Recent Job Requests for Replace or Repair Grout Contractors in Washington, District of Columbia:
Project Location:
Washington,
DC
20009
Date: 12/06/2019
Tile Location: Bathroom
Type of Tile: Marble
Request Stage: Ready to Hire
Desired Completion Date: Within 1 week
Comment: Leaking grout
Project Location:
Washington,
DC
20015
Date: 11/2019
Tile Location: Tub / shower or surrounding area
Type of Tile: Ceramic tile
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Property Owner: Yes
Comment: Regroup tub and tile surrounds so no more mildewand mold
Project Location:
Washington,
DC
20019
Date: 11/2019
Tile Location: Outdoors
Type of Tile: Other
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Project Location:
Washington,
DC
20012
Date: 11/2019
Type of Service: Replace or repair grout
Type of Surface: Tub / shower or surrounding area
Request Stage: Ready to Hire
Desired Completion Date: Within 1 week
Property Owner: Yes
Comment: grout/caulking needs replacement in 2nd floor shower. Water has been unknowingly seeping through the shower floor and collecting in the pan for a while. Shower is used by elderly parent and not noticed. Once pan overflowed the ceiling of the lower level den which is below that shower whoosed out into that room. There may be mold since I don't know how long the water was seeping/sitting in that ceiling. 1. need shower floor fixed 2. need den ceiling/bar area repaired//mold free/painted
Project Location:
Washington,
DC
20024
Date: 11/2019
Kind of Project: Replace or repair grout
Select the type of tile: Ceramic or Porcelain
Materials Provided by Customer: Yes
What kind of location is this?: Home/Residence
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Comment: Grout cracked in bathroom floor and needs replacement
Project Location:
Washington,
DC
20003
Date: 11/2019
Tile Location: Bathroom, Tub / shower or surrounding area
Type of Tile: Ceramic tile
Request Stage: Planning & Budgeting
Desired Completion Date: Timing is flexible
Comment: Re-caulk bathroom tub- not grout, but this was the closest category
Project Location:
Washington,
DC
20001
Date: 11/2019
Tile Location: Bathroom
Type of Tile: Ceramic tile
Request Stage: Ready to Hire
Desired Completion Date: Within 1 week
Property Owner: Yes
Project Location:
Washington,
DC
20001
Date: 11/2019
Kind of Project: Replace or repair grout
Select the type of tile: Ceramic or Porcelain
Materials Provided by Customer: No
What kind of location is this?: Home/Residence
Request Stage: Ready to Hire
Desired Completion Date: Within 1 week
Comment: Small 3âx3â old shower box. Tile is solid, but grout is broken down. MUST scrape out grout on floor and 3 walls. Regrout, grout seal, clean. ASAP
Project Location:
Washington,
DC
20032
Date: 11/2019
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Property Owner: Yes
Comment: I would like to get an estimate for
Project Location:
Washington,
DC
20015
Date: 11/2019
Tile Location: Bathroom
Type of Tile: Marble
Request Stage: Ready to Hire
Desired Completion Date: 1 - 2 weeks
Property Owner: Yes
Comment: I would like to get an estimate for replacing grout in one bathroom.
Project Location:
Washington,
DC
20007
Date: 10/2019
Tile Location: Tub / shower or surrounding area
Type of Tile: Don't know
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Property Owner: Yes
Comment: Need to re-caulk the perimeter of the bathtub/shower. Looking for quotes.
Project Location:
Washington,
DC
20017
Date: 10/2019
Tile Location: Bathroom, Tub / shower or surrounding area
Type of Tile: Ceramic tile
Request Stage: Ready to Hire
Desired Completion Date: 1 - 2 weeks
Property Owner: Yes
Project Location:
Washington,
DC
20032
Date: 10/2019
Tile Location: Bathroom, Tub / shower or surrounding area
Type of Tile: Don't know
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 weeks
Project Location:
Washington DC,
DC
20032
Date: 10/2019
Tile Location: Bathroom
Type of Tile: Ceramic tile
Request Stage: Ready to Hire
Desired Completion Date: Within 1 week
Property Owner: Yes
Comment: need grouting by tub fixed. the base of the tub has recently separated
Project Location:
Washington,
DC
20009
Date: 09/2019
Tile Location: Tub / shower or surrounding area
Type of Tile: Ceramic tile
Request Stage: Planning & Budgeting
Desired Completion Date: Within 1 week
Comment: Master bathroom shower has grout pieces crumbling and disappearing from shower floor. May be urgent issue. Repair? Re-tile? Seeking evaluation/estimate this week,please.
Project Location:
Washington,
DC
20016
Date: 09/2019
Kind of Project: Replace or repair grout
Location of Tile Installation: Tub/Shower
Materials Provided by Customer: No
What kind of location is this?: Home/Residence
Select the type of tile: Ceramic or Porcelain
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Property Owner: Yes
Comment: I would like to get an estimate. We have a very modern shower installed 5 years ago in a brand new construction. The drain is long and narrow and it is leaking to the room below. We need to fix that so it doesn't€™t leak anymore
Project Location:
Washington,
DC
20001
Date: 09/2019
Tile Location: Tub / shower or surrounding area
Type of Tile: Don't know
Property Owner: Yes
Desired Project Start Date: Tomorrow
Project Location:
Washington,
DC
20016
Date: 09/2019
Type of Service: Replace or repair grout
Type of Surface: Tub / shower or surrounding area
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Property Owner: Yes
Comment: re-caulk a bathtub
Project Location:
Washington,
DC
20001
Date: 09/2019
Kind of Project: Replace or repair grout
Select the type of tile: Ceramic or Porcelain
Materials Provided by Customer: Yes
What kind of location is this?: Home/Residence
Request Stage: Ready to Hire
Desired Completion Date: Timing is flexible
Project Location:
Washington,
DC
20019
Date: 09/2019
Kind of Project: Replace or repair grout
Select the type of tile: Ceramic or Porcelain
Materials Provided by Customer: No
What kind of location is this?: Home/Residence
Request Stage: Planning & Budgeting
Desired Completion Date: More than 2 weeks
Comment: Install a safety hand rail in shower.