Compare Quotes from up to 3 Pros

Addition & Remodeling Contractors in Old Hickory, TN

Where do you need Addition & Remodeling Contractors?


Deals Tag = Deals
Compare quotes with a single request

Let our ProFinder technology instantly match you to the perfect pros for your project.

(615) 843-8667
880 Conference Drive Goodlettsville, TN 37072
Serving Old Hickory
Serving middle Tennessee and southern Kentucky for over 38 years, American Home Design has helped ...
See More
(866) 390-5613
1919 Appomattox Drive Lebanon, TN 37087
Serving Old Hickory
Archadeck of Nashville is the premier custom designer and builder of outdoor living structures in ...
See More
(615) 564-7329
1937 Burke Hollow Road Nolensville, TN 37135
Serving Old Hickory
Diversified Management Group, LLC, specializes in remodeling homes and specialized building ...
See More
Find the Right Pro. Right Away.

Let our ProFinder technology instantly match you to the perfect pros for your project.

Showing 1-18 of 18

Recent Job Requests for Additions & Remodeling Contractors in Old Hickory, TN


New Lead
Project: Add a Sunroom or Patio Enclosure
Location: Old Hickory, TN
Date: 03/25/2019
Project Description: Enclose existing patio or porch with roof, walls or windows
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Comment: Screened in porch with roof and 1 wall. Want totally enclosed with floors and windows.

Project: Build an Addition
Location: Old Hickory, TN
Date: 03/18/2019
Project Description: Design and build
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Comment: Converting a detached garage into an apartment

Project: Remodel a Bathroom
Location: Old Hickory, TN
Date: 03/16/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No

Project: Renovate or Repair a Home
Location: Old Hickory, TN
Date: 03/15/2019
Project Description: Several repair projects of varying nature
Comment: Renovating apartment in our house. Need a pass through door and closet doorway framed out. Two walls to be dry walled and prepped for painting.

Project: Renovate or Repair a Home
Location: Old Hickory, TN
Date: 03/05/2019
Project Description: Major renovation
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Comment: I need a bathroom put in, two bathrooms remodeled, kitchen renovated, panel taken down in bedroom...

Project: Remodel a Bathroom
Location: Old Hickory, TN
Date: 02/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: Remove tub with jets but will not replace. Change out vanity and sinks. Replace tile floor. Remove wallpaper from walls then paint walls. Replace wall and floor tile in shower closet. Construct shelves in area where tub was removed and an arch way entrance into the space. Will have to put in sub flooring where tub was installed. Change out or make present decorated window more weather resistant. Small amount of indirect lighting in the new shelving area and change out present lighting.

Project: Remodel or Renovate One or More Rooms
Location: Old Hickory, TN
Date: 02/2019
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Comment: I would like to get an estimate for

Project: Remodel a Kitchen
Location: Old Hickory, TN
Date: 02/2019
Floorplan: I am considering changes to kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: No - I do not plan to move or update the appliances
Countertops: Yes - I plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: No - I do not plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes

Project: Remodel a Bathroom
Location: Old Hickory, TN
Date: 02/2019
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Less than 2 months
Comment: Rental apartment that we own. Want to redo the bathroom. Existing tub is old cast iron with a stained surround. Want a new tub, surround or tile, faucets, vanity with sink and counter top. Tub is 58 inches long. Vanity is 24inches wide. Flooring should be updated while work is being done need this done as soon as possible.

Project: Remodel a Bathroom
Location: Old Hickory, TN
Date: 02/2019
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: Remove tub with jets but will not replace. Change out vanity and sinks. Replace tile floor. Remove wallpaper from walls then paint walls. Replace wall and floor tile in shower closet. Construct shelves in area where tub was removed and an arch way entrance into the space. Will have to put in sub flooring where tub was installed. Change out or make present decorated window more weather resistant. Small amount of indirect lighting in the new shelving area and change out present lighting.