Top-rated carport (metal) builders.

Get matched with top carport (metal) builders in Shelbyville, IN

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Carport (metal) builders in Shelbyville

Avatar for Apex Design Build
Apex Design Build
4.5(
793
)

Serving Shelbyville, IN and surrounding areas

Approved

In business since 2011

Free estimates

Warranties offered

"This was a relatively small job but Apex Design Build was able to work me in and get the repairs done. Isis thoroughly explained the repair process and answered all my questions. The work was first rate. I'm pleased with the results. I am a repeat customer and intend to use Apex Design Build as my go-to source for future work."
Additional Photos
Additional Photos
Additional Photos
11 neighbors recently requested a quote
Recommended by86%of homeowners
Avatar for Innovative Garages of Indy
Innovative Garages of Indy
4.9(
190
)

Serving Shelbyville, IN and surrounding areas

In business since 2002

Free estimates

Emergency services offered

"Innovative garages did an awesome job on my new polyaspartic floor. They were timely, responsive and professional. It looks wonderful. Everyone that sees it comments on how beautiful it is."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+5

Recommended by97%of homeowners
Avatar for Moore Construction Services
Moore Construction Services
4.6(
105
)

Serving Shelbyville, IN and surrounding areas

In business since 1971

Free estimates

Credit card accepted

"

My original 4x4 wooden posts that were supporting the swing gate doors were not substantial enough to support the weight of the doors, and so the gate was leaning over and was unusable.


I hired Moore Construction Services to:





  • Remove 3 of the 4x4 wooden posts (that were set in concrete).
  • Backfill 1 of the post holes with dirt (it would not be used for the new posts).
  • Dig the other 2 post holes an additional 10 to 12 inches deeper.
  • Set 2 new treated 6x6 wooden posts in concrete into the post holes.
  • Re-hang the swing gate doors.


Moore Construction subcontracted the job out to a fence company.  The finished job was acceptable, although there were a couple of hinge installation errors that I fixed myself.  For example, one hinge was installed upside down, was missing a lag bolt, and wasn't making proper contact with the supporting fence board.  Another hinge on the other door was not making proper contact with the supporting fence board.  I felt that without proper support, the hinges would fail with use over time.  


To my knowledge, the General Manager from Moore Construction never stopped by for a follow-up inspection of the work.  If he had then surely he would've noticed the hinge installation errors.  I did, however, receive a follow-up phone call where I had the opportunity to complain about the hinges ? but it seemed hardly worth mentioning, even though it bothered me.





We?ve used Moore Construction Services in the past and were extremely pleased with their work ? that is why we used them for this job.  So, perhaps because the work was sub-contracted, this was just a ?one-off? experience where the quality of work didn?t quite measure up to their past performance.









Finally, the one thing that was a constant annoyance was that the General Manager, who came out to give the repair estimate, he could never seem to get my email address correct for correspondence with me.  After not yet having received a quote from him for the work request, I called their office and spoke with Amanda (who was very attentive).  She forwarded to me the GM's original email to me with the quote.  I saw then that he left part of my email address out and that's why I never received the quote.  When I replied back to Amanda to accept the quote and authorize the work to be done, I copied in the General Manager to advise him of his error with my email address and asked him to correct it in his address book.  It just annoyed me because when you intend to use email as the communication platform, then it's imperative to ensure you have your customer's email address correct.


"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+19

Recommended by95%of homeowners
Avatar for Jersey Construction
Jersey Construction
4.4(
169
)

Serving Shelbyville, IN and surrounding areas

In business since 2012

Free estimates

Emergency services offered

"He replaced some cedar on my box window. What I liked is I called for something that didn't need to be done. He said that wasn't needed and he could have told me it did. He said that it just needed to be caulked. I appreciated his honesty. He checked my whole house for wood rot. He explained everything first before doing the work. He gave me the receipt for the boards I purchased so I could get my money back from Lowe's."
Recommended by82%of homeowners
Avatar for Heath Outdoor L.L.C.
Heath Outdoor L.L.C.
4.8(
70
)

Serving Shelbyville, IN and surrounding areas

In business since 2009

Free estimates

Credit card accepted

"It was amazing!? It was exactly what I wanted.? They did the whole project super fast and it exceeded my expectations.? Everything came together perfectly. Heath started out by listening to what I wanted and then created a design based on my desires and budget.? He nailed it in the design stage and all he had to do was lead his excellent crews to build it.? The numbers didn't change at the end...no surprises.? I can't recommend them enough!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+12

