Top-rated brick or stone fireplace installers.

Get matched with top brick or stone fireplace installers in Bremerton, WA

Enter your zip and get matched with up to 3 pros

Matching on HomeAdvisor

Share some details icon
Share some details about your home project.
Match with local pros icon
Within moments, match with highly-rated local pros.
Compare quotes icon
Compare quotes and choose the best pro for the job.

Find Brick or stone fireplace installers in Bremerton

Avatar for J & R Rockscapes
J & R Rockscapes
4.5(
57
)

Serving Bremerton, WA and surrounding areas

In business since 2005

Free estimates

Credit card accepted

"Ryan and crew came to our home for a fairly big job.  Pull tree stumps, grade yard, transplant bushes and shrubs and install 8 cycle sprinkler system and install fire pit.  We couldn't have been happier as Ryan and crew were very punctual and very friendly to work with.  I would and have recommended them!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+74

Recommended by97%of homeowners
Avatar for N.E.Construction llc
N.E.Construction llc
5.0(
6
)

Serving Bremerton, WA and surrounding areas

In business since 2008

Free estimates

Credit card accepted

"Serghei came for a visit in the early morning to provide me a quote for new A/C install, we agreed on the terms and equipment, since it's winter time I was lucky and got unit installed same day by his crew. Great job and well done. Very much recommended. Thank you!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+29

Recommended by100%of homeowners
Avatar for Flinstone Granite LLC
Flinstone Granite LLC
5.0(
2
)

Serving Bremerton, WA and surrounding areas

In business since 2020

Free estimates

Your Source for Residential and Commercial Stone Countertops. We have over 25 years of experience as owner and operator providing customers with beautiful, high-quality stone countertops and other surfaces for the various living spaces in their homes. Our team has fabricated and installed numerous bathroom countertops and kitchen countertops, in addition to kitchen bar tops, fireplace surrounds, and various commercial and custom stone surface applications. Servicing Kent, Auburn and all of Western Washington

Here we are fabricating the stone for installation
The completed project
Removed all old counters and installed granite counter tops with 5 1/4 back splash, also made a marble cutting board from extra stone.
Additional Photos
Additional Photos

+65

Recommended by100%of homeowners
Avatar for Diamond Touch Landscape Services
Diamond Touch Landscape Services
5.0(
5
)

Serving Bremerton, WA and surrounding areas

In business since 2012

Free estimates

Emergency services offered

No job too big or too small ! \nI take pride what we Specialize in !\nWe have experienced team !\nWe do all kind hardscape work ! \nIrrigation system!\nSod installation!\nRetaining walls !\nPatios!\nRoof cleaning!\nPressure washing \nFencing!\nProperty cleanup

Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+65

Recommended by100%of homeowners
Avatar for Jay Construction
Jay Construction
3.8(
95
)

Serving Bremerton, WA and surrounding areas

In business since 2005

Emergency services offered

Credit card accepted

"Sione was great to work with.  He communicated with me everyday via telephone since this is my rental and I'm out of state.  He also sent me pictures of before and after.  His crew worked hard everyday for 4 days straight before taking a day off to resume for another day or so.  This was a great experience given the circumstances."
Before
After
Before Stamps
After
Steps-Exposed Aggregate

+2

Recommended by77%of homeowners
Avatar for JD BERGEVIN HOMES
JD BERGEVIN HOMES
4.3(
19
)

