Compare Quotes from up to 3 Pros

Addition & Remodeling Contractors in Ann Arbor, MI

Where do you need Addition & Remodeling Contractors?


Deals Tag = Deals
Compare quotes with a single request

Let our ProFinder technology instantly match you to the perfect pros for your project.

(734) 352-3397
3932 Trade Center Drive Ann Arbor, MI 48108
If you are looking for the quality work and great customer service you need in completing home ...
See More
(734) 991-8441
211 East Merrill Street, Suite 507 Birmingham, MI 48009
Serving Ann Arbor
Renaissance Restorations Inc. specializes in historic and old home restorations ranging from ...
See More
(734) 352-3234
27252 Southfield Road, Suite 4 Southfield, MI 48076
Serving Ann Arbor
We're your one-stop shop to transform your bathroom or kitchen into a true masterpiece. Our ...
See More
Find the Right Pro. Right Away.

Let our ProFinder technology instantly match you to the perfect pros for your project.

Showing 1-25 of 36
< Prev | 1 | 2 | Next >

Recent Job Requests for Additions & Remodeling Contractors in Ann Arbor, MI


New Lead
Project: Remodel a Garage
Location: Ann Arbor, MI
Date: 08/15/2018
Scope of Remodel: Completely remodel garage
Storage cabinets / shelving: No - I do not plan to add or update the cabinets / shelving
Garage doors: No - I do not plan to update the garage doors
Insulation: Yes - I plan to add insulation
Flooring: Yes - I plan to update the flooring
Electrical: Yes - I plan to update the lighting or electrical fixtures
Interior walls or drywall: Yes - I plan to add or remove walls or drywall
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Property Owner: Yes
Comment: We have a garage that is only semi-insulated and isn't finished. We use it for both a vehicle and as a gym space. We'd like to have it updated, insulated, flooring options, etc.

New Lead
Project: Remodel a Bathroom
Location: Ann Arbor, MI
Date: 08/15/2018
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: I need a new shower pan and bathroom cabinet. I am looking for ideas on what would be the best way to do this

New Lead
Project: Remodel a Kitchen
Location: Ann Arbor, MI
Date: 08/12/2018
Floorplan: I am considering changes to kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: Yes - I plan to move or update some or all appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: No - I do not plan to update the flooring
Lighting: Yes - I plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes

New Lead
Project: Remodel or Renovate One or More Rooms
Location: Ann Arbor, MI
Date: 08/11/2018
Nature of project: Remodel / update a few rooms
Rooms to be Remodeled: Basement
Design Preparation: Sketches and/or basic idea of project
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes
Comment: Looking to add code-compliant bedroom and full bath to fully finished basement. We are also looking to add a sunroom out back.

New Lead
Project: Remodel a Bathroom
Location: Ann Arbor, MI
Date: 08/10/2018
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: More than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: My current upstairs bathroom is the original 1960s, so I'd like to replace with newer mid-cost options for completion before Christmas 2018, if possible. Thank you. xxxx

New Lead
Project: Remodel a Kitchen
Location: Ann Arbor, MI
Date: 08/10/2018
Floorplan: I plan to maintain existing kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: Yes - I plan to move or update some or all appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: Yes - I plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes
Comment: remodel to update 1963 ranch house kitchen

New Lead
Project: Remodel a Bathroom
Location: Ann Arbor, MI
Date: 08/10/2018
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No

New Lead
Project: Remodel a Basement
Location: Ann Arbor, MI
Date: 08/10/2018
Basement Features: Exercise Area
Design Preparation: Sketches of basic idea of project
Basement Area Description: Finished
Square Footage: More than 800 (large)
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Property Owner: Yes
Historical Work: No
Covered by Insurance: No
Comment: I am considering installing a gym in my home basement. The basement currently has low dropped ceilings; I'd like to raise at least a portion of this; It will likely require moving some duct work and plumbing in between the joists. May want some new flooring as well.

New Lead
Project: Remodel a Kitchen
Location: Ann Arbor, MI
Date: 08/10/2018
Floorplan: I am considering changes to kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: No - I do not plan to move or update the appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: Yes - I plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes

New Lead
Project: Remodel a Basement
Location: Ann Arbor, MI
Date: 08/09/2018
Basement Features: Bathroom(s), Laundry, Stairway, Workshop
Design Preparation: Sketches of basic idea of project
Basement Area Description: Unfinished
Square Footage: Less than 400 (small)
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
What kind of location is this?: Home/Residence
Property Owner: Yes
Historical Work: No
Covered by Insurance: Yes
Comment: We had a flood in mid May in the basement. Paul David restoration completed the demo- The basement was insured. The claim has been completed. I have the funds in hand from the mortgage company, and I am needing to have the work done, and the project permitted no later than Mid November. I have a deadline of August 31st to submit plans and necessary docs to insurance company. Please call immediately to begin the process and come out and take a look at the job. Caitlin