Recommended by92%of homeowners
Avatar for Tuttle Construction Services Inc.
Tuttle Construction Services Inc.
4.6(
22
)

Serving Shelbyville, IN and surrounding areas

In business since 2014

Free estimates

Credit card accepted

"I had bathroom walls replaced and retiled due to water damage. Nick was very professional, gave me a reasonable estimate and kept me up to date on the progress of his work. He always cleaned up each day. I am very please with Tuttle Construction and would use them again and recommend the company to my family and friends."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+84

Recommended by95%of homeowners
Wesley Design & Contracting
4.4(
90
)

Serving Shelbyville, IN and surrounding areas

In business since 2012

Free estimates

Emergency services offered

Traditional skills combined with superior technique and expertise-that's what separates us from the rest. We are proud to say most of our jobs are referral business from satisfied customers. Whether it's a customized job or for our standard services, you can rely on us!\n\nMr. Wesley has been in this industry for over twenty years. With significant experience in the industry, our highly-skilled, knowledgeable employees will go above and beyond to complete your job. With our qualified team, you can count on expert advice and guidance on finding the optimal solution that is right for you. At Wesley Design & Contracting, we offer a full range of services to meet your needs. Find out how we can help you today!\n\nWesley Design & Contracting has three major principles: performance on schedule, within budget, and with integrity. We work with our clients to make sure their projects are done by the deadline and turn our clients' dreams into realities. You come up with the vision and we make it possible through budgeting, discounts, and promotions.

sheds
Drainage job
remodel
Recommended by82%of homeowners
Avatar for Legacy Window & Door LLC
Legacy Window & Door LLC
4.1(
151
)

Serving Shelbyville, IN and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"After receiving a few other estimates on a sunroom addition plus a screened in porch, we decided to go with Legacy Windows. Mark’s estimate was in the middle of the other estimates and he offered much more flexibility than the other companies we spoke to in terms of customization. He is a great salesman with previous marketing experience. We signed our contract on April 10th. We were told that Mark and his crew were finishing a room and would be able to start in 2-3 weeks with a timeframe of 6-8 weeks for completion of our room addition project. The budget and timeframe worked well for us, so we decided to add replacement windows for the rest of our house (11 windows total). Several weeks went by and our project had not yet started so we followed up with Mark. We were told that there were issues with his current project (did not pass inspection) and it would push our start date back due to the workmanship repairs. During this time period before any work began on our project we would communicate often with Mark to check on the status of our project. The really frustrating thing about working with Mark is his inability to fulfill commitments he would make to us in regards to project timing and when things would be done. Our primary communication with him was via text messages and time after time he would tell us, “we should be starting next week” or “we are going to be making up for lost time quickly” and time would pass and it just wouldn’t happen. Work on our project began when our existing windows were replaced in early June. The foundation for the expansion was finally started in late June and framing started in early July (roughly 3 months after signing the contract). The first crew completed the framing, hired the shingles out, installed some of the cedar siding, and installed one wall of windows. We were seeing decent progress after having such a long wait in the beginning, all the while the commitment issue just kept popping up. We would get a text saying something like, “going to be at the house tomorrow with some stone samples” and he wouldn’t show up. It was annoying, but progress was being made and we were happy with how the expansion was taking shape so we were willing to overlook it. Sometime toward the beginning of August (roughly 4 months after signing the contract), work just stopped. Again, when we would reach out to Mark asking about the status of our project we would be told, “I’ll have an action plan later this afternoon” or “we want to get everything we done we can this week” or “the crew will be there tomorrow and we will be working all week on your project trying to finish”. In the meantime, nothing would be done and we would repeat the process. This went on for over 3 weeks, during this time there was absolutely no work done. Large piles of construction trash and building materials sat in our yard during this time. A great deal of the usable wood began to warp and I am sure that ultimately materials had to be tossed from being left in the elements for so long. After a couple weeks I finally moved a significant portion of the usable wood up onto the deck so it would at least be partially protected. We found out that there was an issue with the electrical and Mark had decided to let Crew #1 go as they were not meeting his expectations, but it was not communicated to us until the end of the over 3 week period. A second crew then arrived who Mark said usually only did work for him on the south side of Indy (we live in Lebanon), but he wanted to get our project back on track. There seemed to be little to no communication between the crew and Mark on what they were supposed to work on so we had to explain to them what was in the contract to be completed. Crew #2 also started making good progress, they finished the cedar siding, got the rest of the windows installed in the sunroom as well as installing the sunroom ceiling. About this time, which was at the beginning of September we had a separate crew come out to do the drywall. Mark recommended them very highly. As it turned out, the drywall was not properly installed or insulated (in some walls there was no insulation), and ultimately it had to be taken down and redone by Crew #2. Crew #2 seemed to be doing a really good job and we were quite pleased with their progress and the quality of work they were doing for us. They were replaced by Crew #3 sometime in mid-September. We were never told why they were replaced, but Crew #3 was much closer to where we lived so I assume that had something to do with it. Much like when Crew #2 started, there seemed to be little communication between Crew #3 and Mark on what they were supposed to work on. So we again had to explain what was in the contract to be completed. All through the process, the commitment issues mentioned previously continued. We were not as happy with the quality of the work done by Crew #3 as we had been by Crew #2 (or even Crew #1), but they did finally complete for the project for us and after (3) failed attempts we finally received a pass from the building inspector on his final inspection. When Crew #3 decided they were finished they never came back, we communicated multiple times with Mark about the remaining punch list items to no avail and ultimately decided to finish most of the small punch list items ourselves instead of waiting any longer for them to finish (clean up, sanding / finishing drywall, etc.). We love the way the sunroom and covered porch area turned out. From contract signing until the end it took a little over six months, but in Mark’s defense he did agree to let us add a brand new window in the dining room of our house to tie everything together at no cost to us as appreciation for our patience. There are things that we liked about Mark’s company and things we didn’t, I have tried to summarize each category as follows: Positives • Price seemed reasonable • It is truly a custom build, no problem with changes we had at any point • Love the way it turned out, looks amazing • Mark seemed to genuinely care about the quality of the product he was delivering to us (he replaced the cedar shakes that had been installed by Crew #1 because he wasn’t happy with the quality Negatives • Our project seldom felt like it was a priority, part of the reason it took so long was because they were over committed on other projects • Commitment Issues (addressed previously) • Construction Trash left in our yard for months • We cleaned up inside more than they did, I understand drywall work is messy. They never swept up any of the dust and they didn’t clean up any of the clumps of dried drywall mud all over the floor. • We finished some of the minor punch list items, just to be done."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+70

