Top-rated attic remodelers.

Get matched with top attic remodelers in Aurora, IL

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Attic remodelers in Aurora

Avatar for Sentri Homes

Sentri Homes

New on HomeAdvisorNew on HomeAdvisor
Approved Pro

Sentri Homes

New on HomeAdvisorNew on HomeAdvisor
Approved Pro
1702 local quotes requested
2 years of experience

Sentri Homes is a full-service contractor delivering high-end home additions, whole-home remodels, new custom builds, luxury kitchens, structural framing, roof replacements, and every major renovation. We assign a dedicated project manager to every job, deliver meticulous craftsmanship with clear communication, and back our work with an industry-leading warranty to ensure complete peace of mind on your largest investments. Our in-house team of licensed builders and master craftsmen consistently earns 5-star reviews by turning big visions into stunning, high-value homes—when you need one trusted partner who truly does it all, we’re the proven choice.

Sentri Homes is a full-service contractor delivering high-end home additions, whole-home remodels, new custom builds, luxury kitchens, structural framing, roof replacements, and every major renovation. We assign a dedicated project manager to every job, deliver meticulous craftsmanship with clear communication, and back our work with an industry-leading warranty to ensure complete peace of mind on your largest investments. Our in-house team of licensed builders and master craftsmen consistently earns 5-star reviews by turning big visions into stunning, high-value homes—when you need one trusted partner who truly does it all, we’re the proven choice.


AVEA Inc.

5.00(
3
)

AVEA Inc.

5.00(
3
)
Customers say: Quick response
Recommended by 100% of Angi customers
Recommended by 100% of HomeAdvisor customers

AVEA is a Home Automation and Security Alarm Contractor specializing in Control4 automation systems and Honeywell intrusion systems.

AVEA is a Home Automation and Security Alarm Contractor specializing in Control4 automation systems and Honeywell intrusion systems.


cba architecture & consulting LLC

No reviews yet

cba architecture & consulting LLC

No reviews yet
16 years of experience

Architectural and Interior Design Services

Architectural and Interior Design Services


Eichele and Valene Remodeling

2.25(
4
)

Eichele and Valene Remodeling

2.25(
4
)
Customers say: Terrific value
13 years of experience

Service is our priority! We build our company on quality and good service. Let us know how we can help meet your renovation needs!

"Ed Eichele has stated to us that he stands by his work and that he will do whatever it takes, that they are accommodating, open and transparent. Beware, Ed knows all the right things to say, just don’t believe any of it. Following are the issues we had with Eichele & Valene Remodeling: • Needed to hire a second contractor to rip out and replace our newly installed tile floor and takeover our project. • Had to remove and replace wood trim • Paint quality grade with option of 2 brands stipulated in our contract was not followed. An untrue story was given as to why a cheaper grade had to be used. • Promises of a building permit and an inspector appointment never materialized (3 months). After blaming the City of Wheaton building department for an unexplainable lack of action it turned out that the city never received payment for the permit we paid Eichele & Valene to execute as part of the contract. • Our walls were painted and floor installed before the plumbing and electrical work had been started let alone the drywall being finished. Our second crew took advantage of the floor being exposed to perform plumbing and electrical work by removing floor boards vs. access through the basement ceiling as was planned by John Valene. • Lack of a consistent work schedule; multiple no-shows without warning. • They still owe us money per their own records. Details: Tile – Through research of manufacturer’s websites, the Tile Council of North America, and consulting with a member of National Tile Contractors Association, we were able to confirm that the tile floor was laid improperly and needed to be 100% replaced. Some of the installation related issues: Our warranty for the subfloor and the tile was void due to the use of cheap drywall screws used to fasten the Durock subfloor rather than the required “1-1/4" USG Durock™ Brand Tile Backer Screws for wood framing (or equivalent) or 1-1/2" hot-dipped galvanized roofing nails”. As a result of improper installation, there was so much unevenness and lippage all over the floor that we were tripping while walking on the tile. Nothing sat squarely or level on it. The lippage of many tiles was the same thickness as a quarter or thicker. (See photos) Trim – We upgraded our family room from carpet to tile. It may not be obvious to all homeowners that the baseboards are installed prior to installing carpet, thus touching the floor that the padding and carpet are rolled over. For tile, the baseboards should be installed on top of tile, which put the baseboards noticeably higher on the wall. Since the baseboards were never removed prior to installing the tile the end result was a family room with oddly short baseboards as they did not sit on the tile where it should be if installed correctly. Furthermore, the staining and varnishing of the shoes was dreadful. Application of conditioner, stain and urethane was performed outside in 40 degree weather all within 6 hours. Per the Sherwin Williams website one needs to, “Let dry completely (usually 24 hours)”. In addition, the site states that one should; “Apply stain only at the proper temperature. For most stains, 70 degrees Fahrenheit is the optimum, with the safety range from 50 to 90 Fahrenheit.” The worst part about this baseboard fiasco was the calculated deception exercised where the eating area meets the family room. They removed baseboard from the eating area where it was installed at the correct height for tile to rip ¾” off of the bottom in order to match the height of the baseboard of the family room which was at the correct height for carpet. (See photo) Paint – We believe that painting before the drywall, plumbing, and electrical work were finished was a tactic employed to give us the illusion of progress after weeks of no work being performed. It was an obvious ploy to distract us from the fact that no progress had been made in weeks. We have since had to repaint all surfaces but 3 walls. Windows – There is an entire fiasco with regard to undersized windows being installed. The additional framing required to install windows that were too small led to the threat of additional “Change Order” costs. One might question why someone would install the wrong size windows. Menards remade the incorrectly sized windows as ordering the wrong size windows was their mistake. Eichele & Valene told us that we owed them the cost of a second installation even though they should have stopped when they realized that the windows were the wrong size. (See photo)"

