Top-rated brick or stone siding: installers or completely replacers.

Get matched with top brick or stone siding: installers or completely replacers in South Bend, IN

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Brick or stone siding: installers or completely replacers in South Bend

Avatar for WLP Masonry & Construction LLC
WLP Masonry & Construction LLC
5.0(
3
)

Serving South Bend, IN and surrounding areas

Approved

In business since 2023

Offers commercial services

Customers say: Quick response

"We are very pleased with the work of WLP Masonry. The chimney project looks great. It was completed in the quoted timeframe. I recommend WLP Masonry for any brick or masonry projects"
Block Foundation
Block Addition
Ada Stone Garage
Robinson Brick and Stone
Ada Stone Gable

+8

Response time9 hrs
Response rate85%
7 neighbors recently requested a quote
Avatar for Acculevel Inc
Acculevel Inc
4.6(
184
)

Serving South Bend, IN and surrounding areas

In business since 1996

Free estimates

Warranties offered

"We thought we needed foundation work. They not only told us that was incorrect. They directed us to a structural engineer who would be able to help us. No charge. Most appreciated."
Recommended by91%of homeowners
Avatar for Exotic Pavers
Exotic Pavers
4.9(
91
)

Serving South Bend, IN and surrounding areas

In business since 2010

Free estimates

Emergency services offered

"Marc and his team at Exotic Pavers completed, on a time, a fantastic paving job. Due to erosion, all the pavers had to be replaced in our front and back yards. The team was courteous, responsive to my requests, and careful with our landscaping and lawn. Marc offered great aesthetic recommendations, and estimated the job quite accurately. I had received 4 other bids for this job, and Marc's estimate and proposal was the most thorough. I would absolutely hire them again!"
Recommended by97%of homeowners
JCS FIREPLACE INC
4.9(
8
)

Serving South Bend, IN and surrounding areas

"We can't express how much we appreciate JCS Fireplace and their staff for our gorgeous new fireplace. They replaced a fireplace that had been done when the house was built in 1949. Now we have a modern looking fireplace we will be enjoying the rest of our lives. Jeff, Cindy, Joe and their installers are just wonderful. They are very neat and meticulous when doing their job. There is very little clean up after they leave. The stone used on our fireplace was small and many sizes, Dave our installer, was patient and continued to complete the job in one day even though it took him over 10 hours. We love JCS Fireplace. Highly recommend talking to them if you are considering a fireplace redo or a new fireplace. You won't be disappointed."
Recommended by87%of homeowners
Avatar for DreamScape Home Improvement
DreamScape Home Improvement
4.8(
53
)

Serving South Bend, IN and surrounding areas

In business since 2009

Free estimates

Warranties offered

"Excellent tilework, always cleaned up, kind and courteous, great about changes in design, even the glass doctor gave a great review on the levelness of the tile that they were putting the glass on."
Recommended by92%of homeowners
Avatar for Legacy Window & Door LLC
Legacy Window & Door LLC
4.5(
116
)

