Top-rated walk in tub installers and replacers.

Get matched with top walk in tub installers and replacers in Manchester, MD

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Walk in tub installers and replacers in Manchester

Avatar for West Shore Home Mechanicsburg
West Shore Home Mechanicsburg
4.9(
823
)

Serving Manchester, MD and surrounding areas

Approved

In business since 2006

Free estimates

Warranties offered

"Greg P. and Mike B. worked tirelessly to remove our old whirlpool tub/shower and install a new walk-in shower, all in one day. They did an outstanding job."
Levine
Levine
Levine
Levine
Levine

+45

Response time50 mins
422 neighbors recently requested a quote
Recommended by93%of homeowners
Avatar for DMV Kitchen & Bath Inc
DMV Kitchen & Bath Inc
4.9(
280
)

Serving Manchester, MD and surrounding areas

Approved

Super Service Award Winner

In business since 2010

Free estimates

Warranties offered

"We selected DMV based on our previous experience with the company starting with Rolando who successfully remodeled our kitchen and 3 baths back in 2015 and with Javier in remodeling of 1 bathroom, construction of an outdoor shed, and finally remodeling of our 1st and 2nd floors. For details on this more recent 2022 project consult my review elsewhere on Anji. . The construction area consisted of two sides of the basement--the “finished” side for an office *** guest room plus a small hallway; the other, a larger “unfinished” side for storage. The project began by moving everything in the small hallway to other parts of the house. Then they cleared what would be the “finished” side of the basement moving the sofa bed, several desks, 3 bookcases, a couple office chairs, a table, several bookcases, 7 file cabinets, clothes and other items from the closet, and numerous boxes of books plus files removed from file cabinets to the other side of the basement or, when necessary, to other parts of the house, outdoor shed, and garage while they worked on the “finished” side. Some of the items in the “unfinished” side had to be moved out of the basement to another part of the house to make room for heavier items that could not be lugged upstairs without breaking someone’s back. Two more file cabinets that I had not yet emptied they moved on a dolly to the other side of the basement. I regretted having emptied the 7 other file cabinets so that even more boxes with file contents had to be carefully labelled and moved to the other side. That was my fault! It was a complex undertaking since we were adding to what was already stored on the “unfinished” side, but the men were creative, cooperative, and experienced in meeting the challenge with us. The work began on the “finished” side and small hallway with demolition of the existing ceiling and lighting. Once the men cleaned up that mess they installed electrical cabling, wood, and drywall for the ceiling. They repaired the 2 feet of drywall around the bottom perimeter of the wall. Once the basic structure was in place they applied 2 coats of plaster to the walls and ceiling, and then sanded them. They taped the corners and joints. Following our selection of paint, they applied primer on the walls and ceiling, sanded, and then applied 2 coats of off-white paint to the walls and ceiling. What a beautiful transformation of the walls! To prepare for the installation of the luxury vinyl tile floor planks on the “finished” side and hallway they evened out the existing concrete with additional concrete. They lay the beautiful, brownish-gray floor planks on the concrete floor. Javier convinced us that the brownish-gray would be a good selection and he was right. Then the men installed baseboards and shoe molding around walls of the finished side and hallway. At some point they installed 8 recessed lights. What amazing acoustics in that room while it was still empty! In the latter phase of the “finished” side Alvaro repaired, sanded, and painted the stairway and lay the luxury vinyl tile floor planks to the stairs. To match the stairway, he sanded and stained the stair railing to match the stairs. He also repaired, sanded, and painted the walls off-white on either side of the stairway and the ceiling. Finally he painted the door separating the basement and kitchen. What a major transformation of that stairway! We were so pleased with the results! In the next phase of the project we transferred our attention to the “unfinished” side. After covering all the furniture, boxes, etc. with plastic they installed electrical cabling, wood, and dry wall on the ceiling. Then they applied plaster to the ceiling, sanded it, primed and painted it with 2 coats of paint. Then they installed 11 recessed lights to what previously was a deep, dark dungeon. When that major work was completed and the plastic removed, they vacuumed the area as best they could and moved the furniture and some of the boxes and bins back to the “finished” side. After a gap in construction Alvaro installed