Top-rated new windows service pros.

Get matched with top new windows service pros in Dallas, TX

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find New windows service pros in Dallas

Dream services

No reviews yet

Dream services

No reviews yet
21 years of experience

We primarily offer trouble shooting and repair services in the plumbing and electrical field. We have 35 years of service experience, educated, insured. I enjoy what I do.

We primarily offer trouble shooting and repair services in the plumbing and electrical field. We have 35 years of service experience, educated, insured. I enjoy what I do.


A Plus General Contractors

5.00(
1
)

A Plus General Contractors

5.00(
1
)
Recommended by 100% of Angi customers
Recommended by 100% of HomeAdvisor customers

We are locally owned and operated. We are also an Insurance Claim Specialist. Serving customers since 1995.

We are locally owned and operated. We are also an Insurance Claim Specialist. Serving customers since 1995.


Integrity Home Solution

No reviews yet

Integrity Home Solution

No reviews yet
19 years of experience

WE SPECIALIZE in WINDOW & DOOR INSTALLS- Please call, email or text Jon Armbrust 214-535-0518 of INTEGRITY HOME SOLUTIONS LLC. Our prices start at: Interior doors $150 Exterior doors 32" & 36" $150 Patio doors French and Sliders $250 Windows $100

WE SPECIALIZE in WINDOW & DOOR INSTALLS- Please call, email or text Jon Armbrust 214-535-0518 of INTEGRITY HOME SOLUTIONS LLC. Our prices start at: Interior doors $150 Exterior doors 32" & 36" $150 Patio doors French and Sliders $250 Windows $100


Avatar for The Personal Touch Contractors LLC

The Personal Touch Contractors LLC

4.62(
175
)

The Personal Touch Contractors LLC

4.62(
175
)
Customers say: Terrific value
39 years of experience

We are skilled in a variety of interior and exterior construction trades so we know the best approach to solve your problem. Our Handyman service which includes just about everything is only $65 for the first hour and $75 per hour for all additional hours. plus materials. Don't forget to check out our specials deals .

"I set out a point by point Project Plan, agreed that I would supply and pay for all materials, reviewed the project plan with Willard and we agreed on a price. Although he said it may be as much as 2K more, I was prepared to deal with this when we got to the end of the agreed upon price. I paid over half the total amount up front as I trusted Willard having hired him for small jobs before. My family and I were leaving on vacation just after the first 1/2 week of work. Willard told me that he had to go see his sister, but his crew would be working while he was gone. We returned and nothing but the bathroom demo had been done. Willard returned and shortly thereafter started wanting more money. I was not happy with this and found out he had spent all the advance money I had given him and was now unable to pay the sub-contractors required to complete this work. His subcontractor showed up at my home to do the new shower I had scoped. At my home, we had this work, fixing 2 soffets and painting them, removing an old gas heater, capping off and fixing the tiles, refinishing the attic, hanging a new garage (interior steel) door, fixing a broken cabinet in my bathroom and re-sheet rocking a panel of wall in my bedroom that had been ruined by the prior owners. In that week, his tile guy built out my shower and it was lovely. The glass doors were not in when he was done so he said he would do this himself. One of Willards guys did the soffet work and painted and it also was done well. In the attic they used a leaf blower to move the insulation around to be able to lay the boarding. There was an argument over how this should be done which I would not get involved in. They finished the attic. The insulation was not put back in place or under the boarding, so now the hallway under this area is hot as all heck during the summer. My husband is going to have to go back and take out the boards put the insultation under them and then reattach the boarding. Willard hung the steel door, but had not cut out the area in the door frame to install the deadbolt. They went back to my other house as it was critical and way behind schedule. His tile guy wanted me to pay him directly, which I did as Willard had no money to do so and had told him I would pay him. So for all the work I listed to be done at my house. The door still has no deadbolt installed, the wall in my bedroom and the drawer in my bath were not done, the glass enclosure is in my garage in a box, Back to the other house: Willard had me meet him at Home Depot one morning to rent the stripper to refinish the wood floors and we had a heated discussion as he was still talking about not having money, and I told him he would just wind up working other jobs and doing mine when he had time, if he didn't leave me completely in the lurch and I was not happy with that. At that time we were already at the second deadline he had given me and the only things done were the demo'd bathroom, the plumbing for the shower and tub install (which I had to pay the plumber directly to accomplish), the interior painting (again which I had to pay the guy directly to get done), carpentry work on the outside of the house (which was and is still not painted), 3 steel interior doors hung (done and working), All fixtures in the house which I had purchased new (still in boxes), the countertop in the kitchen (still waiting), installing the toilets, vanities, mirrors, etc in the bathrooms (still in demo condition on both counts). AFter yet more weeks and weeks of this ****, I told him ENOUGH, i"m done. I called the locksmith and changed the locks. Funny thing, all those days he said he would go to my house and never worked, or showed up late. He showed up early to make sure he could get his tools out of the house. I will never, ever hire Willard for anything again!"

