Top-rated walk in tub installers and replacers.

Get matched with top walk in tub installers and replacers in Sparks Glencoe, MD

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Walk in tub installers and replacers in Sparks Glencoe

Avatar for David Rutch's Precision Remodeling Inc
David Rutch's Precision Remodeling Inc
4.9(
98
)

Serving Sparks Glencoe, MD and surrounding areas

Approved

In business since 2004

Free estimates

Warranties offered

"We recently hired Precision Remodeling to replace our old wooden back deck with a new composite one. Dave walked us through all the options clearly & concisely, as well as pointing out potential issues that may affect the project cost / timeline. The project cost was in the ballpark of what we were expecting, so we confident with the decision. The Precision Remodeling crew arrived on time each morning, left the site clean each afternoon, and the foreman kept us up to date with status of work / upcoming permit reviews / etc. Dave also checked in throughout the project and addressed any concerns. The final product looks awesome, and would definitely reach out to Precision Remodeling for future work in & around the house."
Additions
Additions
Additions
Additions
Additions

+142

Response time2 days
14 neighbors recently requested a quote
Recommended by97%of homeowners
Avatar for VKB Kitchen & Bath
VKB Kitchen & Bath
4.8(
309
)

Serving Sparks Glencoe, MD and surrounding areas

Approved

In business since 2002

Free estimates

Emergency services offered

"2 of 997 Urgent: Project Management Issues & Pending Renovation Work We are experiencing significant project management issues that have caused unnecessary delays and frustration.Their quality of work is good but project management sucks big time,. We started our bathroom rennovations on Nov 29th 2024 the project wsda supposed to be completed in 5 weeks now it is almost 2 months and the master bathroom still needs to begin constreuction. We have had 3 project managers so far. However, despite multiple follow-ups over the past week via our text messaging group and several calls, we have yet to receive any updates on a variety of outstanding work in the loft and guest bathroom that need to be done. This lack of communication and progress is unacceptable. While we understand that Elkay is taking a break, the responsibility for keeping us informed and ensuring the project stays on track should not be neglected. We are not getting proper updates about stataus of several pending issues and we feel like we are being passed around without any clear resolution or accountability. The most pressing concern is the arrival of the bathtub, as all further work on the master bathroom is stalled until it arrives."
Kitchen Remodeling in Severn, MD white countertop, cabinets & wooden floors
Kitchen Remodeling in Silver Spring, MD with wooden flooring & quartz countertop
Home Remodel with New Kitchen, Bathroom, Basement & Decking
Complete Home Makeover of Kitchen, Bath & Basement in Laurel, MD
Kitchen Remodel in Laurel, MD with quartz countertop & wooden flooring

+1053

Response time1 day
8 neighbors recently requested a quote
Recommended by90%of homeowners
Avatar for Anderson Home Improvements, LLC
Anderson Home Improvements, LLC
5.0(
35
)

Serving Sparks Glencoe, MD and surrounding areas

Approved

In business since 1995

Free estimates

Customers say: Quick response

"Douglas was hired to get my pool cleaned and ready for swimming. The pool looked like a swamp when he came to give me an estimate. His estimate was a good price so we hired him. He did a fantastic job. He worked very hard trying to get my pool swimmable. He came several days and worked for hours scooping leaves and stuff out of the pool. He scrubbed and vacuumed many times. In the end, he did it and I was very happy. He is one of the hardest working men I have ever seen. Great personality and feels like family. I would recommend him for any job. I will have more work for him in the future. 5 stars."
kitchen in Ellicott city
cabinets,flooring
kitchen
flooring and cabinets
counter tops

+1

Response time2 days
Recommended by80%of homeowners
Avatar for Renken Remodeling
Renken Remodeling
4.7(
38
)

