Top-rated major renovation multiple room pros.

Get matched with top major renovation multiple room pros in Wilsons Mills, NC

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Top-Rated Major renovation multiple room pros in Wilsons Mills - Updated Nov 2026

Avatar for ooommee llc
ooommee llc
4.9(
62
)
Major Renovation - Multiple Rooms

Serving Wilsons Mills, NC and surrounding areas

Approved

In business since 2007

Warranties offered

Credit card accepted

"I got my kitchen cabinets repainted. I love the job and my new kitchen cabinet look. I also needed a new electric plug installed. All the task that I ask are done in a timely manner. I would definitely use for any projects that may come up."
Bunnlevel, NC Deck Restoration
Sanford, NC Deck Refurbish
Rocky Mount, NC Trex Deck Refresh
sunroom
Bunnlevel, NC Deck Restoration

+326

Response time2 days
Response rate100%
1 neighbors recently requested a quote
Avatar for Leon Home Repairs
Leon Home Repairs
4.4(
640
)
Major Renovation - Multiple Rooms

Serving Wilsons Mills, NC and surrounding areas

Approved

In business since 2001

Free estimates

Emergency services offered

"About five years ago, I had Chris and his team install a French door and vinyl tile in my kitchen and dining room. I was very impressed with the professionalism and skill of the team... always on time and exceptional job. Recently, I asked Chris to give me an estimate on a small repair job. Again , he was extremely helpful. I recommended Leon to my sister and my nephew and they were very satisfied with his work."
Bathroom remodel
Bathroom remodel
Bathroom remodel
Bathroom remodel
Response time2 days
1 neighbors recently requested a quote
Recommended by87%of homeowners
My Blessing LLC
4.0(
3
)
Major Renovation - Multiple Rooms

Serving Wilsons Mills, NC and surrounding areas

Approved

My Blessing LLC offers kitchen and bathroom remodeling, interior and exterior painting, sheetrock, laminate flooring, carpentry, and door and window finishing services in Ayden, NC.\n\nWe serve in Ayden, NC, Grifton Township NC; Winterville Town NC; Grimesland Township NC; Farmville Town NC; Chicod Township NC; and the surrounding areas.\n\nRemodeling Services, Remodeling Company , Remodeling Contractor, Professional Remodeling, Home Remodeling Services\nSheetrock Service, Laminated Flooring\n\nFor more information visit our website: remodeleraydennc.com

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+10

Response time2 days
Response rate99%
1 neighbors recently requested a quote
Avatar for King of Clean-KOC
King of Clean-KOC
4.8(
257
)
Major Renovation - Multiple Rooms

Serving Wilsons Mills, NC and surrounding areas

"Hector and team did a great job cleaning the stains off my roof. In the process, he alerted my just prior to starting cleaning that my gutters were clogged. I had them cleaned shortly prior, but he texted me multiple pictures from the roof that clearly showed the need to clean them again (love the use of technology real time!). We quickly agreed a gutter cleaning cost and he proceeded to do both in a very professional manner. Also cleaned up thoroughly afterwards. Would use again - he takes pride in his work."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+24

Recommended by96%of homeowners
Avatar for Granite Transformations of Raleigh-Durham
Granite Transformations of Raleigh-Durham
4.6(
106
)
Major Renovation - Multiple Rooms

