Top-rated excavation pros.

Get matched with top excavation pros in Hopkins, MN

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Excavation pros in Hopkins

Avatar for Clark Companies, Inc
Clark Companies, Inc
4.5(
103
)

Serving Hopkins, MN and surrounding areas

Approved

Super Service Award Winner

In business since 2015

Free estimates

Warranties offered

"I used Clark for a yard waste dumpster rental. Super timely and easy to work with. They let me keep the dumpster for an extended time to allow for time to work on the project. Would highly recommend."
NEW WALL
Huge Patio DONE!
Retaining wall
Double Boulder Wall
Commercial City Wall

+132

Response time1 day
276 neighbors recently requested a quote
Recommended by65%of homeowners
Avatar for Able Excavating LLC
Able Excavating LLC
5.0(
6
)

Serving Hopkins, MN and surrounding areas

In business since 2024

Free estimates

Emergency services offered

"I had Josh come take out a large swimming pool, it was a good size job removing everything and then filling it in and grading. Now I have a beautiful backyard.. Thank you"
Pool Demo
Pool Demo
Pool Demo
Pool Demo
Pool Demo

+24

Response time6 hrs
Recommended by83%of homeowners
Avatar for Plumbline Builders
Plumbline Builders
4.7(
109
)

Serving Hopkins, MN and surrounding areas

In business since 1987

Free estimates

"Roger and his team did a beautiful job on our project. It is hard to tell where the addition is versus the existing 100+ year old house. They matched trim and finishes and gave us a much more live-able space."
Exterior Before
Eagan Kitchen Remodel
Exterior Remodel/Addition
Exterior Before
Eagan Kitchen Remodel

+120

Recommended by94%of homeowners
Avatar for Creative Earthscapes, Inc
Creative Earthscapes, Inc
4.6(
28
)

Serving Hopkins, MN and surrounding areas

In business since 2008

Free estimates

Credit card accepted

"They did a wonderful job.
Everyone was so polite, knowledgable and hard workers!
A real pleasure to have at our home.
It was a difficult job because most of the plantings they removed were overgrown.
It was jungle.
The end result was just beautiful.
Josh was very helpful and did not mind when I changed things around la bit.
They even made time to mulch another area for me.
I would highly recommend them!
I hope to have them back next year to work on another area on the yard.


"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+26

Recommended by88%of homeowners
Avatar for Kurilla Contracting Company
Kurilla Contracting Company
4.6(
30
)

Serving Hopkins, MN and surrounding areas

In business since 2020

Free estimates

Credit card accepted

"Iâ m very pleased with the end results. Had a French drain installed & a retaining wall replaced with boulders. Tyler & Brad worked hard and were able to complete work in one day."
Baker Park
Demolition
Existing Structures
Demolition
Site work

+24

Response time2 days
Recommended by85%of homeowners
...
Showing 1-10 of 61

FAQs for excavation projects in Hopkins, MN

Depth depends on the type of installation and the regulations in your area. Water supply lines typically require 24 inches, while drainage pipes are often installed 36 inches below grade. For most general projects, a depth of 12 to 24 inches and a width of about eight inches is sufficient. Sticking to these specs keeps your utilities safe, code-compliant, and easier to maintain later.

When you need to run utilities underground, you’ve got two main options: boring or trenching. Boring employs directional drilling to install utilities without exposing a continuous channel, while trenching requires excavating an open channel to place utilities securely. Directional drilling preserves landscape integrity, whereas trenching provides direct access for installation, albeit with greater surface disruption. This clear comparison helps you select the method best suited to your project.

Plan on 12 hours to dig 100 linear feet when the soil is cooperative and you can work continuously. This timeframe applies when work is performed consistently and methodically. Factors such as rocky soil, tree roots, obstructions, and frozen ground increase the overall duration, demanding extra planning and effort. Comprehensive operational planning ensures that every challenge is managed efficiently and the project is completed on schedule.

If you want your yard to look untouched, laying fresh sod over the trench is the quickest fix. New sod needs 30 to 45 days to root and blend with the rest of your lawn. A local sod pro can provide you with a firm timeline and tips to ensure the grass takes hold and maintains your curb appeal.

The Hopkins, MN homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.