Top-rated basement remodelers.

Get matched with top basement remodelers in Boiling Springs, SC

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Basement remodelers in Boiling Springs

Avatar for Cransten
Cransten
4.4(
100
)

Serving Boiling Springs, SC and surrounding areas

Angi Approved

Super Service Award Winner

In business since 2016

Free estimates

Emergency services offered

"Seemed very nice on the phone but when I went to hire them I would of had to wait almost 6 to 8 weeks because they were totally booked out. So figured they must really have a great business just was sorry i couldn't wait."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+18

Response time1 day
Response rate98%
5 neighbors recently requested a quote
Avatar for E&A construction service
E&A construction service
5.0(
11
)

Serving Boiling Springs, SC and surrounding areas

Angi Approved

In business since 2019

Free estimates

Warranties offered

"I can't say enough great things about Edgar and Adam and their crew! They've done a few jobs for us over the years, including an extensive deck remodel and other complicated construction projects, and their craftsmanship is immaculate. Communication is always open and they kept us informed every step of the way. Very, very highly recommended."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+19

5 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Bradley Construction LLC
Bradley Construction LLC
4.6(
272
)

Serving Boiling Springs, SC and surrounding areas

Angi Approved

In business since 2009

Free estimates

Warranties offered

"We hired Bradley Construction LLC to complete our basement renovation. The renovation entailed adding a laundry room, full bathroom, framing the basement, and everything that goes along with that. We worked through the design with Terry Bradley, Kim Bradley, and a couple of their subcontractors to get everything just right. This design and quoting process was smooth and ensured everyone was aligned. Once the project kicked off we worked with Kim Bradley as Project Manager. Kim is extremely thorough, dedicated, and was our biggest ally through the project. Kim ensured that all the subcontractors showed up as needed to keep the project on schedule and that everyone completed their work per the plan and at a high level. During the project a couple mistakes were made and without fail Kim picked up the phone and immediately made things right. Kim, Terry, Brian, Glen, and all the folks at Bradley have been a pleasure to work with. It's refreshing to find a true trustworthy professional."
JET TUB
JET TUB INSTALL ON DECK
JETTUB ROUGHIN
JET TUB BEFORE
BEDROOM BEFORE

+53

Response time2 days
25 neighbors recently requested a quote
Recommended by90%of homeowners
Avatar for BRG Construction & Remodeling
BRG Construction & Remodeling
4.6(
10
)

Serving Boiling Springs, SC and surrounding areas

Angi Approved

In business since 2021

Free estimates

Emergency services offered

"Had a tub that cracked and needed replacement. Contacted BRG and got a budget quote that day. Work was completed within the week at reasonable price. Excellent work by the team that did the job. "
Handyman Services Project
Handymen Project
Handyman Services Project
Handyman Services Project
Handyman Services Project

+44

Response time2 days
1 neighbors recently requested a quote
Recommended by80%of homeowners
Avatar for New Wave Builders
New Wave Builders
5.0(
3
)

Serving Boiling Springs, SC and surrounding areas

Angi Approved

In business since 2019

Credit card accepted

Customers say: Quick response

"It went great. They are very punctual and professional. The work quality is good and I would recommend them to anybody. They showed up when they said that they would."
Extensive damage to the laundry room and exterior walls and roofing.
New custom cabinets, quartz countertops, engineered hardwood flooring, recessed lighting, fixtures and appliances were installed.
Interior of the living room after demolition
Tree damaged attic
Front of the house after the fire

+46

Response time2 days
2 neighbors recently requested a quote
Recommended by100%of homeowners
FERCO
4.6(
146
)

Serving Boiling Springs, SC and surrounding areas

In business since 1977

Free estimates

Warranties offered

"Absolutely criminal…he charged us a large amount of money to replace a deck, and over the course of 4 weeks his crew deconstructed and then tried to reconstruct our deck THREE times, each time failing to do it correctly. He used mismatched materials and his crew has obviously never built a deck before, though he claimed they had built “more than 30”. Stay away at all costs! Now we are having to hire a professional company to completely start over from scratch with all new material, and the project is costing us almost triple what it should have."
Recommended by89%of homeowners
...
Showing 1-10 of 149
FAQs for basement remodeling projects in Boiling Springs, SC

Finishing a basement turns unused square footage into livable space and returns up to 70% of what you spend when you sell your home. Beyond that resale boost, you gain a playroom, home office, or guest suite you can start enjoying right away. That mix of daily comfort and solid return on investment (ROI) makes basement finishing one of the smartest upgrades you can tackle.

In some parts of the country—especially lots on swamps, high water tables, or other wetlands—local codes prohibit basements. Saturated soil puts constant pressure on foundation walls and lets water seep in faster than any sump pump can handle. 

If your property sits on waterlogged ground, building on a slab or crawl space is often safer, more affordable, and code-compliant.

Most basements wrap up in four to eight weeks. Framing takes three to five days, with electrical and plumbing rough-ins following over the next week. Add five days for drywall, two to three for flooring, and another week for paint, trim, and punch-list items. 

Delays can happen if materials run late or your contractor’s calendar is packed, so build in a little cushion when you plan.

Whether a finished basement counts toward your home’s official square footage depends on local rules. Many areas only include below-grade space if it has code-approved egress, fully finished walls, ceilings, and floors, plus consistent heating. 

Check with your local assessor or building department before you start; meeting those standards can affect taxes, appraisals, and resale value.

Building codes require a checklist: dedicated heat and electrical service, a code-approved stairway, and at least one egress window or exterior door. Walls, ceilings, and floors must be fully finished and meet insulation, ventilation, and fire-separation standards. If you add a bedroom, you’ll also need a closet, proper clearances, and safe exits. If you change the layout later, be ready to update the space so every new room still meets today’s code.

The Boiling Springs, SC homeowners’ guide to basement remodelings

From average costs to expert advice, get all the answers you need to get your job done.