How much will your project cost? Get Quotes Now

Bathroom Remodelers in Moody, AL

Where do you need a Bathroom Renovation Contractor?

Are You a Quality Pro? Join Our Network

Recent Job Requests for Remodel a Bathroom Contractors in Moody, Alabama:


Project Location: 35004
Date: 06/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes

Project Location: 35004
Date: 06/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Comment: I want to make my shower larger. I want more cabinet space.

Project Location: 35004
Date: 05/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes

Project Location: 35004
Date: 05/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Property Owner: Yes
Comment: want to remove existing shower and tub, create a walk in shower with no glass. new toilet, new flooring, new lighting and vanity area.

Project Location: 35004
Date: 05/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months

Project Location: 35004
Date: 05/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Comment: II

Project Location: 35004
Date: 04/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Desired Completion Date: Timing is flexible

Project Location: 35004
Date: 04/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
Comment: Remodeling bathroom adding additional sink, replace tub and add separate shower.

Project Location: 35004
Date: 03/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes

Project Location: 35004
Date: 03/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible

Project Location: 35004
Date: 02/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Comment: Completely redo the entire bathroom

Project Location: 35004
Date: 12/2018
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Comment: Take out large garden tub. Move shower in its place. Take current shower out and replace with storage cabinets. New vanity with built in counter top. Take existing window out and put in a smaller one. New flooring. I want pebble shower floor and natural type/looking tile.

Project Location: 35004
Date: 12/2018
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Comment: I have a small bathroom that needs gutting, floor, tub,toilet and vanity. Just trying to get an idea on prices.

Project Location: 35004
Date: 10/2018
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Comment: Need to remove tub and install walk in shower. Remove existing tile and cabinets and replace.

Project Location: 35004
Date: 09/2018
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Comment: Have a fiberglass tub that needs replacing and would like to update vanity and sink

Project Location: 35004
Date: 08/2018
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Comment: Remodel master bath. New shower Cabinet counter tops faucets etc

Project Location: 35004
Date: 08/2018
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Comment: Remodel master bath. New shower Cabinet counter tops faucets etc

Project Location: 35004
Date: 08/2018
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible

Project Location: 35004
Date: 08/2018
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Comment: Master bathroom in need of upgrade. It's not a large bathroom at all & will keep current floor plan. Shower needs to be tiled. Currently has "fake" insert tile thingy. Cabinet & sinks, mirror & possibly countertops needs changing. Just changed toilet 2 months ago. Flooring is currently laminate & needs replacing. Tub is jetted & never used but want "backsplash" added around tub to come up & meet bottom of window.

Project Location: 35004
Date: 08/2018
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible

Unscreened Addition & Remodeling Contractors in Moody, Alabama

Hillhouse & Associates
508 Sharpsburg Cr.
Birmingham, AL 35213
Russ Building Company, LLC
609 Eagle Ridge Dr.
Birmingham, AL 35242
Walker Contracting Services
432 13th Court Nw
Birmingham, AL 35215
PDF Building Contractors, LLC
708 Forest Lakes Drive
Sterrett, AL 35147
Creative Designers & Builders, Inc.
2231 Arlington Ave. South, Apartment A
Birmingham, AL 35205
Moses Construction, LLC
360 Carr Drive
Jacksonville, AL 36265
C.E.P. Construction, LLC
P.O. Box 688
Pelham, AL 35124
CDH Custom Builders
57 Creek Trail
Leeds, AL 35094
Trinity Specialty Contractors, LLC
337 Hackney St.
Lincoln, AL 35096