Serving Wilsons Mills, NC and surrounding areas

In business since 2005

Free estimates

Credit card accepted

"We unfortunately experienced a number of problems and communications issues throughout the process with Granite Transformations, and as a result the job experienced several delays.  It seemed like a situation where if something could go wrong, it did in more cases than not.   However in the end, it means a lot that the owners of GT recognized the issues, stood behind their business, and worked hard to earn our satisfaction. GT requests payments at time of signing the contract, and then at points during the process (e.g. cabinets installed, templates drawn, etc).  All who we spoke with at GT on the phone and those who performed work in our home were professional. The end result is a quality product, but the journey to get there was not expected.
Here is a chronology of events:
- Fri August 16th: a GT salesman came to our home with vanity cabinet and surface samples, outlined how the process worked, and we signed a contract to replace Master Bath Vanity Cabinet and Double-sink Top, and reface Half Bath Vanity Cabinet front as well as replace its Single-sink Top. Three new faucets were also included. GT to handle all plumbing hookups.  GT gave us access to an electrical contractor. The saleman explained that work would not begin until all materials were ready to go. At that point GT would install the new Master Bath cabinet, reface the Half Bath cabinet front, and do a template for both tops.  2-3 days after that, the tops and sinks would be installed, then the faucets hooked up.
- Fri October 4th: GT had called end of Sept to let us know all materials were in.  Upon the installers arriving at our house, GT let us know there was a mixup and the Master Bath cabinet had not yet come in.  So GT refaced the Half Bath cabinet.  However upon completion it was resurfaced in a White color rather than the Cherry color we had selected.
- Mon October 21st: GT removed the existing Master Bath cabinet, capped the plumbing, and installed the new cabinet. The Half-bath cabinet was refaced with the correct Cherry color.  Templates were drawn up to make the tops.
- Fri October 25th: GT was to install the Vanity Tops in both baths, however called the evening of Thurs Oct 24th to inform us that workers had dropped and broke the Master Bath top so it would need to be remade.  The composite used for the top was out of stock locally, so would have to be ordered.  With the Master Bath vanity out of commission since the plumbing was capped, we decided to leave the half-bath as is and have GT install the top in the half-bath when the Master Bath top was ready.
- Mon October 28th: The Electrical contractor completed the electrical work scheduled for the Master Bath.  His work was excellent, and price was very reasonable.
- Fri November 8th:  GT installed the Master Bath Vanity Top, Sinks, and Faucets.  This was about Three Weeks after GT had installed the new cabinet there and capped the plumbing.  GT installed the Half Bath Vanity Top, Sink, and Faucet. GT requested full remaining payment at this point, however since both of us were not available to inspect the work, we asked to pay the next day at their store which GT said was acceptable.
- Sat November 9th:  Upon waking up, we were greeted with water on the Master Bath floor, leaking from one of the sinks. Also, upon comparing both Master and Half Bath vanity tops to the samples we had in our possession, we discovered neither top matched its respective sample.  We had travel plans for the weekend, however due to the leak one of us stayed home. we called the plumber (Mr Water Heater, who we found out is owned by the local GT company) and learned they only work Mon-Fri 8-5ish and do not have emergency service.  Upon calling the GT store after it opened, I was told I may need to wait until Monday to have the plumbing issue looked at.  Given the various issues experienced, and the new leak, I asked to have the GT owner call me to discuss the issues.  Jonathan Lamb, GT co-owner called me, and as a result agreed to have a plumber resolve the leak over the weekend (which was done), and then work with us the following week on the other issues.
- Fri November 15th:  Mel Lamb, GT co-owner, came out to our house to inspect the sink top matches to the samples, and the overall experience we had.  He agreed they did not match what we were shown when we signed the contract. We decided to leave the Master Bath alone at this point since the colors worked fine, but Mel offered to replace the Vanity top in the Half Bath at no cost to us, and we accepted as the combination in there did not look right.  We also discussed the other issues.  Mel was not aware of the leak in the Master Bath the previous Saturday, but reassured us that he was aware things on this project did not go right, and that he was there to make things right. Mel made a trip back to the store to get new samples, and we selected from those for the new half bath top. He also offered a final discount on our remaining payment.
- Mon November 25th: Half bath top and sink were reinstalled, and faucet hooked up.  Final payment made in full.
So in summary, the jobs were completed about 15 weeks after the contract was signed, and about 7 weeks after work was started. During the course of our work, we dealt with about a dozen different people including office staff, installers, plumbers, salesman, co-owners, etc. and generally had to bridge communications among them... in our view it would have helped had a single project focal point been assigned.  We were surprised that after signing the contract with our salesman, that we never heard from him again during the project or as part of completing the project.  We also experienced that on several occasions work was not completed correctly on the first attempt which led to reschedules, delays, canceled plans, adhock needs, etc which was inefficient to both GT and the customer.  The local GT seems to be growing, and perhaps these are growing pains as a result of expanding their business.  Hopefully our experience will help bring some changes to the GT process and communications that will help other customers, and help us, should we do business again with GT further down the road.
"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+7

Recommended by93%of homeowners
Avatar for Gary The Handyman
Gary The Handyman
4.4(
245
)
Major Renovation - Multiple Rooms

Serving Wilsons Mills, NC and surrounding areas

In business since 1988

Free estimates

Credit card accepted

"We recently purchased our 10-year old house in Wake Forest and had a list of minor deficiencies the house inspector had discovered during the due diligence period.  We were looking for a handyman to work off these tasks when Gary's special deal popped up.  Since Gary already had very positive reviews on Angie's List, we decided this was too good of a deal to pass up.  Since most of the work was outside caulking and painting and involved some time on the roof, we needed a good weather day to schedule the work.  Our first attempt was rescheduled due to a 3-day rain storm that hit during the first scheduled day and precluded the outside work.  Chris was our handyman and showed up at 9 am on the rescheduled day and promptly got to work after I showed him the items to accomplish.  He did an excellent job and accomplished all the tasks within the 8 hours.  Since we had about an hour left of his time, he asked if there was anything else he could do, so we asked him to tear out the shelves in a hall closet we are converting to a wine closet.  The only additional cost I incurred was about $12 for caulk which I supplied.  We have other items we need to address in the future and we will definitely call on Gary the Handyman again and attempt to get Chris.
"
Additional Photos
Recommended by85%of homeowners
Avatar for Divine Design & Remodeling
Divine Design & Remodeling
4.7(
18
)
Major Renovation - Multiple Rooms

