Top-rated addition and remodeling pros.

Get matched with top addition and remodeling pros in Willow, AK

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Addition and remodeling pros in Willow

Avatar for Chugiak Restoration & Custom Tile
Chugiak Restoration & Custom Tile
4.5(
42
)

Serving Willow, AK and surrounding areas

Approved

In business since 2009

Free estimates

Warranties offered

"Stacy and Joe did an outstanding job of remodeling our bathrooms including two beautifully tiled floors. They were punctual, professional at all times, and clearly expert at what they do. Stacy also painted a bedroom that included California closet shelving. He provided us with a detailed quote at the beginning of the project, which was both reasonable and accurate. I would highly recommend Chugiak Restoration & Custom Tile for any type of remodeling especially tile work."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+293

4 neighbors recently requested a quote
Recommended by96%of homeowners
Happy Valley Construction & Design
5.0(
7
)

Serving Willow, AK and surrounding areas

Approved

In business since 1980

Free estimates

Offers commercial services

"I’ve had this company do a huge home remodel, a condo remodel, hot tub install, mother-in-law dwelling remodel and a number of other projects. My absolute “go to” for anything. Never found a problem that couldn’t be solved. I’ve recommended them to friends who all have done remodels, small jobs and even a rebuild after a fire. Ask them for my reference and call me directly if you want. I can’t say enough good about Butch and his folks. Superb!!"
4 neighbors recently requested a quote
Recommended by42%of homeowners
Avatar for Crestone General LLC
Crestone General LLC
4.7(
23
)

Serving Willow, AK and surrounding areas

In business since 2006

"I contacted Jim Burke of Crestone about making a small repair to the 2nd floor deck of my house. After checking more thoroughly it was found there were a number of boards with significant decay. Many of the boards were so bad, there was nothing to hold a screw or nail. The small repair I had in mind would have left the deck dangerous, still not meeting building codes, and would have staved off replacement by only a year or two. Steve, the project manager, made suggestions that resulted in a more through repair and when a glitch was discovered part way though, a modification was made that resulted in an even stronger better looking finished product. Over 30+ years I worked over-seeing a variety of contractors who did every imaginable aspect of construction and maintenance work on the large office building I managed. The scope of the projects varied from adding or removing a door or two to adding 5,000, 10,000, and 20,000 square foot, two story additions to the building. The Crestone workers were as good or better than any I worked with. The workers showed up promptly every day, stayed on the job, and completed it without delay. Once they worked all day in a driving rain. They stayed on the job continually and took only a short lunch break. The workers thoroughly cleaned up at the end of every day and hauled away debris. In recent years I have wondered how projects get completed as the new acceptable standard appears to be that workers talk and text on their cell phones throughout the workday and take frequent smoke breaks. I saw Crestone’s employees making or taking a phone call only once or twice during the 6 day period and never saw an employee smoking a cigarette. The Crestone labor rate is based on 100% productivity the entire work day without an inefficiency factor for cigarette breaks, talking and texting on cell phones, or breaking and wasting time talking among themselves. The deck looks better and is stronger than when it was originally built in 1991. It looks 100% better than my simple repair would have produced. The shaky, wobbly stairs and rail are now very solid. I highly recommend Creston General for any home or construction job and will call them first for any work I may need to have accomplished."
Recommended by94%of homeowners
...
Showing 1-10 of 70

FAQs for addition and remodeling projects in Willow, AK

The proper sequence of a kitchen installation starts with laying the foundation and structural framework. From there, you need to establish utilities like plumbing, wiring, and gas lines, then install cabinetry and countertops, and finally finish with flooring, painting, tile backsplashes, and lighting. A professional kitchen installation contractor can coordinate each component of your project to minimize the timeline and maximize resources.

The Willow, AK homeowners’ guide to addition and remodeling services

From average costs to expert advice, get all the answers you need to get your job done.