Top-rated bathtub installers and replacers.

Get matched with top bathtub installers and replacers in Boaz, AL

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Bathtub installers and replacers in Boaz

Avatar for Dream Baths Of Alabama
Dream Baths Of Alabama
4.1(
74
)

Serving Boaz, AL and surrounding areas

In business since 1992

Free estimates

"Great.  I had this work done just over a year ago (should have submitted review sooner).
Estimate.  Charlie examined bathroom, had plenty of samples of options to review, and provided firm fixed quote.  There were some material issues that I'll note below.  At no time did the final cost change.
Timeline.  Installation began about a month or so after I accepted the quote and paid half down for material.  I think Charile was ready in about 2 weeks, but I had business travel.  Working together to find a common acceptable period for installation was easy.
Installation.  The first day Charlie showed up with a crew of 4 to take care of the electrical work (did have another ceiling fan installed) and demolition.  Following that, there were 2 full time workers on site.  They worked long hours, well over 8 hour days.  Normall, the job would have taken about a week.  I'll give more detail on the one issue below that drew the task out longer.  The guys were good about taking care not to impact the rest of the house (carpet, etc.).  After install, they did a good job cleaning up.
During the install, there were a few minor options ... how to frame the door, orientation of tile, the color of the tile, etc.  The crew provided options and good advice (I'm no kind of interior decorator).  The part of the service was excellent.
Quality.  I have done basic carpentry and electrical work.  I believe the quality of the work to be good to excellent, both what you see and what was done "behind the dry wall."  The work that you can see is excellent.
Material.  I was a little worried about the material used for the walls as opposed to tile.  I'm pleased to say I'm more than happy with the "acrylic" (I think that's correct) walls as well as base and door.
Only issue.  The base received was not the correct one.  The second base received had a quality issue.  They guys pointed this out to me.  I'm sure it cost them money out of their pocket / profit to spend the extra time on site.  My take away from this was the guys were MY quality advocates and did what was necessary to ensure the highest quality product was used and the job was done right the first time!  Things happen.  The question is how well does your contractor support you.  While I wasn't crazy about the delay (about 3 days, not major for me).  I was thrilled the issue was immediately brought to my attention and resolved even though it took extra effort on their part.
Overall job outcome.  I feel what was quoted was provided.  Very satisfied.
1 year review ... I remain satisfied.  I have had zero issues.  Other than the glass doors (which are famous for requiring cleaning when used for bath doors - this was noted before installation).  Is the biggest maintenance job.  Caring for the bath itself has required average to minimal effort.
Give Dream Bath / Charlie a call before you have your bathroom remodeled!
"
Dream Baths

+15

Recommended by82%of homeowners
Complete Home Repair
4.9(
38
)

Serving Boaz, AL and surrounding areas

In business since 1995

Free estimates

"Mr. Webb came out to do my estimate quickly after my initial request. I had some odd jobs around my house that I have been meaning to take care of. He charged me a flat, per day amount that I thought was very reasonable. I ordered the columns that needed to be replaced in front of my house and he told me that his crew would pick everything up from the store on the way over to do the work.
It was the easiest process I have ever experienced with a service provider. He told me when they would be out, which was about 2 weeks from my initial contact ? very quick, in my opinion.  I also didn't even need to be home since everything was outside that needed to be repaired.  When I got home from work everything was complete and looked so good.  I was also provided all of the receipts for anything they had to go out and buy to finish the job, which I really appreciated.  The only not positive thing for me is that I wish I would have had an idea of how long each job would take.  When I got home early that day to check the progress, they were already finished.  There were a couple other minimal things I could have had them do (replace two lighting fixtures outside) if I would have known the time for completion on the other jobs would not take a full day, since I was paying a per-day rate.  However, as I?ve said, the rate was very reasonable, so I wasn?t too worried about it. 
Overall, it was a very positive experience.  I already know that I will use them again for a later project and have recommended them to others. 


"
luxury
warmth
durable
Recommended by93%of homeowners
Avatar for michael davis contracting
michael davis contracting
5.0(
7
)

Serving Boaz, AL and surrounding areas

In business since 2022

Free estimates

Emergency services offered

We specialize in handyman services, home repairs, remodeling, lawn maintenance and more! We guarantee your satisfaction, and we won’t leave until the job is done right. We pride ourselves on the quality work we provide, while delivering great customer service! Check out all the services we offer below and call -or- click to schedule a free estimate today!

Old
Remodeling - General Project
New
Remodeling - General Project
Additional Photos

+3

Recommended by100%of homeowners
Avatar for Foundation Repairs & Home Improvements Inc
Foundation Repairs & Home Improvements Inc
4.6(
63
)

Serving Boaz, AL and surrounding areas

In business since 1972

Free estimates

Credit card accepted

"The initial visit was thorough and explained all problems. Two different estimates were emailed to us, one for the bracing and one for possible pier placement in one corner. We emailed the contract for the braces and within days, measurements were taken. The next week, a crew of three bolted the braces in place and caulked the stress cracks. All of our questions were answered completely and in language we could understand. The workers were efficient, friendly and helpful. They moved two large shelving units away from the wall and then returned them to their original positions. They also moved some other heavy items we could not move by ourselves and replaced them. We are extremely pleased with the work and the price was reasonable (they were here all day). If placing piers is necessary, they will definitely be the people we call to do the work. They even gave us some tubes of brick pointing material to use on the outside of the house where water had worn away the mortar. HIGHLY RECOMMEND!
"
Before
After
After
Additional Photos
Additional Photos

+20

Recommended by91%of homeowners
Showing 1-10 of 40
FAQs for bathtub installation and replacement projects in Boaz, AL

Most tubs last an average of 20 years, or closer to 10 to 15 if they’re acrylic or fiberglass. If you’re seeing persistent leaks, cracks, stubborn stains, or mold that won’t scrub away, it’s time to start shopping for a replacement. Out-of-date features and visible water damage are other red flags. Swapping the tub now protects your bathroom from bigger (and pricier) repairs down the road.

You should install your tub in a location that complements your bathroom's layout, plumbing connections, and personal preferences. Consider placing it near existing plumbing to minimize installation costs. Many homeowners position their tubs to take advantage of natural light or scenic outdoor views, enhancing relaxation. 

Ensure there's sufficient space around the tub for easy access and safety, especially if accessibility is a concern. Ultimately, the ideal spot is where the tub fits seamlessly with your bathroom design and provides the most comfort and convenience for your needs.

Replacing a bathtub takes just one or two days if you hire a pro to handle the job. They'll remove the old tub and install the new one efficiently. If you're considering doing it yourself, be prepared for it to take much longer, possibly up to a month. That's because you'll need to remove the old tub and drywall, install the new tub, repair the walls, and maybe tackle new tiling. Weigh the time commitment against potential cost savings to decide what's best for you.

Converting your tub to a shower transforms your bathroom with a modern and accessible design. The average cost to convert a tub to a shower ranges from $2,000 to $10,500, based on the required plumbing, tiling, and structural modifications. This upgrade maximizes space while boosting functionality and aesthetics in your bathroom.

The Boaz, AL homeowners’ guide to bathtub installations and replacements

From average costs to expert advice, get all the answers you need to get your job done.