Serving Sparks Glencoe, MD and surrounding areas

Approved

Super Service Award Winner

In business since 2018

Free estimates

Warranties offered

"We hired Renken to replace a shattered glass shower door. Justin showed up right on time. He was very professional and friendly. He knew exactly what needed to be done and worked very efficiently and effectively. He ensured all the glass and debris was cleaned up. We highly recommend Renken, and particularly Justin, for any remodeling and/or repair job. "
Full Bathroom Remodel Project
Before and After
Shower Expansion Before and After
Remodeling - Kitchen & Bathroom Project
Remodeling - Kitchen & Bathroom Project

+19

Response time2 days
Response rate100%
4 neighbors recently requested a quote
Avatar for WALTERS HOME IMPROVEMENT
WALTERS HOME IMPROVEMENT
4.8(
23
)

Serving Sparks Glencoe, MD and surrounding areas

Approved

In business since 1980

Free estimates

Emergency services offered

"I was absolutely pleased with the work that was done. Everything was completed and cleaned up in record of time! I was super impressed with the professional and personal assistance I received during the entire process. I would be not hesitate to recommend the company! Now"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+23

3 neighbors recently requested a quote
Recommended by86%of homeowners
Avatar for Long Home
Long Home
4.7(
169
)

Serving Sparks Glencoe, MD and surrounding areas

Approved

Super Service Award Winner

In business since 1945

Free estimates

Credit card accepted

"Very professional. Got in (used tarps where needed). Did a fantastic job and got out in 1 day (cleaned up and removed old materials). Followed up with us to make sure that everything was to our satisfaction. Will use this company again!"
Wet Area Replacement
Wet Area Replacement
Response time6 hrs
408 neighbors recently requested a quote
Recommended by89%of homeowners
Avatar for 4 Seasons Construction
4 Seasons Construction
5.0(
9
)

Serving Sparks Glencoe, MD and surrounding areas

Approved

Customers say: Quick response

"Gus Moniodis of 4 Seasons Construction, LLC did a fantastic job on remodeling my kitchen. My house was built in the early 70’s and the kitchen needed to be gone. He did a fantastic job on clearing everything out and even worked around my appliances that I was keeping. He was very helpful on suggesting were I could purchase my cabinets and countertop at reasonable prices. Gus also did whatever I asked and even gave suggestions on some things because this was my first venture on doing anything like this. He was very professional and left my house clean, once he was finished for the day. Always on time and communicating which is very important to me. I know who I’ll be calling on my next project!!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+96

9 neighbors recently requested a quote
Recommended by100%of homeowners
Showing 1-10 of 15
FAQs for walk in tub installation and replacement projects in Sparks Glencoe, MD

Because Medicare classifies walk-in tubs as non-durable medical equipment, it generally won’t pick up the tab. Medicaid can help if a doctor certifies that the tub is medically necessary, but rules change by state. Call your plan early, ask which forms you need, and keep any prescriptions or letters on file to improve your odds of reimbursement.

A walk-in bathtub’s fill and drain times hinge on your home’s water pressure and the tub’s hardware. Most models with a fast-fill faucet need about six to eight minutes to fill and two to three minutes to drain; larger basins or standard drains can tack on an extra 10 minutes. Stay seated until the water is completely gone so you don’t swing the door open on a full tub’s worth of water.

A walk-in bathtub holds 50 gallons of water, and its design supports capacities that range from 40 to 80 gallons, depending on the product. In contrast, a standard bathtub holds 25 to 45 gallons. This capacity is determined by the fixed design of the tub and its construction materials. Homeowners should review the detailed product specifications to confirm the exact volume available for use during bath time.

Walk-in tubs are tax-deductible when the purchase qualifies as a necessary medical expense and meets the IRS criteria. Caregivers who install a walk-in tub also qualify for the Dependent Care Tax Credit under specific conditions. Homeowners must verify these requirements with the IRS and consult a tax professional, as state and program guidelines enforce strict documentation standards for such deductions.

The Sparks Glencoe, MD homeowners’ guide to walk in tub installations and replacements

From average costs to expert advice, get all the answers you need to get your job done.