Serving Bridgeville, PA and surrounding areas
In business since 1993
"Bob and his team worked very efficiently and professionally. And were always friendly and gave me great instructions and information during and after the semi remodel. The start of the project began with the electrician who installed the new vent/light for the shower and also corrected the electricity for an outlet(that was extra), Bob and his team then came in to do the tear out of the water damaged walls surrounding the tub down to the studs. The plumber was then scheduled to install the new anti scald plumbing after which the crew was back to refinish the tub from pink to white and then install new insulation, waterproof drywall and the new tub surround. I did purchase a new vanity and lighting for the bathroom which Bob picked up the vanity for me from Lowe's. The last detail was his tile crew did a great job refitting the bathroom tile to meet the new tub surround. My home was never left a mess, everyday they cleaned up after themselves and were usually always on time. This all took approximately 5 days. I am very happy with the results.
"






































