Compare Quotes from up to 3 Pros

Addition & Remodeling Contractors in Silver Spring, MD

Where do you need Addition & Remodeling Contractors?


Deals Tag = Deals
Compare quotes with a single request

Let our ProFinder technology instantly match you to the perfect pros for your project.

(443) 692-8172
10 Davis Drive Timonium, MD 21093
Serving Silver Spring
Not only does Galaxie Home provide one-on-one project management and unmatched customer service, ...
See More
(703) 340-2061
17704 Georgia Avenue Olney, MD 20832
Serving Silver Spring
Orbe Construction is a family-owned and operated general contractor in Olney, Maryland. Since 1994, ...
See More
(240) 339-8316
8003 Carroll Avenue Takoma Park, MD 20912
Serving Silver Spring
DaSilva General Contractor, LLC, is committed to excellence in every aspect of our business. We ...
See More
Find the Right Pro. Right Away.

Let our ProFinder technology instantly match you to the perfect pros for your project.

Showing 1-25 of 152
< Prev | 1 | 2 | 3 | 4 | 5 | 6 | 7 | Next >

Recent Job Requests for Additions & Remodeling Contractors in Silver Spring, MD


New Lead
Project: Remodel a Bathroom
Location: Silver Spring, MD
Date: 06/20/2018
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Less than 2 months
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: I live in an older home with a small bathroom connected to the main bedroom. I am looking to modernize the bathroom with a larger shower (if possible), updated flooring and new cabinets and toilet. I am also considering updating the bathtub which is not connected to the shower.

New Lead
Project: Remodel a Bathroom
Location: Silver Spring, MD
Date: 06/20/2018
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: Adding a shower to a half bath, relocating entry door

New Lead
Project: Build an Addition
Location: Silver Spring, MD
Date: 06/20/2018
Project Description: Design and build
Type of Addition: Ground level addition
Rooms Included:: Bedroom(s)
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Request for Commercial Location: No
Comment: I want to enlarge a room presently on the first level of my house. i want a mastersuite. It needs to be made larger to accommodate what I would like the mastersuite to look like. The room already has a bathroom with a shower; however, I would like it to have a walk in tub and double sinks. I would the room to include a large walk-in closet. I also want the room to have a laundry area to inlcude washer and dryer. The room has a door to an outside ramp which I want made/ replaced with a stone path to the front of the house and to extend around the room to the stone deck/patio in the back of the house. There is already a sliding door to the deck/patio now. I would still like that access. I am not sure if you do that work as well. I have a request for a quote for the stone decorator patio. If I can have it done all by one contractor that would be fine too.

New Lead
Project: Remodel a Bathroom
Location: Silver Spring, MD
Date: 06/20/2018
Extensiveness of Remodel: I plan to maintain existing bathroom floorplan
Shower / Bath: No - I will keep the existing shower or bath as is
Toilet: No - I will keep the existing toilet as is
Cabinets / Vanity: No - I do not plan to update the cabinets / vanity
Countertops: No - I do not plan to update the countertops
Sinks: No - I do not plan to update the sinks
Flooring: No - I do not plan to update the flooring
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: Primary concern is getting walls & ceiling sanded and repainted, and repairing/replacing missing/damaged tiles. Secondary concern might be replacing blinds, minor repairs to existing sink fixture, need to caulk/fill in areas between floor paneling and walls/tub, need threshold between hall carpet and bathroom floor panels.

New Lead
Project: Remodel a Kitchen
Location: Silver Spring, MD
Date: 06/20/2018
Floorplan: I am considering changes to kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: Yes - I plan to move or update some or all appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: Yes - I plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes
Comment: kitchen remodelling and living room flooring

New Lead
Project: Remodel a Kitchen
Location: Silver Spring, MD
Date: 06/19/2018
Floorplan: I am considering changes to kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: Yes - I plan to move or update some or all appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: Yes - I plan to update the lighting
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 months
What kind of location is this?: Home/Residence
Comment: Want lower end but durable cabinetry, high quality hardware. Probably want to restore wood floor underneath current flooring if possible

New Lead
Project: Renovate or Repair a Home
Location: Silver Spring, MD
Date: 06/19/2018
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence

New Lead
Project: Remodel a Kitchen
Location: Silver Spring, MD
Date: 06/19/2018
Floorplan: I am considering changes to kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: No - I do not plan to move or update the appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: Yes - I plan to update the lighting
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes
Comment: full remodel all except appliances

New Lead
Project: Remodel a Bathroom
Location: Silver Spring, MD
Date: 06/19/2018
Extensiveness of Remodel: I am considering changes to bathroom floorplan
Shower / Bath: Yes - I want to move or install a new shower or bath
Toilet: Yes - I will be replacing or moving the toilet
Cabinets / Vanity: Yes - I plan to update the cabinets / vanity
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Property Owner: Yes
Requires Work on Historical Structure: No
Covered by Insurance: No
Request for Commercial Location: No
Comment: full remodel replace everything

New Lead
Project: Remodel a Kitchen
Location: Silver Spring, MD
Date: 06/19/2018
Floorplan: I plan to maintain existing kitchen floorplan
Cabinets: Yes - I plan to move or update the cabinets
Appliances: No - I do not plan to move or update the appliances
Countertops: Yes - I plan to update the countertops
Sinks: Yes - I plan to update the sinks
Flooring: Yes - I plan to update the flooring
Lighting: Yes - I plan to update the lighting
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
What kind of location is this?: Home/Residence
Historical Work: No
Covered by Insurance: No
Property Owner: Yes
Comment: full remodel all except appliances