Top-rated basement remodelers.

Get matched with top basement remodelers in Chugiak, AK

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Basement remodelers in Chugiak

Avatar for 84th Street Construction
84th Street Construction
4.4(
23
)

Serving Chugiak, AK and surrounding areas

Approved

In business since 2007

Warranties offered

Small jobs welcome

"I am a repeat customer, first they replaced all may windows and sliding glass doors with all triple pane - AWESOME job! They just fixed my upstairs 2nd floor exterior deck supports - main boards that went into house under outer wood panels had started to dry rot - very dangerous, replaced deck supports, outer panel, painted everything to match exterior paint and I'm a very happy camper! Just like a plumber, mechanic or even a dentist, a great contractor you can depend on is a treasure! Won't go wrong with 84th Street Construction!"
Living Room With A View
Finished Exterior
Front Door
Master Bath Jetted Tub
Master Bath Walk-in Shower

+25

Response time2 days
1 neighbors recently requested a quote
Recommended by100%of homeowners
Happy Valley Construction & Design
5.0(
7
)

Serving Chugiak, AK and surrounding areas

Approved

In business since 1980

Free estimates

Offers commercial services

"I’ve had this company do a huge home remodel, a condo remodel, hot tub install, mother-in-law dwelling remodel and a number of other projects. My absolute “go to” for anything. Never found a problem that couldn’t be solved. I’ve recommended them to friends who all have done remodels, small jobs and even a rebuild after a fire. Ask them for my reference and call me directly if you want. I can’t say enough good about Butch and his folks. Superb!!"
3 neighbors recently requested a quote
Recommended by42%of homeowners
Avatar for GP Construction, LLC
GP Construction, LLC
4.2(
43
)

Serving Chugiak, AK and surrounding areas

In business since 2016

Free estimates

Credit card accepted

"We highly recommend GP Construction. Their customer service and work ethic is outstanding. All the guys who did work on our kitchen remodel were courteous, professional, knowledgeable and skilled. They cleaned everything up really well at the end of each day and were very considerate of our having to live among the construction. Marty was our project manager. He works hard to make sure everything is done to his high standards, and he is very patient with new ideas and changes. He is amazing! We will be using them for all future projects."
Kitchen Remodels
Kitchen Remodels
Kitchen Remodels
Kitchen Remodels
Kitchen Remodels

+20

Response time2 days
Recommended by87%of homeowners
...
Showing 1-10 of 67
FAQs for basement remodeling projects in Chugiak, AK

Finishing a basement turns unused square footage into livable space and returns up to 70% of what you spend when you sell your home. Beyond that resale boost, you gain a playroom, home office, or guest suite you can start enjoying right away. That mix of daily comfort and solid return on investment (ROI) makes basement finishing one of the smartest upgrades you can tackle.

In some parts of the country—especially lots on swamps, high water tables, or other wetlands—local codes prohibit basements. Saturated soil puts constant pressure on foundation walls and lets water seep in faster than any sump pump can handle. 

If your property sits on waterlogged ground, building on a slab or crawl space is often safer, more affordable, and code-compliant.

Most basements wrap up in four to eight weeks. Framing takes three to five days, with electrical and plumbing rough-ins following over the next week. Add five days for drywall, two to three for flooring, and another week for paint, trim, and punch-list items. 

Delays can happen if materials run late or your contractor’s calendar is packed, so build in a little cushion when you plan.

Whether a finished basement counts toward your home’s official square footage depends on local rules. Many areas only include below-grade space if it has code-approved egress, fully finished walls, ceilings, and floors, plus consistent heating. 

Check with your local assessor or building department before you start; meeting those standards can affect taxes, appraisals, and resale value.

Building codes require a checklist: dedicated heat and electrical service, a code-approved stairway, and at least one egress window or exterior door. Walls, ceilings, and floors must be fully finished and meet insulation, ventilation, and fire-separation standards. If you add a bedroom, you’ll also need a closet, proper clearances, and safe exits. If you change the layout later, be ready to update the space so every new room still meets today’s code.

The Chugiak, AK homeowners’ guide to basement remodelings

From average costs to expert advice, get all the answers you need to get your job done.