Serving South Bend, IN and surrounding areas

Free estimates

Emergency services offered

Warranties offered

"After receiving a few other estimates on a sunroom addition plus a screened in porch, we decided to go with Legacy Windows. Mark’s estimate was in the middle of the other estimates and he offered much more flexibility than the other companies we spoke to in terms of customization. He is a great salesman with previous marketing experience. We signed our contract on April 10th. We were told that Mark and his crew were finishing a room and would be able to start in 2-3 weeks with a timeframe of 6-8 weeks for completion of our room addition project. The budget and timeframe worked well for us, so we decided to add replacement windows for the rest of our house (11 windows total). Several weeks went by and our project had not yet started so we followed up with Mark. We were told that there were issues with his current project (did not pass inspection) and it would push our start date back due to the workmanship repairs. During this time period before any work began on our project we would communicate often with Mark to check on the status of our project. The really frustrating thing about working with Mark is his inability to fulfill commitments he would make to us in regards to project timing and when things would be done. Our primary communication with him was via text messages and time after time he would tell us, “we should be starting next week” or “we are going to be making up for lost time quickly” and time would pass and it just wouldn’t happen. Work on our project began when our existing windows were replaced in early June. The foundation for the expansion was finally started in late June and framing started in early July (roughly 3 months after signing the contract). The first crew completed the framing, hired the shingles out, installed some of the cedar siding, and installed one wall of windows. We were seeing decent progress after having such a long wait in the beginning, all the while the commitment issue just kept popping up. We would get a text saying something like, “going to be at the house tomorrow with some stone samples” and he wouldn’t show up. It was annoying, but progress was being made and we were happy with how the expansion was taking shape so we were willing to overlook it. Sometime toward the beginning of August (roughly 4 months after signing the contract), work just stopped. Again, when we would reach out to Mark asking about the status of our project we would be told, “I’ll have an action plan later this afternoon” or “we want to get everything we done we can this week” or “the crew will be there tomorrow and we will be working all week on your project trying to finish”. In the meantime, nothing would be done and we would repeat the process. This went on for over 3 weeks, during this time there was absolutely no work done. Large piles of construction trash and building materials sat in our yard during this time. A great deal of the usable wood began to warp and I am sure that ultimately materials had to be tossed from being left in the elements for so long. After a couple weeks I finally moved a significant portion of the usable wood up onto the deck so it would at least be partially protected. We found out that there was an issue with the electrical and Mark had decided to let Crew #1 go as they were not meeting his expectations, but it was not communicated to us until the end of the over 3 week period. A second crew then arrived who Mark said usually only did work for him on the south side of Indy (we live in Lebanon), but he wanted to get our project back on track. There seemed to be little to no communication between the crew and Mark on what they were supposed to work on so we had to explain to them what was in the contract to be completed. Crew #2 also started making good progress, they finished the cedar siding, got the rest of the windows installed in the sunroom as well as installing the sunroom ceiling. About this time, which was at the beginning of September we had a separate crew come out to do the drywall. Mark recommended them very highly. As it turned out, the drywall was not properly installed or insulated (in some walls there was no insulation), and ultimately it had to be taken down and redone by Crew #2. Crew #2 seemed to be doing a really good job and we were quite pleased with their progress and the quality of work they were doing for us. They were replaced by Crew #3 sometime in mid-September. We were never told why they were replaced, but Crew #3 was much closer to where we lived so I assume that had something to do with it. Much like when Crew #2 started, there seemed to be little communication between Crew #3 and Mark on what they were supposed to work on. So we again had to explain what was in the contract to be completed. All through the process, the commitment issues mentioned previously continued. We were not as happy with the quality of the work done by Crew #3 as we had been by Crew #2 (or even Crew #1), but they did finally complete for the project for us and after (3) failed attempts we finally received a pass from the building inspector on his final inspection. When Crew #3 decided they were finished they never came back, we communicated multiple times with Mark about the remaining punch list items to no avail and ultimately decided to finish most of the small punch list items ourselves instead of waiting any longer for them to finish (clean up, sanding / finishing drywall, etc.). We love the way the sunroom and covered porch area turned out. From contract signing until the end it took a little over six months, but in Mark’s defense he did agree to let us add a brand new window in the dining room of our house to tie everything together at no cost to us as appreciation for our patience. There are things that we liked about Mark’s company and things we didn’t, I have tried to summarize each category as follows: Positives • Price seemed reasonable • It is truly a custom build, no problem with changes we had at any point • Love the way it turned out, looks amazing • Mark seemed to genuinely care about the quality of the product he was delivering to us (he replaced the cedar shakes that had been installed by Crew #1 because he wasn’t happy with the quality Negatives • Our project seldom felt like it was a priority, part of the reason it took so long was because they were over committed on other projects • Commitment Issues (addressed previously) • Construction Trash left in our yard for months • We cleaned up inside more than they did, I understand drywall work is messy. They never swept up any of the dust and they didn’t clean up any of the clumps of dried drywall mud all over the floor. • We finished some of the minor punch list items, just to be done."
Recommended by84%of homeowners
...
Showing 1-10 of 53
FAQs for brick or stone siding: install or completely replace projects in South Bend, IN

Brick siding offers numerous advantages, including high durability and resistance to harsh weather conditions, requiring minimal maintenance and lasting for generations. It provides natural insulation, enhancing energy efficiency by regulating indoor temperatures year-round. Brick is fire-resistant, improving home safety, and reduces external noise for a quieter indoor environment. Its timeless aesthetic appeal boosts curb appeal and can increase your home's resale value.

Yes, you can add brick to an existing house. One option is to remove the current siding and install full brick masonry, which involves laying traditional bricks with mortar for a solid brick exterior. Alternatively, you can opt for brick veneer siding, a thinner layer of real or manufactured brick applied over the existing structure. Brick veneer is typically more affordable and easier to install while still providing the aesthetic benefits of brick. Both methods can enhance your home's appearance and value.

Yes, installing brick siding often provides a significant return on investment. With an average ROI of around 77%, and some returns exceeding 80%, brick siding enhances curb appeal, energy efficiency, and longevity, making your home more attractive to potential buyers and potentially increasing resale value.

Brick siding is known for its exceptional longevity, often lasting over 100 years when properly maintained. Regular maintenance, like repointing mortar joints, ensures its durability over time. Brick veneer, while thinner than full brick masonry, is durable and can last up to 50 years or more with proper care. Both options offer long-lasting protection and value for your home.

When choosing brick siding, consider your budget, as costs can vary depending on brick type and installation method. Also, consider your desired aesthetic; different bricks offer various colors, textures, and styles to complement your home's architecture. Installation time and complexity are factors, with options like brick veneer being quicker and less labor-intensive than full brick masonry. Additionally, assess the maintenance requirements and durability to select the best option for your long-term needs.

Alternatives to brick siding include vinyl siding, which is cost-effective and low-maintenance and offers a variety of colors and styles. Wood siding provides a natural, classic look but requires more upkeep to prevent weather damage. Fiber cement siding is durable and can mimic the appearance of wood or masonry without the high maintenance. Each alternative has its own advantages, so consider factors like budget, aesthetics, and maintenance when making your choice.

The South Bend, IN homeowners’ guide to brick or stone siding: installs or completely replacements

From average costs to expert advice, get all the answers you need to get your job done.

  • A worker building a stone wall

    Who to call for stone wall repair? Learn why a masonry pro is best, how repairs work, and what labor costs per hour—start your project now

  • A view of a concrete block retaining wall

    Who to hire to install a block wall? Compare landscapers vs masonry contractors, see average cost, and learn how pros get it done

  • fence posts made of split face block

    Learn how different styles, labor rates, project types, and other factors impact total split-face CMU block costs with our detailed guide.

  • backyard bluestone patio with columns and patio furniture

    A bluestone patio is a great addition since it can add value and beauty to your home. Read on to learn more about how much a bluestone patio costs to install.

  • House with red front door and red brick wall

    Learn about the different types of standard and specialized bricks and how the cost of bricks affects your project budget with our brick cost guide.