Lisa K on September 2018

We are skilled in a variety of interior and exterior construction trades so we know the best approach to solve your problem. Our Handyman service which includes just about everything is only $65 for the first hour and $75 per hour for all additional hours. plus materials. Don't forget to check out our specials deals .

"I set out a point by point Project Plan, agreed that I would supply and pay for all materials, reviewed the project plan with Willard and we agreed on a price. Although he said it may be as much as 2K more, I was prepared to deal with this when we got to the end of the agreed upon price. I paid over half the total amount up front as I trusted Willard having hired him for small jobs before. My family and I were leaving on vacation just after the first 1/2 week of work. Willard told me that he had to go see his sister, but his crew would be working while he was gone. We returned and nothing but the bathroom demo had been done. Willard returned and shortly thereafter started wanting more money. I was not happy with this and found out he had spent all the advance money I had given him and was now unable to pay the sub-contractors required to complete this work. His subcontractor showed up at my home to do the new shower I had scoped. At my home, we had this work, fixing 2 soffets and painting them, removing an old gas heater, capping off and fixing the tiles, refinishing the attic, hanging a new garage (interior steel) door, fixing a broken cabinet in my bathroom and re-sheet rocking a panel of wall in my bedroom that had been ruined by the prior owners. In that week, his tile guy built out my shower and it was lovely. The glass doors were not in when he was done so he said he would do this himself. One of Willards guys did the soffet work and painted and it also was done well. In the attic they used a leaf blower to move the insulation around to be able to lay the boarding. There was an argument over how this should be done which I would not get involved in. They finished the attic. The insulation was not put back in place or under the boarding, so now the hallway under this area is hot as all heck during the summer. My husband is going to have to go back and take out the boards put the insultation under them and then reattach the boarding. Willard hung the steel door, but had not cut out the area in the door frame to install the deadbolt. They went back to my other house as it was critical and way behind schedule. His tile guy wanted me to pay him directly, which I did as Willard had no money to do so and had told him I would pay him. So for all the work I listed to be done at my house. The door still has no deadbolt installed, the wall in my bedroom and the drawer in my bath were not done, the glass enclosure is in my garage in a box, Back to the other house: Willard had me meet him at Home Depot one morning to rent the stripper to refinish the wood floors and we had a heated discussion as he was still talking about not having money, and I told him he would just wind up working other jobs and doing mine when he had time, if he didn't leave me completely in the lurch and I was not happy with that. At that time we were already at the second deadline he had given me and the only things done were the demo'd bathroom, the plumbing for the shower and tub install (which I had to pay the plumber directly to accomplish), the interior painting (again which I had to pay the guy directly to get done), carpentry work on the outside of the house (which was and is still not painted), 3 steel interior doors hung (done and working), All fixtures in the house which I had purchased new (still in boxes), the countertop in the kitchen (still waiting), installing the toilets, vanities, mirrors, etc in the bathrooms (still in demo condition on both counts). AFter yet more weeks and weeks of this ****, I told him ENOUGH, i"m done. I called the locksmith and changed the locks. Funny thing, all those days he said he would go to my house and never worked, or showed up late. He showed up early to make sure he could get his tools out of the house. I will never, ever hire Willard for anything again!"

