Project: Coat Concrete Floors with Epoxy or Hybrid Polymer
Were able to lay down the floor within 7 days of my call. Was kept informed all the way from day 1 of my call till the installation day. were prompt, courteous and very neat. explained what was to be done and did a great job of cleaning...