Serving Wilsons Mills, NC and surrounding areas

In business since 2001

Free estimates

Credit card accepted

"Things we liked: 1. Detailed contracting and pre-work planning, with detailed materials and labor estimates. 2. Provided evidence of license and insurance. 3. Excellent design, excellent materials, and precise construction of high-quality custom cabinetry and other wood work, including under-cabinet LED lighting, and fireplace mantle. 4. Negotiated with vendor to get good price and extended warranties included in the cost of all new kitchen appliances. 5. Nice installation of tile floors in kitchen, bathroom, and laundry room. 6. Excellent installation of stacked limestone panels floor to ceiling on a high angled wall around the fireplace, plus very attractive custom-made wood mantle, and new tiles on the hearth. 7. Worked effectively with vendor on design, purchase, and installation of premium granite countertops and trim, and kitchen and bathroom sinks. 8. Installation of premium plumbing fixtures in bathrooms and kitchen, no leaks apparent. 9. Well-done side job of installing two new steps, small landing, and wood screen door with dog flap on the deck. 10. Very cooperative about several minor design and installation changes along the way, with acceptable cost changes. 11. Contractor was on-site nearly every weekday and on many weekends. 12. Contractor is friendly, polite, considerate, and very aware he is working in someone’s home. Things that disappointed us: 1. No advance communication on one-week delay in starting the job. 2. Time estimates. We were told at least 3 weeks in a row that he would be done “next week.” Job actually took twice as long (about 15 weeks) as the original time estimate (6-8 weeks). We can allow one extra week for the changes and add-ons we asked for, but not double for the entire job. 3. Erratic attendance of assistants on the job appeared to contribute to significant delays. 4. Delegated cabinet finishing (staining and water-repellent top coats) to assistant, whose work had to be re-done in multiple places and still detracts from otherwise beautiful wood work. 5. Trim work is absent where cabinet panels meet hardwood floor, leaves what we consider a very unattractive gap. 6. Installation of wall tiles. The tile vendor did not tell us the tiles we picked for floors and shower walls were not for walls; the contractor had a hard time making them stay on the walls. I suggested changing wall tiles but contractor assured us that he could cut and install to get the look we wanted; tiles had to be cut, installed, torn off, and re-installed; were held onto concrete backer board with nails until cement dried, putting holes in the backer board behind the grout lines; tiles cut at angle for exposed corners were ragged and retained grout unevenly, and there was no accommodation for corners, so after the job was done we ordered and installed plastic corner guards with silicone (total cost of materials and shipping approx. $125) to cover unattractive and sharp tile edges. I estimate that installation of shower wall tiles alone took 2 weeks, maybe more. For the kitchen backsplash, smaller tiles were used and installed well, but there was no accommodation for where backsplash would transition to drywall, so tiles at drywall had edges exposed; we ordered edge pieces off-contract from a home improvement store, contractor installed them. It appeared to us that the contractor did not plan for tile corners and transitions. 8. Drywall and paint work. Drywall around arch that widened a doorway was not taped, and contraction of the mud has created a crack around the arch. Drywall work where lights and ceiling fans were moved and/or installed is lumpy and visible; one place on the ceiling was not finished and the supporting mesh is obvious right on the surface. Paint where the ceiling paint meets the shower wall tile grout is on the grout and cannot be scrubbed off and in our opinion will need to be covered by crown molding to make appearance acceptable to us, something we did not plan. Other places where wall tile meets drywall show evidence of damage to the drywall surface (e.g., surface paper torn off) that was not repaired, so it is uneven and lumpy. Bathroom was to be repainted, but not all trim was repainted, including a window that was caulked with colored caulk on white paint. The wall with the arch and the kitchen walls involved in wall cabinet installation were only partially repainted with the same color but different roller texture can be seen; the whole walls must be re-painted for uniform appearance. 9. Organization and worksite management. Our homeowner association informed us that neighbors grew impatient with the construction trailer and trash in the driveway, which were present from mid-November to early March. In general, we were unhappy with protection of the work site. Garage floor and wood steps have sizeable spots of paint and stain. Hardwood floors in the highest-traffic area were protected with cardboard only after we insisted on it, and then there were still paint cans and tools stored directly on the dining room hardwood floor. Stain cans were routinely left uncovered overnight. New tile floors and granite countertops were not protected from subsequent cabinet staining, so we did a lot of post-construction removal of paint, stain, glue, etc., from tiles and expensive granite that could have been protected, even with newspaper and masking tape. Grout haze was left on new tile for at least a week and then was incompletely removed; we spent several days scrubbing it off with white vinegar. Two manuals for new appliances were lost. Job proceeded in a sequence that was hard for us to understand or predict, perhaps depending on when assistants were available (a guess?), so there was little completed and usable across three rooms for more than three months. 10. Contract oversight/business management. Extended warranties for kitchen appliances (refrigerator, gas range, microwave oven, dishwasher) were supposed to be part of the package cost but the invoice the contractor presented to us did not include extended warranties on two of the four; I contacted the vendor, purchased the two warranties by credit card, and backed this cost out of the contract. Contractor deviated from the contract’s payment schedule, asking for unscheduled early payments to cover labor costs. Contract called for all invoices for materials to be presented; most were not. We presented an extensive punch list toward the end of the job, which we added to as we found things that needed to be corrected. We found at least one or two items that he crossed off but were not done. 11. Complete lack of follow up. This is a serious problem to us, given our financial and time investment. Before and during the job, we communicated well by text message and email. Since he finished on March 2, I have contacted him 5 times to request a time we could meet and talk about issues described here; he responded quickly to the first two messages saying he would get back to me, but didn’t, and he has not responded at all to the last three attempts to contact him since April 8. The contract has an arbitration requirement, but the contractor used his home address as his business address but moved during the job, and we do not have a mailing address for him, so we are unsure how to invoke arbitration. I contacted a handyman service on Angie’s List to get an estimate to correct several items described above; this estimate is $1,350 on top of the cost of the renovations in general. This review will stand until the contractor contacts me and corrects what we consider to be deficiencies. I will consider an update if he does. Overall grade: C. I would not use again."
Decks
Baths
Trim
Additional Photos
Additional Photos