Lisa K on September 2018


M&M CONSTRUCTION

No reviews yet

M&M CONSTRUCTION

No reviews yet
Emergency services offered

Hello maintenance man at ready I have a lot of experienced icing up apartment homes doing repairs also fixing up appliances trouble shooting your central air running diagnostics working on electrical plumbing landscaping

Hello maintenance man at ready I have a lot of experienced icing up apartment homes doing repairs also fixing up appliances trouble shooting your central air running diagnostics working on electrical plumbing landscaping


Avatar for ABC Seamless Of North Texas

ABC Seamless Of North Texas

5.00(
1
)

ABC Seamless Of North Texas

5.00(
1
)
Customers say: Quick response
Recommended by 100% of Angi customers
Recommended by 100% of HomeAdvisor customers

Seamless Steel Siding, Seamless Gutters, Windows, Doors, All Kinds of Roofing and Remodeling!

Seamless Steel Siding, Seamless Gutters, Windows, Doors, All Kinds of Roofing and Remodeling!


Avatar for Rain Leak Doctors

Rain Leak Doctors

5.00(
8
)

Rain Leak Doctors

5.00(
8
)
Customers say: Quick response
Recommended by 100% of Angi customers
Recommended by 100% of HomeAdvisor customers

We are a owned and operated partnership, who takes pride in their work and look to grow clientele based off of quality and craftsmanship. All work provided is backed by warranty. Free Estimates

We are a owned and operated partnership, who takes pride in their work and look to grow clientele based off of quality and craftsmanship. All work provided is backed by warranty. Free Estimates


Guerins A & G Enterprises, LLC

5.00(
1
)

Guerins A & G Enterprises, LLC

5.00(
1
)
Customers say: Quick response
Recommended by 100% of Angi customers
Recommended by 100% of HomeAdvisor customers

DBA: A & G ENTERPRISES. SP is a member of NARI and BBB Accredited Member

DBA: A & G ENTERPRISES. SP is a member of NARI and BBB Accredited Member


Benz affordable contracting llc

No reviews yet

Benz affordable contracting llc

No reviews yet

Mikes's Remodeling

No reviews yet

Mikes's Remodeling

No reviews yet
50 years of experience

Mike has been in the remodeling business for 37 years. Mikes son-in-law has come on board with the family business, the company has 4 employees & all work is done professionally & on time. Jobs are invoiced and paid upon completion. Call us today for a FREE ESTIMATE!!

Mike has been in the remodeling business for 37 years. Mikes son-in-law has come on board with the family business, the company has 4 employees & all work is done professionally & on time. Jobs are invoiced and paid upon completion. Call us today for a FREE ESTIMATE!!

...
Showing 1-10 of 1041
FAQs for new windows service projects in Dallas, TX

Yes, bay windows add value to a home. They enhance the property by expanding the interior space and flooding rooms with natural light. Their unique three-panel design creates a stunning focal point that elevates curb appeal and modernizes living areas. This architectural detail increases both functional space and visual appeal, directly contributing to higher home resale value.

Yes, all window types have the potential to become part of a bay window configuration when modified correctly. The transformation involves reconfiguring standard windows into a multi-panel design that features a larger central window flanked by smaller ones. This process requires precise professional planning and custom framing to ensure durability, visual balance, and structural integrity.

Bay windows typically consist of three glass panels extending beyond the home's exterior walls, with a larger center panel flanked by two smaller ones. In contrast, bow windows are composed of four to six equally sized glass panels that create a gentle curve and do not extend as far from the exterior walls.

Bay windows cost more than standard windows because their expansive, multi-panel design requires additional materials and skilled labor. Their construction involves extra glass, specialized frame components that extend outward, and complex operating mechanisms. These technical demands necessitate precise engineering and multiple expert installations, thereby significantly increasing both material and labor expenses.

Bay windows cost three times more than standard double-hung windows because their design requires extra panels, expanded framing, and a more complex installation process. The advanced construction method increases material consumption and demands comprehensive expertise, while specialized window treatments further elevate expenses. This all results in a significant difference in overall project cost.

The Dallas, TX homeowners’ guide to new windows services

From average costs to expert advice, get all the answers you need to get your job done.