Having a in ground pool opened for the first time in 8 years. A new liner will be installed toward the end of May. A new pump and filter system was installed at the end of April. Everything has gone as scheduled.
4.5
Review by Matthew P.
in Ledyard, CT
Project: Replace Vinyl Liner for Swimming Pool
5.0
Review by Larry A.
in Jewett City, CT
Project: Repair or Service Swimming Pool or Accessories - In Ground
R
4.0
Review by a neighbor
in Waterford, CT
Project: Service a Swimming Pool for Opening or Closing