Tom M on February 2019

Service is our priority! We build our company on quality and good service. Let us know how we can help meet your renovation needs!

"Ed Eichele has stated to us that he stands by his work and that he will do whatever it takes, that they are accommodating, open and transparent. Beware, Ed knows all the right things to say, just don’t believe any of it. Following are the issues we had with Eichele & Valene Remodeling: • Needed to hire a second contractor to rip out and replace our newly installed tile floor and takeover our project. • Had to remove and replace wood trim • Paint quality grade with option of 2 brands stipulated in our contract was not followed. An untrue story was given as to why a cheaper grade had to be used. • Promises of a building permit and an inspector appointment never materialized (3 months). After blaming the City of Wheaton building department for an unexplainable lack of action it turned out that the city never received payment for the permit we paid Eichele & Valene to execute as part of the contract. • Our walls were painted and floor installed before the plumbing and electrical work had been started let alone the drywall being finished. Our second crew took advantage of the floor being exposed to perform plumbing and electrical work by removing floor boards vs. access through the basement ceiling as was planned by John Valene. • Lack of a consistent work schedule; multiple no-shows without warning. • They still owe us money per their own records. Details: Tile – Through research of manufacturer’s websites, the Tile Council of North America, and consulting with a member of National Tile Contractors Association, we were able to confirm that the tile floor was laid improperly and needed to be 100% replaced. Some of the installation related issues: Our warranty for the subfloor and the tile was void due to the use of cheap drywall screws used to fasten the Durock subfloor rather than the required “1-1/4" USG Durock™ Brand Tile Backer Screws for wood framing (or equivalent) or 1-1/2" hot-dipped galvanized roofing nails”. As a result of improper installation, there was so much unevenness and lippage all over the floor that we were tripping while walking on the tile. Nothing sat squarely or level on it. The lippage of many tiles was the same thickness as a quarter or thicker. (See photos) Trim – We upgraded our family room from carpet to tile. It may not be obvious to all homeowners that the baseboards are installed prior to installing carpet, thus touching the floor that the padding and carpet are rolled over. For tile, the baseboards should be installed on top of tile, which put the baseboards noticeably higher on the wall. Since the baseboards were never removed prior to installing the tile the end result was a family room with oddly short baseboards as they did not sit on the tile where it should be if installed correctly. Furthermore, the staining and varnishing of the shoes was dreadful. Application of conditioner, stain and urethane was performed outside in 40 degree weather all within 6 hours. Per the Sherwin Williams website one needs to, “Let dry completely (usually 24 hours)”. In addition, the site states that one should; “Apply stain only at the proper temperature. For most stains, 70 degrees Fahrenheit is the optimum, with the safety range from 50 to 90 Fahrenheit.” The worst part about this baseboard fiasco was the calculated deception exercised where the eating area meets the family room. They removed baseboard from the eating area where it was installed at the correct height for tile to rip ¾” off of the bottom in order to match the height of the baseboard of the family room which was at the correct height for carpet. (See photo) Paint – We believe that painting before the drywall, plumbing, and electrical work were finished was a tactic employed to give us the illusion of progress after weeks of no work being performed. It was an obvious ploy to distract us from the fact that no progress had been made in weeks. We have since had to repaint all surfaces but 3 walls. Windows – There is an entire fiasco with regard to undersized windows being installed. The additional framing required to install windows that were too small led to the threat of additional “Change Order” costs. One might question why someone would install the wrong size windows. Menards remade the incorrectly sized windows as ordering the wrong size windows was their mistake. Eichele & Valene told us that we owed them the cost of a second installation even though they should have stopped when they realized that the windows were the wrong size. (See photo)"

Tom M on February 2019


DSP Chicago REMODELING

No reviews yet

DSP Chicago REMODELING

No reviews yet
20 years of experience

Established in 2005, we put our 11 years of experience to work wowing and inspiring our clients with thoughtful design and attention to detail. We focus on exceeding expectations every step of the way.

