being left in the elements for so long. After a couple weeks I finally moved a significant portion of the usable wood up onto the deck so it would at least be partially protected. We found out that there was an issue with the electrical and Mark had decided to let Crew #1 go as they were not meeting his expectations, but it was not communicated to us until the end of the over 3 week period. A second crew then arrived who Mark said usually only did work for him on the south side of Indy (we live in Lebanon), but he wanted to get our project back on track. There seemed to be little to no communication between the crew and Mark on what they were supposed to work on so we had to explain to them what was in the contract to be completed. Crew #2 also started making good progress, they finished the cedar siding, got the rest of the windows installed in the sunroom as well as installing the sunroom ceiling. About this time, which was at the beginning of September we had a separate crew come out to do the drywall. Mark recommended them very highly. As it turned out, the drywall was not properly installed or insulated (in some walls there was no insulation), and ultimately it had to be taken down and redone by Crew #2. Crew #2 seemed to be doing a really good job and we were quite pleased with their progress and the quality of work they were doing for us. They were replaced by Crew #3 sometime in mid-September. We were never told why they were replaced, but Crew #3 was much closer to where we lived so I assume that had something to do with it. Much like when Crew #2 started, there seemed to be little communication between Crew #3 and Mark on what they were supposed to work on. So we again had to explain what was in the contract to be completed. All through the process, the commitment issues mentioned previously continued. We were not as happy with the quality of the work done by Crew #3 as we had been by Crew #2 (or even Crew #1), but they did finally complete for the project for us and after (3) failed attempts we finally received a pass from the building inspector on his final inspection. When Crew #3 decided they were finished they never came back, we communicated multiple times with Mark about the remaining punch list items to no avail and ultimately decided to finish most of the small punch list items ourselves instead of waiting any longer for them to finish (clean up, sanding / finishing drywall, etc.). We love the way the sunroom and covered porch area turned out. From contract signing until the end it took a little over six months, but in Mark’s defense he did agree to let us add a brand new window in the dining room of our house to tie everything together at no cost to us as appreciation for our patience. There are things that we liked about Mark’s company and things we didn’t, I have tried to summarize each category as follows: Positives • Price seemed reasonable • It is truly a custom build, no problem with changes we had at any point • Love the way it turned out, looks amazing • Mark seemed to genuinely care about the quality of the product he was delivering to us (he replaced the cedar shakes that had been installed by Crew #1 because he wasn’t happy with the quality Negatives • Our project seldom felt like it was a priority, part of the reason it took so long was because they were over committed on other projects • Commitment Issues (addressed previously) • Construction Trash left in our yard for months • We cleaned up inside more than they did, I understand drywall work is messy. They never swept up any of the dust and they didn’t clean up any of the clumps of dried drywall mud all over the floor. • We finished some of the minor punch list items, just to be done."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+70

Recommended by84%of homeowners
...
Showing 1-10 of 52