Top-rated basement remodelers.

Get matched with top basement remodelers in Timber, OR

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Basement remodelers in Timber

Avatar for Behome Remodeling
Behome Remodeling
4.9(
7
)
Basement - Remodel

Serving Timber, OR and surrounding areas

Approved

In business since 2025

Free estimates

Credit card accepted

"Reuben was the nicest guy I met with and will keep his number for future jobs. This company does everything small or whole home remodeling. I was impressed by his knowledge and spirit."
Response time1 day
Response rate100%
350 neighbors recently requested a quote
Avatar for 3POINT3R CONSTRUCTION LLC
3POINT3R CONSTRUCTION LLC
5.0(
6
)
Basement - Remodel

Serving Timber, OR and surrounding areas

Approved

In business since 2022

Free estimates

Credit card accepted

"Martin and his crew tore up a paver patio and partial lawn and installed a beautiful patio with pavers and river rock. On time and worked quickly! I was really happy with how I was treated and the quality of work they did. It was a small project which I sometimes have a hard time finding people for and Martin was eager and made me feel like it was worth his time."
Old Vanity
Old shower
New flooring
Bathroom Remodel
Added two shower niches

+10

Response time2 days
3 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for The Renovation Company
The Renovation Company
4.5(
73
)
Basement - Remodel

Serving Timber, OR and surrounding areas

In business since 2011

Free estimates

Credit card accepted

"I have lived in this house for 25 years, and the only project I truly feared was siding.  I have made LOTS of changes to the property  over time, but always stopped short of siding.  This was a scary project, but I signed-up because of Fine Finish Remodeling's reputation on Angie's list, etc.   Also, the siding REALLY needed to be replaced -- in some areas, it was practically held together by paint.  Other exterior improvements (roof, front door and garage door) were being done by other contractors, during the same time period.

-- Mark Stevens is owner / contractor of Fine Finish Remodeling.  He did an excellent job of communicating and moving this project along, and referring out to others as needed.  The supervisor,  Kevin Dunsworth was great, and the house shows that. 

-- Delays happened, because they do.  The contractor had some issues. The weather was sometimes lousy.  PARR lumber delivered some of the materials to somewhere else, which stopped work for about a week.  Holidays happened. People had illnesses.   Siding work stopped while  the roof was repaired and replaced (2 days).  ETC.   In general, I was impressed to watch the changes take shape.  I believe it all moved along as quickly as it could.

--I was part of the problem too.  Two different garage door companies had volunteered their opinion that I could have one BIG garage door, rather than 2 smaller doors, if I wanted to do that.  It would be no problem, according to them.  I talked to Mark, about this, and he told me what could happen if the garage door men were wrong, and recommended I consult a  structural engineer first.  He gave me a name; I called; and the short version is a huge new beam was needed.  It took 6 men to lift that into place.  The final garage door outcome is perfect. Many thanks to Mark for coordinating the extra work my super-sized garage door required.

--Logistically, the siding was removed and replaced from sides and back of house first, leaving the street appearance somewhat intact until the end.  Hardie Plank siding comes with color, but the trim is just primed, so my family did a lot of painting in our garage, and other locations.  Kevin was kind enough to give warning when there was trim to paint for an inside angle, since that would have been nasty to do after it was installed.  I had one area outside the master bedroom that had always looked strange, for the way the old trim and siding met under the eaves.  I pointed that out, and Kevin fixed it with the new trim and siding. 

--When the house was finished, it was slightly wider than it used to be, sufficiently that the downspouts no longer fit. Mark gave me the names of area gutter companies, and the first one came right out and made new downspouts and cleaned the gutters too for a great price.