Established in 2005, we put our 11 years of experience to work wowing and inspiring our clients with thoughtful design and attention to detail. We focus on exceeding expectations every step of the way.


Affordable Services

5.00(
2
)

Affordable Services

5.00(
2
)
Customers say: Quick response
Recommended by 100% of Angi customers
Recommended by 100% of HomeAdvisor customers

Affordable Services works with you through the entire project, from the initial idea to the finished result. We are a family owned and operated company that has relied on referrals from our satisfied customers for over 30 years. Give us a call if you need commercial and residential electrical, plumbing, heating & ac, carpentry, room additions, renovation services. We offer a 10% discount for Seniors & Veterans. Affordable Services accepts all major credit cards.

Affordable Services works with you through the entire project, from the initial idea to the finished result. We are a family owned and operated company that has relied on referrals from our satisfied customers for over 30 years. Give us a call if you need commercial and residential electrical, plumbing, heating & ac, carpentry, room additions, renovation services. We offer a 10% discount for Seniors & Veterans. Affordable Services accepts all major credit cards.


Orban Construction

5.00(
2
)

Orban Construction

5.00(
2
)
Customers say: Quick response
Recommended by 100% of Angi customers
Recommended by 100% of HomeAdvisor customers

1 employee. Uses subs. Charges determined by the job. No travel charges apply.

1 employee. Uses subs. Charges determined by the job. No travel charges apply.


ESTMAN HOME IMPROVEMENT

No reviews yet

ESTMAN HOME IMPROVEMENT

No reviews yet
25 years of experience

4 EMPLOYEES. NO SUBS. COST IS DETERMINED BY THE JOB. NO TRAVEL CHARGES.

4 EMPLOYEES. NO SUBS. COST IS DETERMINED BY THE JOB. NO TRAVEL CHARGES.


ARMSTRONG PAINTING SERVICES

4.25(
4
)

ARMSTRONG PAINTING SERVICES

4.25(
4
)
Customers say: Super punctual
Recommended by 100% of Angi customers
Recommended by 100% of HomeAdvisor customers
"Great work by Tim Armstrong at my new apartment. Tim recommended paint and other tips for quality at a reasonable value, was very communicative, and was extremely efficient. The work was excellent and made my new place feel like home. Pricing was very competitive."

Rachel S on October 2023

"Great work by Tim Armstrong at my new apartment. Tim recommended paint and other tips for quality at a reasonable value, was very communicative, and was extremely efficient. The work was excellent and made my new place feel like home. Pricing was very competitive."

Rachel S on October 2023


Dream Team Builders

1.00(
1
)

Dream Team Builders

1.00(
1
)
25 years of experience

My business has be around for 20 years and my company does quality work.

My business has be around for 20 years and my company does quality work.

...
Showing 1-10 of 1008
FAQs for attic remodeling projects in Aurora, IL

A loft conversion turns your unused attic or loft into a functional living space, like a bedroom or home office. Adding walls, ceilings, lighting, and even plumbing seamlessly integrates the new room with the rest of your home. It's a practical way to expand your living area and boost your property's value.

A loft is a finished and integrated living space created by converting an attic, while an attic is an isolated, unfinished area under the roof. The loft conversion process installs proper walls, ceilings, and utilities, transforming the space into a usable room that adds value to the home. In contrast, an attic remains largely unmodified and is typically reserved for storage.

Planning permission is required for a loft conversion because the project alters the structure and must meet strict building codes. A building permit, costing between $500 and $3,000, and mechanical permits, costing between $10 and $500 each, are mandatory. This regulatory process ensures safety, adherence to design standards, and the home's overall integrity during conversion.

A loft conversion takes several weeks because the project involves multiple phases, from design to finishing. The process requires careful planning, obtaining permits, executing structural changes, installing utilities, and completing final decorative work to ensure the converted area meets building codes and the homeowner’s requirements.

Choosing an alternative project instead of a loft conversion can be advantageous when a less complex project's return on investment is higher. Homeowners may opt for improvements like upgrading doors, windows, or adding a deck because these projects demand lower overall costs and fewer structural changes. Such alternatives can enhance home value and functionality with a more streamlined process.

The Aurora, IL homeowners’ guide to attic remodelings

From average costs to expert advice, get all the answers you need to get your job done.