
Serving Clinton, MD and surrounding areas
In business since 2005
"RRR did a high-end hall bath remodel in Sep 2020 for approximately $24000. Homeowners did the basic design and material selection. RRR suggested construction and material mods, as needed, and ordered all material. Cost was clearly detailed up front, paid on draw, and was met by completion date. All stage work and inspections were completed on schedule, over approximately three weeks. Crew was always on time and worked full days, while Ryan checked in twice a week. All rough-in and finish work was neat and well crafted, including studding, plumbing, electrical, wall and floor tile, and vanity top and basin, and painting. There was some struggle with heavy shower doors assembly and clean install. All punchlist items were complete with no issues. Enjoyed interaction with Ryan and his crew. Very happy with results. Competitive pricing. Would highly recommend."





+93






























