Top-rated wood or fiber cement siding installation or complete replacement pros.

Get matched with top wood or fiber cement siding installation or complete replacement pros in Norman, IN

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Wood or fiber cement siding installation or complete replacement pros in Norman

Avatar for Atlantic Siding
Atlantic Siding
5.0(
10
)

Serving Norman, IN and surrounding areas

In business since 1994

Free estimates

Emergency services offered

"Jack did an amazing job in extremely challenging conditions. It was a big project and we were impressed with his continued attention to detail, thoroughness and professionalism. Turned out even better than we had anticipated."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+1

Recommended by100%of homeowners
Avatar for Legacy Window & Door LLC
Legacy Window & Door LLC
4.1(
151
)

Serving Norman, IN and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"After receiving a few other estimates on a sunroom addition plus a screened in porch, we decided to go with Legacy Windows. Mark’s estimate was in the middle of the other estimates and he offered much more flexibility than the other companies we spoke to in terms of customization. He is a great salesman with previous marketing experience. We signed our contract on April 10th. We were told that Mark and his crew were finishing a room and would be able to start in 2-3 weeks with a timeframe of 6-8 weeks for completion of our room addition project. The budget and timeframe worked well for us, so we decided to add replacement windows for the rest of our house (11 windows total). Several weeks went by and our project had not yet started so we followed up with Mark. We were told that there were issues with his current project (did not pass inspection) and it would push our start date back due to the workmanship repairs. During this time period before any work began on our project we would communicate often with Mark to check on the status of our project. The really frustrating thing about working with Mark is his inability to fulfill commitments he would make to us in regards to project timing and when things would be done. Our primary communication with him was via text messages and time after time he would tell us, “we should be starting next week” or “we are going to be making up for lost time quickly” and time would pass and it just wouldn’t happen. Work on our project began when our existing windows were replaced in early June. The foundation for the expansion was finally started in late June and framing started in early July (roughly 3 months after signing the contract). The first crew completed the framing, hired the shingles out, installed some of the cedar siding, and installed one wall of windows. We were seeing decent progress after having such a long wait in the beginning, all the while the commitment issue just kept popping up. We would get a text saying something like, “going to be at the house tomorrow with some stone samples” and he wouldn’t show up. It was annoying, but progress was being made and we were happy with how the expansion was taking shape so we were willing to overlook it. Sometime toward the beginning of August (roughly 4 months after signing the contract), work just stopped. Again, when we would reach out to Mark asking about the status of our project we would be told, “I’ll have an action plan later this afternoon” or “we want to get everything we done we can this week” or “the crew will be there tomorrow and we will be working all week on your project trying to finish”. In the meantime, nothing would be done and we would repeat the process. This went on for over 3 weeks, during this time there was absolutely no work done. Large piles of construction trash and building materials sat in our yard during this time. A great deal of the usable wood began to warp and I am sure that ultimately materials had to be tossed from being left in the elements for so long. After a couple weeks I finally moved a significant portion of the usable wood up onto the deck so it would at least be partially protected. We found out that there was an issue with the electrical and Mark had decided to let Crew #1 go as they were not meeting his expectations, but it was not communicated to us until the end of the over 3 week period. A second crew then arrived who Mark said usually only did work for him on the south side of Indy (we live in Lebanon), but he wanted to get our project back on track. There seemed to be little to no communication between the crew and Mark on what they were supposed to work on so we had to explain to them what was in the contract to be completed. Crew #2 also started making good progress, they finished the cedar siding, got the rest of the windows installed in the sunroom as well as installing the sunroom ceiling. About this time, which was at the beginning of September we had a separate crew come out to do the drywall. Mark recommended them very highly. As it turned out, the drywall was not properly installed or insulated (in some walls there was no insulation), and ultimately it had to be taken down and redone by Crew #2. Crew #2 seemed to be doing a really good job and we were quite pleased with their progress and the quality of work they were doing for us. They were replaced by Crew #3 sometime in mid-September. We were never told why they were replaced, but Crew #3 was much closer to where we lived so I assume that had something to do with it. Much like when Crew #2 started, there seemed to be little communication between Crew #3 and Mark on what they were supposed to work on. So we again had to explain what was in the contract to be completed. All through the process, the commitment issues mentioned previously continued. We were not as happy with the quality of the work done by Crew #3 as we had been by Crew #2 (or even Crew #1), but they did finally complete for the project for us and after (3) failed attempts we finally received a pass from the building inspector on his final inspection. When Crew #3 decided they were finished they never came back, we communicated multiple times with Mark about the remaining punch list items to no avail and ultimately decided to finish most of the small punch list items ourselves instead of waiting any longer for them to finish (clean up, sanding / finishing drywall, etc.). We love the way the sunroom and covered porch area turned out. From contract signing until the end it took a little over six months, but in Mark’s defense he did agree to let us add a brand new window in the dining room of our house to tie everything together at no cost to us as appreciation for our patience. There are things that we liked about Mark’s company and things we didn’t, I have tried to summarize each category as follows: Positives • Price seemed reasonable • It is truly a custom build, no problem with changes we had at any point • Love the way it turned out, looks amazing • Mark seemed to genuinely care about the quality of the product he was delivering to us (he replaced the cedar shakes that had been installed by Crew #1 because he wasn’t happy with the quality Negatives • Our project seldom felt like it was a priority, part of the reason it took so long was because they were over committed on other projects • Commitment Issues (addressed previously) • Construction Trash left in our yard for months • We cleaned up inside more than they did, I understand drywall work is messy. They never swept up any of the dust and they didn’t clean up any of the clumps of dried drywall mud all over the floor. • We finished some of the minor punch list items, just to be done."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+70