four heavy-duty, industrial-welded, steel storage units with adjustable shelves along the walls of the “unfinished” side of the basement so we didn’t have to worry about flimsy shelves collapsing with the weight of heavy boxes and plastic bins. Gradually we filled the shelves and file cabinets, moving some items temporarily stored in other parts of the house back to the basement. Alvaro (?) also installed a steel storage unit at one end of the garage to hold our daughters’ heavy boxes, some of which had been moved out of the basement and were collapsing with the weight of far too many boxes stacked on each other. Thanks to Javier for that creative solution to the problem! The DMV workmen did some additional jobs not directly related to repairing and painting walls and ceilings, installing hardwood/vinyl floors and lighting in the basement. Once the major work was done in the basement they went upstairs and moved some of the remaining displaced items to other parts of the house, garage, and shed. They installed a smoke detector and carbon monoxide detector, secured 2 bookcases to the wall, installed 3 transition pieces on the floors beneath the doorways, and installed 3 dimmers for the lights. After completing most of the work in the basement they performed extra tasks not listed in the contract upstairs, tasks like tightening the screws in a door that would not close, installing a toilet seat, repairing a knob on one of our utility closets, and moving an office chair in the family room to the garage for goodwill. Fabio installed 4 internet connections: 2 in the basement, 1 in the family room on the ground floor, and 1 in the den on the second floor. Finally my husband and I could use our computers! Then when all was said and done the men installed dimmers swept and cleaned the two sides of the basement and hallway one last time. Muchas gracias to Alex and Wilmer for doing most of the moving, cleaning, and trash collection, to Alvaro and Cesar for doing the construction including installation of the shelving units, to Fabio for installing the 4 internet connections, and to Orlando and Jose for wrapping things up at the end. Bon trabajo! The quality of materials and workmanship on the basement remodeling was exceptional as we have come to expect of this company. And because we are an elderly couple we really appreciated the extra help in moving things around in the basement and around the house. The workmen were reliable, polite, honest, skilled, hardworking, and flexible in adjusting to additions and changes from time to time. They always took extra care to clean up at the end of the day and to pick up trash as it was collected. The price seems reasonable given the extra work not previously budgeted. Javier was great at planning, communicating, and allowing for extra time when we needed it to make decisions on where to put things or to do some of the moving ourselves, but he could certainly have benefited from having a right-hand man to assist him when he was not immediately available. We would highly recommend DMV for home remodeling projects. We selected DMV based on our previous experience with the company starting with Rolando who successfully remodeled our kitchen and 3 baths back in 2015 and with Javier in remodeling of 1 bathroom, construction of an outdoor shed, and finally remodeling of our 1st and 2nd floors. For details on this more recent 2022 project consult my review elsewhere on Anji. . The construction area consisted of two sides of the basement--the “finished” side for an office *** guest room plus a small hallway; the other, a larger “unfinished” side for storage. The project began by moving everything in the small hallway to other parts of the house. Then they cleared what would be the “finished” side of the basement moving the sofa bed, several desks, 3 bookcases, a couple office chairs, a table, several bookcases, 7 file cabinets, clothes and other items from the closet, and numerous boxes of books plus files removed from file cabinets to the other side of the basemen"
Kitchen Remodeling-Medallion Cabinets
contemporary microwave installed on the kitchen island
Vienna -VA Kitchen
Bathroom Brookeville-MD
Kitchen Remodeling-Medallion Cabinets

+50

Response time11 hrs
37 neighbors recently requested a quote
Recommended by96%of homeowners
Avatar for Renken Remodeling
Renken Remodeling
4.7(
38
)

Serving Manchester, MD and surrounding areas

Approved

Super Service Award Winner

In business since 2018

Free estimates

Warranties offered

"Excellent. Nicole sold me on the order; Dan and Mahadi were great installers. They did the work in a timely manner & cleaned up their mess perfectly. I adore the new bathtub & surroundings. I highly recommend this group for all your bathroom or remodeling needs as I would definitely hire them again!!"
Full Bathroom Remodel Project
Before and After
Shower Expansion Before and After
Remodeling - Kitchen & Bathroom Project
Remodeling - Kitchen & Bathroom Project