+2

Recommended by84%of homeowners
Avatar for Design Home Renovations (DHR)
Design Home Renovations (DHR)
4.8(
10
)
Major Renovation - Multiple Rooms

Serving Wilsons Mills, NC and surrounding areas

In business since 1996

Credit card accepted

"It went very well!!! Dana ran this as a turnkey operation. I left many of the design details to her. This is a family business with Dana’s husband Rex leading the installation. Within minutes of returning to the MLS, I had a contract on the townhouse for full price. The agent had been checking in on the progress of the remodel and was impressed with the work being done. My real estate agent also checked in and was pleased. I could not be happier with what they accomplished in a short amount of time. Dana was a “godsend” to me."
Recommended by90%of homeowners
...
Showing 1-10 of 138
FAQs for major renovation multiple room service projects in Wilsons Mills, NC

Gutting a house involves completely removing outdated elements, including drywall, insulation, and fixtures, to reveal the underlying structure. This process is not only ideal for a complete remodel but is also critical in emergency situations such as flood damage where compromised materials must be replaced immediately. Contractors follow OSHA-approved safety measures throughout the demolition to ensure a secure work environment. This method provides a fresh, safe canvas for any future renovation.

Gutting a house is a cost-efficient choice. Home renovations cost between $20,000 and $88,000 compared to the cost to build a new house of $122,500 to $411,500. The reduced cost stems from retaining the existing structural framework while updating the interior. Factors such as house size, material quality, and labor directly influence the total expenses, making a gut renovation a financially smart decision.

The cost of demoing an interior is worthwhile because gutting a house creates a completely safe and refreshed environment by removing toxic or damaged materials like asbestos, mold, and deteriorated components. Professional supervision ensures all hazards are properly managed and health and safety standards are met. This process revitalizes the home's interior and can increase its structural integrity and overall value.

Remodeling a bathroom costs between $6,640 and $17,600, with high-end remodels exceeding $30,000. The final price is directly influenced by the quality of fixtures and design features—modern tiling, advanced plumbing, and custom details all add to the definitive expense. By selecting superior materials and design elements, homeowners ensure both functionality and a remarkable aesthetic upgrade.

Kitchen renovations range from $14,500 to $41,500 when the original layout is maintained. However, changing the layout by removing load-bearing walls or upgrading to premium appliances directly escalates costs, often adding over $1,000 per modification. These precise enhancements reflect the high-quality standards and result in a transformative and efficient upgrade.

A full gut renovation typically spans between four months and a year and a half. This period accounts for the permitting process, material procurement, and the overall scale of the project. Every phase—from demolition through rebuilding—involves careful planning and execution to meet deadlines while ensuring the work adheres to safety and quality standards.

The Wilsons Mills, NC homeowners’ guide to major renovation multiple room services

From average costs to expert advice, get all the answers you need to get your job done.