Serving Bremerton, WA and surrounding areas

In business since 2005

Free estimates

Credit card accepted

"TLDR; Driving progress is up to you.  Painter is incompetent.  Will miss every deadline.  No green building acumen.
  I hired Joe to add a bedroom to my house and pour a concrete pad for another room.   It was a straightforward project he estimated would take 2.5 months (10/1-12/15).  He volunteered the 12/15 completion date so I put fines in the contract if substantial work was not completed by 12/25.  From the architectural drawings, the only thing that changed during the project was the size of one window and the additional removal of a 3 foot interior wall.
  10/1, the work started and within the first two weeks, excavation was done, the foundations were poured, the framing was done and the windows and trusses were ordered.  Within a month the trusses and roof were on and the windows were installed.  So far, so good, but this was all done by one sub.
  Then things started going in slow motion.  I moved out for the month of November so they could get the dusty indoor work done without disturbing my family.  There were only 3 things completed in November, the electrical was roughed in, two small (5 foot and 3 foot) non-load bearing walls were removed and there was a day or two of digging on a retaining wall.  Disappointed in the progress I asked him twice for a schedule with the remaining tasks and dates.  Although he said he could provide one, he never did.
  He was supposed to have the drywall and insulation done by December 1st (a date again volunteered by him), so my HVAC contractor could install a ductless heat pump.  I had to push out that date by 2 weeks.  Also due to him missing the schedule, I was heating an uninsulated room for 3 days.
  For the siding, outsulation and exterior window trim, he set up 3 meetings to go over it with my architect.  The first one, the sider didn?t show.  I wasn?t around for the 2nd one.  The third time he sent a sider who had never worked with outsulation before.  To his credit, he paid for the 3rd meeting.  Although the architectural drawings went into explicit detail, the sider required handholding to understand them.  My architect was visibly frustrated explaining the installation process to him over the language barrier.   The sider charged $8000 for 4 days of work.  It was $2900 over Joe?s original bid.   This seemed high for 2 reasons.  1. A bid from a competitor who specialized in green building, had worked with my architect before and was familiar with outsulation bid $5600.   2. When I asked the sider why the caulk job was so bad, he revealed he had used a random day laborer to help.  When I asked Joe about the price, he stated that the price was fair because there were several surprises, and he had asked the sider to come down in price.  Not buying this explanation, I called the sider myself.  I asked him if he had provided Joe with a bid before he started working and he said no.  I asked him if Joe had asked him to come down in price and he said no.  So Joe essentially wrote him a blank check with my money.
  By the beginning of January, electrical still hadn?t been hooked up, there were no doors or gutters and the porta-potty and trash heap remained.  I?d had enough of Joe?s work and I wanted him to tie up the loose ends, give me the final bill and get out.  I handled all of the interior work, hanging the doors, doing the trim, painting, patching the drywall and installing the flooring to wrap this up as quickly as possible.  Unfortunately, after the initial bit of electrical was done on 1/6/15, I stopped the fines.  Joe went back into slow motion.  I?ve attached a full timeline so you can get a taste of this.
  Probably the biggest debacle of the project was the exterior painting.  I had told Joe I wanted to have him do the exterior painting, but I wanted it done when the weather was nice.  Ignoring my request, his guys came out to paint on 1/15/15. It was sprinkling when they arrived, but they shrugged it off with ?It wasn?t raining in Federal Way.?  More and more rain kept coming, so they covered their sprayer to protect it while they continued painting.  Then it started a downpour.  All the paint washed off.  They returned the next day to continue.  It rained again that day.  They didn?t prime any of the bare wood and painted it while it was soaking wet.  Not surprisingly, very little of it adhered to the wood.  I fired the sub in charge of the painters because he was supposed to do some work inside like hanging the doors and doing trim work and I didn't want him trashing my house any more. They came out again to paint, this time it wasn?t raining.  But the paint job looks terrible.  There remain bubbles, drips, uneven coloration and almost bare wood in places.  (There is one picture from the first day and all the remaining are as it looks today) I told Joe to hold payment for this until they did it right.  Joe has repeatedly told me he would make it right, but hasn?t delivered.  I scheduled a meeting with the painters to come out and review their work, but they never showed.  Also telling is Joe didn?t look at the paint job himself when he came to collect the final payment.
  Twice during the project I was approached by his subs asking for money.  Although I paid Joe the day he asked, it was clear there was a considerable delay with money flowing to his subs.  First the concrete guy showed up at my door and I got a lien notice from the company, the second was the door guy.  The door guy said, it takes a long time for Joe to pay.  It took over Joe over 2 months after his last day to collect the invoices and present me with the final bill.
  Something as simple as grading a 20 foot driveway and hauling out the trash, spanned 2 weeks to complete.  The worker trashed the retaining wall and left a bunch of concrete debris which I had to get hauled out myself (see picture).  Also of note, my circular saw mysteriously disappeared after the driveway guy used my table saw.
Here is the timeline:
Before work starts pay 1/3
10/1 Project and excavation starts
10/7 Concrete pads poured
10/10 Room, framed and sheathed
10/17 Trusses on
10/25 Roof on
10/31 Windows in
11/4 Pay second 1/3
11/5 Retaining wall digging starts
11/10 Remind Joe I need the insulation and drywall done by 11/30 for a scheduled HVAC install.
11/11 I provided my door choices to order.
11/12 Rough in of electrical
11/20 Small interior walls removed
11/23 Retaining wall ordered
11/25 Retaining wall arrives
11/28 Checked on doors, still hadn?t been ordered.
12/1 I return to my home and there is no drywall or insulation.
12/3 Insulation is done
12/9 Drywall starts
12/12 Drywall is done
12/13 Retaining wall digging ends
12/15 They come out to look at siding with architect
12/16 Retaining wall done
12/17 Doors actually ordered
12/19 Siding starts
12/22 Doors supposed to arrive
12/24 Siding done
1/6/15 Electrical finish starts
1/7/15 Asked to grade the driveway and finish up
1/10/15 Gutters on
1/15/15 Awful paint job done in the rain
1/16/15 Bare wet wood painted without priming, doors come in, wrong size
1/17/15 Driveway grading starts
1/20/15 Paint job touched up but not fixed, barely painted wood, bubbles, drips, uneven coloration remains
1/21/15 Electrical finish completed
1/26/15 Doors finally come in the correct size
1/27/15 Driveway graded
4/6/15 Get and pay final bill
4/18/15 Schedule painter 4/24 to review work
4/24/15 Painter doesn?t show up
"
Recommended by71%of homeowners
Showing 1-10 of 12
FAQs for brick or stone fireplace installation projects in Bremerton, WA

A chimney liner lasts between 15 and 25 years, depending on the material. Aluminum liners last about five years, while cast-in-place liners can last up to 50 years. Regular professional inspections can reveal signs of deterioration, such as cracking or crumbling chimney walls, ensuring necessary repairs are made to maintain structural safety and efficiency.

Yes, a chimney liner is essential. It prevents dangerous heat and toxic gases from reaching surrounding materials, reducing fire risks and structural damage. A well-installed liner safeguards your masonry, directs harmful emissions outside, and enhances heating efficiency. Regular inspections and cleaning maintain your chimney liner’s performance, keeping your home secure and energy-efficient.

Creosote buildup occurs when burning wood releases tar that adheres to the chimney liner, posing a fire hazard. Regular professional chimney inspections and cleanings by qualified chimney sweeps will effectively manage creosote deposits, preventing dangerous conditions and costly repairs. Maintaining a clean chimney liner is essential for long-term performance and safety.

The Bremerton, WA homeowners’ guide to brick or stone fireplace installations

From average costs to expert advice, get all the answers you need to get your job done.