+19

Response time2 days
Response rate100%
6 neighbors recently requested a quote
Avatar for VKB Kitchen & Bath
VKB Kitchen & Bath
4.8(
309
)

Serving Manchester, MD and surrounding areas

Approved

In business since 2002

Free estimates

Emergency services offered

"After interviewing several companies to have our kitchen remodelled, we selected VKB, and we are happy we did. VKB provided a lower estimate than other companies, and their reviews were good. As our designer, Sean was easy-going, accommodating and patient in explaining our options. He promptly created the 3d pdf files with the design of our kitchen, which were helpful to have throughout the project. Adam was in charge of our project, and his responsiveness and understanding were outstanding. At one point we were a bit unhappy with a corner cabinet, but reluctantly we felt we needed to "settle" because there was not sufficient space for a Super Susan. Adam made some research and promptly contacted us with a solution that was perfect for enhanced functionality. Last but not least, Ismar, our foreman on the job was professional, responsive, pleasant, and amazingly skilled. He and his team worked diligently on the electrical portion, cabinet installation, backsplash, appliance installation, and painting. Everyone accommodated us to the best of their ability and always left our house clean and orderly. Well done, VKB!"
Kitchen Remodeling in Severn, MD white countertop, cabinets & wooden floors
Kitchen Remodeling in Silver Spring, MD with wooden flooring & quartz countertop
Home Remodel with New Kitchen, Bathroom, Basement & Decking
Complete Home Makeover of Kitchen, Bath & Basement in Laurel, MD
Kitchen Remodel in Laurel, MD with quartz countertop & wooden flooring

+1053

Response time1 day
6 neighbors recently requested a quote
Recommended by90%of homeowners
Avatar for Anderson Home Improvements, LLC
Anderson Home Improvements, LLC
5.0(
35
)

Serving Manchester, MD and surrounding areas

Approved

In business since 1995

Free estimates

Customers say: Quick response

"Mr. Anderson provided excellent service. He did a wonderful job. He was efficient and innovative. He re-attached shutters to the front of the house, installed a towel rack in bathroom and worked on a basement door. I highly recommend Mr. Anderson. We were extremely happy."
kitchen in Ellicott city
cabinets,flooring
kitchen
flooring and cabinets
counter tops

+1

Response time2 days
1 neighbors recently requested a quote
Recommended by80%of homeowners
Avatar for JD Michael Construction Inc
JD Michael Construction Inc
4.9(
57
)

Serving Manchester, MD and surrounding areas

Approved

In business since 1989

Free estimates

Warranties offered

"We could not have asked for a better experience that ended with a beautiful bathroom. Joe and all of the contractors that came in and out of the house were easy to communicate with, friendly and did a phenomenal job. My wife is all ready talking about the next project :). (Will post a picture when I figure out how)"
Remodeling - General Project
Remodeling - General Project
Remodeling - General Project
Additional Photos
Additional Photos

+13

Response time2 days
3 neighbors recently requested a quote
Recommended by98%of homeowners
Avatar for David Rutch's Precision Remodeling Inc
David Rutch's Precision Remodeling Inc
4.8(
117
)