--The house exterior is done, and it looks great-- and the street noises are much quieter, and odd drafts are gone.  My scary project turned out to be a good experience with a happy outcome."
Recommended by89%of homeowners
Avatar for Western Build and Design Construction
Western Build and Design Construction
4.8(
51
)
Basement - Remodel

Serving Timber, OR and surrounding areas

In business since 2019

Free estimates

Warranties offered

"After an exhausting search for a kitchen remodel contractor who would follow through, we hired Joe and his team at Western Build & Design. Honestly, and after the runaround we had been given by several previous contractors, I was highly skeptical of Joe’s promises as they seemed all too good to be true. Thankfully, he has stayed in close contact with us and has stayed true to his word. His project managers, Chris and Deana, are both highly professional, skilled, honest, and efficient. The two have them have ensured that project runs smoothly and that we will end up with just the look we were hoping for. We will likely hire this company again to tackle another one of the updates in our house."
Kitchen remodel
Major Kitchen remodel
Bathroom remodel
Kitchen remodel
Bath remodel

+36

Response time3 days
Recommended by97%of homeowners
Avatar for Luxe Renovations
Luxe Renovations
4.4(
214
)
Basement - Remodel

Serving Timber, OR and surrounding areas

In business since 2005

Free estimates

Credit card accepted

"The project went excellently. Jorge and his crew cleaned, prepped and painted the siding, eaves, exterior doors and gutters of my 50+ house. They were very professional and completed the job on time as promised in spite of the 90+ heat in early August. The gutters required 3 coats of paint to cover the deep red which they recommended after the 2nd coat. The entire project was completed in 4 days. Upon completion they cleaned up and removed all painting related materials. I highly recommend this company and will use them again in the future for further painting as needed."
Additional Photos
Additional Photos
Additional Photos
Before
After

+29

Recommended by85%of homeowners
Avatar for Custom Design & Construction
Custom Design & Construction
4.4(
54
)
Basement - Remodel

Serving Timber, OR and surrounding areas

In business since 2011

Free estimates

Emergency services offered

"Contractor came to re-install original basement door.  I didn't realize that previous remodel required handing change - which direction door opened.  Ordered new door from Suburban Door in Tualatin.  Contractor returned and hung new door in existing opening.  Removed door frame, installed pre-hung door, changed out hardware.  Door looks good and works as intended.  Would use them again for small job like this."
Custom Cabinets
Custom Entertainment Center
Custom Table & Chairs
Recommended by80%of homeowners
...
Showing 1-10 of 82
FAQs for basement remodeling projects in Timber, OR

Finishing a basement turns unused square footage into livable space and returns up to 70% of what you spend when you sell your home. Beyond that resale boost, you gain a playroom, home office, or guest suite you can start enjoying right away. That mix of daily comfort and solid return on investment (ROI) makes basement finishing one of the smartest upgrades you can tackle.

In some parts of the country—especially lots on swamps, high water tables, or other wetlands—local codes prohibit basements. Saturated soil puts constant pressure on foundation walls and lets water seep in faster than any sump pump can handle. 

If your property sits on waterlogged ground, building on a slab or crawl space is often safer, more affordable, and code-compliant.

Most basements wrap up in four to eight weeks. Framing takes three to five days, with electrical and plumbing rough-ins following over the next week. Add five days for drywall, two to three for flooring, and another week for paint, trim, and punch-list items. 

Delays can happen if materials run late or your contractor’s calendar is packed, so build in a little cushion when you plan.

Whether a finished basement counts toward your home’s official square footage depends on local rules. Many areas only include below-grade space if it has code-approved egress, fully finished walls, ceilings, and floors, plus consistent heating. 

Check with your local assessor or building department before you start; meeting those standards can affect taxes, appraisals, and resale value.

Building codes require a checklist: dedicated heat and electrical service, a code-approved stairway, and at least one egress window or exterior door. Walls, ceilings, and floors must be fully finished and meet insulation, ventilation, and fire-separation standards. If you add a bedroom, you’ll also need a closet, proper clearances, and safe exits. If you change the layout later, be ready to update the space so every new room still meets today’s code.

The Timber, OR homeowners’ guide to basement remodelings

From average costs to expert advice, get all the answers you need to get your job done.