Recommended by84%of homeowners
Avatar for Help Restoration Inc.
Help Restoration Inc.
5.0(
12
)

Serving Norman, IN and surrounding areas

In business since 2014

Free estimates

Emergency services offered

"We are brand new to the Bloomington area, and Help Restoration Inc came to us highly recommended by our seasoned realtor. We trusted his suggestion, and are so glad we went with Ernie and the crew at Help Restoration. The process for getting our new roof and gutters installed was easy and painless (even a little enjoyable thanks to Ernie's expert input and great sample books to choose from!). Ernie and the crew were willing to talk us through the process and address any questions or concerns we had, and I would highly recommend their service."
Recommended by100%of homeowners
Avatar for Hoosier Permanent Coatings
Hoosier Permanent Coatings
4.4(
130
)

Serving Norman, IN and surrounding areas

In business since 2003

Free estimates

Credit card accepted

"The first time it was $21,000, then we had them do some additional...they gave us an estimate, I think of around $6000 and honestly we haven't paid them because they haven't finished. They seemed very professional. I thought they would do an excellent job. They could match our color scheme. This is in a company that is warranted, life time paint, never have to paint again and if we do, we'll come out time and time again to do it. So the idea was great and we had been having to paint the brand new home every year. We were tired of that and they seemed like they could do a great job and the product seemed very good. We had them paint it the first time and we had room additions added and they painted that. It seemed very good and very professional. They painted some things that they shouldn't have like the windows, so it is hard to close them. Overall they did a decent job but then the last time they came out to do some repair work, they actually did some construction in addition to the painting and then they didn't match the paint colors correctly. They didn't finish the repair work, where they thought they might have finished it, it wasn't as it was before architecturally, aesthetically pleasing anymore. I had a punch out list and I said, this is all the punch out list that needs to be addressed. They said something about, okay they'll take care of it but they never scheduled a time or place to review the punch out list or to schedule to get them fixed. We have been calling and they've not been returning our calls. We thought they were out of business actually. Then last year all of our windows sills rotted and again, with the paint that wouldn't have happened. We replaced all of our windows. The window company actually reached out to Hoosier Permanent Coatings  and they are still in business as you probably found them in your system. They said well because we didn't pay them that last amount our, warranty is null and void. So we've been trying to call them, we leave messages and they don't call us back. If we talked to them maybe this thing can be settled."
Br. before
Br. after
B. after
B. before
Bu. before

+27

Recommended by88%of homeowners
Avatar for NHGC Contracting LLC
NHGC Contracting LLC
5.0(
5
)

Serving Norman, IN and surrounding areas

In business since 2007

Free estimates

Emergency services offered

"NHGC was prompt, courteous. It was a small job, which is sometimes hard to get some to bother with. They took care of it in two days after their first inspection, which was great with family coming soon for the holidays. Could not tell in advance how bad the damage was until ceiling opened up, but they came in under budget."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+39

Recommended by100%of homeowners
Showing 1-10 of 38
FAQs for wood or fiber cement siding installation or complete replacement projects in Norman, IN

Yes, removing your existing siding before installing new cedar siding is essential for a secure and long-lasting installation. It helps eliminate hazards like rot and pest infestations and ensures a smooth surface for the new siding. Leaving old siding in place can compromise the appearance and integrity of your new cedar siding. Engaging a licensed siding contractor will ensure proper removal and preparation.

To determine how much cedar siding you'll need, start by measuring the height and width of each exterior wall of your home to calculate the area. For gable ends, measure from the base to the peak. Add up all these areas and then add an extra 10% to account for waste and future repairs. This ensures you purchase enough siding without running short.

Cedar siding endures between 20 and 40 years if maintained correctly from the start. This lifespan is secured by performing regular inspections for cracks, fungus, and bubbling and by pursuing consistent cleaning, painting, or staining with an appropriate sealant. Engaging a professional for periodic inspections ensures that your siding remains resilient and visually appealing for decades.

Your cedar siding must be maintained every three to five years through a thorough restaining or repainting process to preserve its strength and appearance. Regular maintenance prevents damage and ensures that the wood remains in peak condition. For homeowners seeking a less demanding upkeep schedule, choosing vinyl or aluminum siding offers a more resilient alternative while still providing exceptional style.

The Norman, IN homeowners’ guide to wood or fiber cement siding installations or complete replacements

From average costs to expert advice, get all the answers you need to get your job done.