Serving Manchester, MD and surrounding areas

Approved

In business since 2004

Free estimates

Warranties offered

"When we first met with Dave the consult was very informative and relaxing. There was no pressure and Dave listened to what we wanted in our kitchen and how we envisioned the final product. My wife's primary request was to have an island as the focal point of the kitchen, Dave simply said tell me what you what and we'll make it happen. Once we discussed our ideas, Dave explained the complete process and scheduled a time to meet with his design team. The design phase was the most enjoyable part of the project, we picked out cabinets, flooring and counter tops and were able to see the kitchen come to life in front of us. We absolutely loved the design and his design team were able to meet all of our requests. After a few days Dave was able to provide us a final estimate and a time table for the project. The first estimate was a little over our budget however Dave was wonderful working with us to make changes in order to get the project within budget. He was extremely patient and actually provided 6 different estimates in order for the project to meet our needs. After we agreed to move forward we met with Dave again to discuss final details and the time table for the remodel. He explained the complete process, including demolition, would take 3-4 weeks. A big concern with a two and five year old was not having a kitchen sink for weeks on end, Dave assured us that we would have a working sink within 2 weeks. When the project began Dave and his crew arrived at 8am and got right to work. Dave's crew was extremely friendly and very informative during the whole process. With two small children and two dogs they very conscience with safety and cleaned up every evening when they were finished working. Through out the install Dave was fantastic about sending texts every night with progress updates and what was in store the next day. The demolition was complete within two days, that's even with a surprise of having to remove four layers of flooring under the existing floor. After the first week, flooring and electrical was complete and cabinets were installed the second week. When unpacking the cabinets Dave's crew pointed out two slight defects with the cabinets; to us it wasn't a big deal but the professionals that they are, they refused to install them and insisted the factory ship two new cabinets sections. It took a few days for the new cabinets to arrive and they were able to swap out the defective units with no delays to the project. During the third week granite was installed and the plumbing was complete; we finally had our sink back, to the day that Dave promised. By the end of the week the kitchen was almost complete, electrical was finished and lighting was installed. During the final week the painting and back splash was finished, hardware was installed on the cabinets and with that, our dream kitchen was complete. The finished product was even better than we could have envisioned, the transformation from before to after was amazing. So again, if you're looking to remodel your kitchen the search can stop here, Dave Rutch's Precision Remodeling is truly the best of the best......as you can see the finished product speaks volumes."
Additions
Additions
Additions
Additions
Additions

+142

Response time2 days
8 neighbors recently requested a quote
Recommended by94%of homeowners
Avatar for Long Home
Long Home
4.7(
169
)

Serving Manchester, MD and surrounding areas

Approved

Super Service Award Winner

In business since 1945

Free estimates

Credit card accepted

"Very professional installers of my new walk in shower. They repaired dry wall and did plumbing and shower installation. Very happy with the job."
Wet Area Replacement
Wet Area Replacement
Response time6 hrs
413 neighbors recently requested a quote
Recommended by89%of homeowners
Avatar for Comprehensive Renovation LLC
Comprehensive Renovation LLC
5.0(
17
)

Serving Manchester, MD and surrounding areas

Approved

In business since 2016

Free estimates

Warranties offered

I have started a full service renovation company specializing in Bathroom Remodeling. \nWe offer an end-to-end client experience that includes seamless communication, on-site organization and quality work every time. With the current situation regarding COVID19 we are fully prepared to take special measures to ensure your safety as well as ours.\nWhy Choose Us?\nWe are a family oriented company that focuses on being professional, punctual, polite and immediate. With a fully certified staff and a combined 20 years in the industry we can assure that you will get top notch service with the family feel.

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+10

Response time1 day
Response rate96%
9 neighbors recently requested a quote
Showing 1-10 of 15
FAQs for walk in tub installation and replacement projects in Manchester, MD

Because Medicare classifies walk-in tubs as non-durable medical equipment, it generally won’t pick up the tab. Medicaid can help if a doctor certifies that the tub is medically necessary, but rules change by state. Call your plan early, ask which forms you need, and keep any prescriptions or letters on file to improve your odds of reimbursement.

A walk-in bathtub’s fill and drain times hinge on your home’s water pressure and the tub’s hardware. Most models with a fast-fill faucet need about six to eight minutes to fill and two to three minutes to drain; larger basins or standard drains can tack on an extra 10 minutes. Stay seated until the water is completely gone so you don’t swing the door open on a full tub’s worth of water.

A walk-in bathtub holds 50 gallons of water, and its design supports capacities that range from 40 to 80 gallons, depending on the product. In contrast, a standard bathtub holds 25 to 45 gallons. This capacity is determined by the fixed design of the tub and its construction materials. Homeowners should review the detailed product specifications to confirm the exact volume available for use during bath time.

Walk-in tubs are tax-deductible when the purchase qualifies as a necessary medical expense and meets the IRS criteria. Caregivers who install a walk-in tub also qualify for the Dependent Care Tax Credit under specific conditions. Homeowners must verify these requirements with the IRS and consult a tax professional, as state and program guidelines enforce strict documentation standards for such deductions.

The Manchester, MD homeowners’ guide to walk in tub installations and replacements

From average costs to expert advice, get all the answers you need to get your job done.