Recommended by84%of homeowners
Avatar for Curts Construction LLC
Curts Construction LLC
4.2(
46
)

Serving Shelbyville, IN and surrounding areas

In business since 1977

"I've had a very positive experience with Curts Construction. Their prices were reasonable. They gave very personal service and were very professional. They were timely. We didn't have one problem with them."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+28

Recommended by85%of homeowners
Avatar for Rollins Rentals & Rehabs LLC
Rollins Rentals & Rehabs LLC
4.3(
1,120
)

Serving Shelbyville, IN and surrounding areas

In business since 2003

Free estimates

Emergency services offered

"Contacted us immediately after purchasing Big Deal and arranged a time when their guys would be out to perform the work.  Told us the materials we would need prior in order to save time.
They showed up on time, found the cause of the leak and recaulked the shower around a section of wall where it was leaking.  Tore out the drywall that was impacted by the leak and cleaned out the area.  Unfortunately, they cracked the molding in the process.  They installed the drywall patch and then tapped and mudded.  The job was average and there is still a large lump where they could have spent more of the time removing a metal corner and prepping the area - I think they were focused on time even thought we had purchased 4 hours and they were finished in less.
We understood that we would have to sand and paint the area as their work needed time to dry.  However, we also had to spend some extra time fixing some detail work and sanding down and fixing the molding.
"
New vanity and lighting.
Additional Photos
Company Service Van
Recommended by83%of homeowners
...
Showing 1-10 of 53

The Shelbyville, IN homeowners’ guide to carport (metal) building services

From average costs to expert advice, get all the answers you need to get your job done.

  • stone home with double garage doors

    Need to replace your garage door? Here’s how much it costs, what factors affect cost, and what to expect.

  • new garage built onto house

    How much does it cost to build a garage? Explore cost factors, budgeting tips, and how a garage adds to your home’s value with our detailed cost guide.

  • Walkout patio with concrete floor

    Wondering who seals concrete? Learn who to hire, when DIY makes sense, and how pros seal driveways and garage floors—start your search now